ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
458
|
Tuesday, August 04, 2015, 13:37 |
Anders Mjos | | | | | | | Problems/Solutions | Equipment for outgassing measurements removed | |
459
|
Monday, August 10, 2015, 18:01 |
Anders Mjos | | LP-SIS | | | | | In progress | Testing new center block target | Installed thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint
T3: Centre block top, outside
Monday, August 10, 2015, 18:01: Turbos started
Monday, August 10, 2015, 18:11 : Turbos at speed. Vacuum at 1.5E-5 T
Tuesday, August 11, 2015, 09:04: Opened water for HS. Vacuum stable at 5.2E-7 T. No response on RGA
Tuesday, August 11, 2015, 09:09 : Started auto-ramping to 250/100 A at 2/1 A/min.
Tuesday, August 11, 2015, 11:45: T1 857 C, T3 206 C (T2 no signal)
Tuesday, August 11, 2015, 11:45: Continue auto-ramping to 580/200 A.
Tuesday, August 11, 2015, 15:30: T1 1467, T3 816 at 580/230 A
Tuesday, August 11, 2015, 15:40: Starting cool down.
Wednesday, August 12, 2015, 09:40: Stopped turbos.
Wednesday, August 12, 2015, 13:20: Venting
The Centre block t/c was touching the TBHT terminal. Bent the t/c away from the TBHT terminal
Wednesday, August 12, 2015, 14:05: roughing
Wednesday, August 12, 2015, 14:48: Started turbos
Thursday, August 13, 2015, 09:06: Opened water for HS. Vacuum stable at 3.8E-7 T. No response on RGA
Thursday, August 13, 2015, 09:06: Started auto-ramping to 250/100 A at 2/1 A/min.
Thursday, August 13, 2015, 10:09: Aborting auto-ramping. Starting cool down. T/C shorts centre block to HS and may affect TGHT/TBHT current.
Thursday, August 13, 2015, 11:17: Turbos stopped. |
460
|
Saturday, August 29, 2015, 14:33 |
Anders Mjos | | | | | | | Problems/Solutions | Restarted IOC after power outage | Saturday, August 29, 2015, 15:50: Turbos started |
461
|
Wednesday, September 09, 2015, 08:54 |
Anders Mjos | | | | | | | In progress | Venting | Wednesday, September 09, 2015, 08:53: Turbos stopped
Friday, September 11, 2015: Vented |
462
|
Friday, September 11, 2015, 11:43 |
Anders Mjos | Ta#46 | HP-SIS | ITE | TM4 | | | Done | Ta#46 conditioning | EE is ST-200 material (AlN)
Friday, September 11, 2015, 11:0: Roughing
Friday, September 11, 2015, 12:12: Turbos started.
Friday, September 11, 2015, 12:22: Turbos at speed. Vacuum at 2.2E-5 T
Friday, September 11, 2015, 14:02: RGA on.
Monday, September 14, 2015, 08:05: Opened water for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA.
Monday, September 14, 2015, 08:08: Opened IV4
Monday, September 14, 2015, 08:11: Starting Target Heat. TGHT/TBHT 580 / 200 A at 2 / 1 A/min. Good/bad vacuum 4E-6 / 6E-6 T
Monday, September 14, 2015, 08:12: Interlock for BIAS does not clear although EE is on. Interlock cleared when beam line elements were turned on
Monday, September 14, 2015, 08:20: BIAS/EZL/EE at 30 / 15 / 1.5 kV
Monday, September 14, 2015, 08:25: Returned MB1 to remote control
Monday, September 14, 2015, 13:28: Target at temperature
Monday, September 14, 2015, 15:06: Heating TBHT to 230 A
Tuesday, September 15, 2015, 15:03: EE to 2 kV
Tuesday, September 15, 2015, 16:39: EE to 1.5 kV
Tuesday, September 15, 2015, 17:01: Starting target cool down
Wednesday, September 16, 2015, 09:01: HV and source off. Closed IV4. Turbos off
Wednesday, September 16, 2015, 12:52: RGA off. Venting |
463
|
Monday, September 14, 2015, 08:38 |
Anders Mjos | | | | | | | Problems/Solutions | RP2 increased pressure | e-fault submitted and vacuum group (Edi) notified.
Monday, September 14, 2015, 09:33: RP2 replaced by vacuum group |
464
|
Thursday, September 17, 2015, 14:05 |
Anders Mjos | Test Target | LP-SIS | | | | | In progress | New centre block test |
T1 |
Probe Inside Target Left |
T2 |
Centre block attached outside |
T3 |
Probe on table below |
T4 |
not used |
Thursday, September 17, 2015, 14:04: Roughing
Thursday, September 17, 2015, 14:59: Turbos started
Friday, September 18, 2015, 08:56: Opened HS water . Vacuum stable at 3.3E-7 T. No response on RGA
Friday, September 18, 2015, 09:11: Starting heating
Monday, September 21, 2015, 07:49: Starting heating to 100 / 50 A
Switched/corrected T/C polarity for T2 and T3
Monday, September 21, 2015, 08:47: Continue heating to 580 / 200 A
Monday, September 21, 2015, 13:08: Continue heating TBHT to 230 A
Monday, September 21, 2015, 15:48: Starting cool down
Monday, September 21, 2015, 16:14: RGA off
Tuesday, September 29, 2015, 16:30: Turbos stopped
Wednesday, September 30, 2015, 13:07 : Venting |
465
|
Friday, September 18, 2015, 11:35 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP6 nor working | found in fault state this morning. Edi consulted and fault report submitted. |
466
|
Wednesday, September 30, 2015, 16:28 |
Anders Mjos | Test Target wrapped with heat shields | LP-SIS | | | | | In progress | New centre block test |
T1 |
Probe Inside Target Left |
T2 |
|
T3 |
Probe Inside Target Right (touching tube) |
T4 |
|
Wednesday, September 30, 2015, 16:28: Roughing
Wednesday, September 30, 2015, 17:01: Turbos started
Wednesday, September 30, 2015, 17:09 : Turbos at speed. Vacuum at 3.4E-5 T
Thursday, October 01, 2015, 08:51: Opened HS water. No response on RGA. Vacuum stable at 7.2E-7 T
Thursday, October 01, 2015, 08:53: Atutoramping started to 580 / 230 A
Thursday, October 01, 2015, 09:49: Changed polarity on T3
Tuesday, October 06, 2015, 08:03: Turbos stopped
Tuesday, October 06, 2015, 09:54: Venting
|
467
|
Friday, October 02, 2015, 08:35 |
Anders Mjos | | | | | | | Problems/Solutions | Venting beam line for TP exchange | Friday, October 02, 2015, 08:35: Turbo stopped |
468
|
Wednesday, October 07, 2015, 11:16 |
Anders Mjos | SiC#32 | HP-FEBIAD | ITW | TM2 | | | In progress | Conditioning SiC#32 | Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09 Turbos started
Wednesday, October 07, 2015, 12:18: Turbos at speed. Vacuum at 1.7E-5 T
Thursday, October 08, 2015, 08:55: Pumping down gas lines.
Thursday, October 08, 2015, 09:09: Opened gas line
Thursday, October 08, 2015, 09:24: Opened HS water line. Vacuum stable at 3.3E-7 T. No response on RGA
Thursday, October 08, 2015, 09:32: PS on. Starting autoramping to 580/300 A at 2/1 A/min good/bad vacuum at 1E-6 and $E-6
Thursday, October 08, 2015, 09:41: BIAS/EZL/EE to 30/15/1.5 kV
Thursday, October 08, 2015, 09:42: COIL to 50 A ANODE to 200 V
ANODE developed a short Thursday evening. Target was cooled down and will be inspected.
Friday, October 09, 2015, 12:36: Stopped turbos.
Friday, October 09, 2015, 13:26: Venting |
469
|
Tuesday, October 13, 2015, 07:47 |
Anders Mjos | SiC#32 | HP-FEBIAD | ITW | TM2 | | | In progress | Conditioning SiC#32 | Target was pumped down on Friday.
Tuesday, October 13, 2015, 07:47: Opened water for HS. No response on RGA. Vacuum stable at 2.2E-7 T
Tuesday, October 13, 2015, 07:59: Gas lines open.
Tuesday, October 13, 2015, 08:00: IV4 opened
Tuesday, October 13, 2015, 08:04: BIAS/EZL/EE to 30 / 15 1.5 kV
Tuesday, October 13, 2015, 08:04: ANODE 200 V, COIL 50 A
Tuesday, October 13, 2015, 08:04: Ramping up heaters
Short on ANODE/CATHODE again. Ramping down.
Tuesday, October 13, 2015, 15:22: Turbos stopped.
Tuesday, October 13, 2015, 16:05: Venting |
470
|
Tuesday, October 13, 2015, 16:04 |
Anders Mjos | | | | | | | Problems/Solutions | IV4 timed out | Contacted Graham W. (controls) to have a look. It turned out to be a limit switch problem. Removed and reinstalled limit switch solved the time out issue. |
471
|
Tuesday, October 13, 2015, 17:23 |
Anders Mjos | SiC#32 | HP-FEBIAD | ITW | TM2 | | | In progress | Conditioning SiC#32 | Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07: Started turbos.
Tuesday, October 13, 2015, 18:15: Turbos at speed. Vacuum at 1.9E-5 T
Wednesday, October 14, 2015, 07:55: Vacuum at 4.0E-7 T. Pumping on gas lines.
Wednesday, October 14, 2015, 08:00: Opened HS water. No response on vacuum or RGA.
Wednesday, October 14, 2015, 08:03: Ramping heaters to 580 / 300 A
Wednesday, October 14, 2015, 08:10: Opening gas lines.
Wednesday, October 14, 2015, 08:14: IV4 opened.
Wednesday, October 14, 2015, 16:00: RP2 replaced. See separate e-log entry.
Wednesday, October 14, 2015, 16:32: TBHT 305 A
Wednesday, October 14, 2015, 17:02: Opened He. - 5.6
Wednesday, October 14, 2015, 19:15: Started cool down of target.
Wednesday, October 14, 2015, 19:16 : Closed gas valves.
Thursday, October 15, 2015, 06:22: Source off. Stopped turbos. RGA off.
Thursday, October 15, 2015, 07:46: Venting
The bolt on the right side TGHT leg was difficult to remove. Se separate e-log entry |
472
|
Wednesday, October 14, 2015, 16:13 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:RP2 replaced | by vacuum group. The pump was making more noise than usual. |
473
|
Thursday, October 15, 2015, 11:19 |
Anders Mjos | | | | | | | Problems/Solutions | Right side TGHT connector block removed | The keensert has been worn out and will be replaced.
The keensert was re-tapped and the block re-installed. New bolts used for TGHT connection (2x). Swagelok T connections shortened (pluged). |
474
|
Friday, October 16, 2015, 12:26 |
Anders Mjos | Target tube only | | | | | 41120-4 | In progress | Conditioning HS for UC#14 | Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06: Started turbos.
Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T
IG1 filament beeing replaced.
Thursday, October 22, 2015, 13:56: Leak on water lines (pressurized all lines except HS line with helium)
Thursday, October 22, 2015, 13:57: Stopping turbos. RGA off.
Thursday, October 22, 2015, 15:02: Venting
Re-tightened all newly installed fittings.
Thursday, October 22, 2015, 15:41: Roughing
Thursday, October 22, 2015, 16:12: Turbos started.
Thursday, October 22, 2015, 16:22: Turbos at speed. Vacuum at 1.2 E-5 T. RGA on
Monday, October 26, 2015, 08:42: Stopped turbos. Water leak still present. RGA off.
Tuesday, October 27, 2015, 08:57: Venting
Tuesday, October 27, 2015, 14:25: roughing
Tuesday, October 27, 2015, 15:03: Turbos started.
Water can still be seen on the RGA when the TGHT cooling lines are pressurized.
Thursday, October 29, 2015, 14:00: Stopped turbos. RGA off.
Monday, November 02, 2015, 08:30: Venting |
475
|
Monday, October 19, 2015, 09:45 |
Anders Mjos | | | | | | | Problems/Solutions | IG1 filament dead | Will went chamber to replace the filament.
See e-fault 8501
Monday, October 19, 2015, 09:43: turbos stopped
Monday, October 19, 2015, 10:19: Venting
Monday, October 19, 2015, 15:36: Gauge replaced by Anthony.
Monday, October 19, 2015, 15:36: Roughing
Monday, October 19, 2015, 16:05: Turbos started
Monday, October 19, 2015, 16:13: Turbos at speed. Vacuum does not display correct value (1E-11 T)
Tuesday, October 20, 2015, 08:14: Switched on controller. Gauge seem to operate fine. |
476
|
Monday, October 19, 2015, 15:39 |
Anders Mjos | | | | | | | Problems/Solutions | Exhaust came off the new RP2 |
Anders Mjos wrote: |
by vacuum group. The pump was making more noise than usual.
|
It seems the exhaust line is blocked which caused pressure to build up and eventually forced the exhaust tube off RP2 as RP1 was roughing down the vacuum chamber.
Vacuum group has been notified and will ask plant group to investigate.
Plant group has removed the blockage. Exhaust lines are reconnected to the roughing pumps. |
477
|
Monday, November 02, 2015, 12:47 |
Anders Mjos | | | | | | | Problems/Solutions | Removed Swagelok T from rioght TGHT water lines | Mico replaced the T's with copper tube and leak checked.
Monday, November 02, 2015, 12:46: Roughing
Monday, November 02, 2015, 13:19: Starting turbos
Monday, November 02, 2015, 13:27: Turbos at speed. Vacuum at 2.6E-5 T. RGA on
Tuesday, November 03, 2015, 08:23: Pressurized TGHT line with 70 psi He. No response on vacuum or RGA.
Tuesday, November 03, 2015, 08:38: Opened water supply all lines. Vacuum stable at 6.8E-7 T. No response on RGA |
|