Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 33 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  419   Monday, January 05, 2015, 09:06 Anders Mjos      Problems/SolutionsTSG:TP1A found to be timed out after the HollidaysVacuum at 1.7E-7 T
Corrected title from off to timed
out . It seems the controller lost contact
  
  420   Monday, January 05, 2015, 09:20 Anders Mjos      Problems/SolutionsIV4 did not get close signal before the HollidaysThe valve closes physically, but does not
receive the closed signal.
Cycled the valve multiple times before
  
  421   Tuesday, January 20, 2015, 14:31 Anders Mjos      Problems/SolutionsNe leak disconnected for recallibrationSN 11-231 from VIC   
  422   Wednesday, January 21, 2015, 13:40 Anders Mjos      In progressHV BIAS TestWednesday, January 21, 2015, 13:34: Opened
water flow.
Wednesday, January 21, 2015, 13:42:
  
  423   Wednesday, January 28, 2015, 10:40 Anders Mjos      Problems/SolutionsTest Stand shut down for site wide power outage todayFriday, January 30, 2015, 10:50: Optics
section accidentally vented during work on
the ER
  
  424   Tuesday, February 03, 2015, 09:40 Anders Mjos      Problems/SolutionsRGA installationTuesday, February 03, 2015, 09:40: Venting
RGA installed on the 12" CF
port below the Source Tray.
 2015-02-04-1340.png 
  425   Tuesday, February 03, 2015, 14:33 Anders MjosEmptyLP-SIS    In progressTarget with new center block and new EE insulatorAlso with newly installed RGA
Tuesday, February 03, 2015, 14:33:
Roughing
 2015-02-04-1530trace.pngLP-SIS-newCenterBlock_Feb_05_2015.zip 
  426   Tuesday, February 03, 2015, 16:10 Anders Mjos      Problems/SolutionsCurrent read back on TBHT has been corrected to 600 A By controls group   
  427   Friday, February 13, 2015, 13:59 Anders Mjos      Problems/SolutionsPLC failureThe PLC CPU came out of the socket around
11:50am today (Dave Morris). The CPU had
not been properly attached. This resulted
  
  428   Tuesday, February 17, 2015, 14:41 Anders Mjos      In progressPumping down empty chamberTuesday, February 17, 2015, 14:35: Roughing.
Doors were difficult to get to seal.
Tuesday, February 17, 2015, 15:11:
  
  429   Wednesday, February 18, 2015, 13:32 Anders Mjos      Problems/SolutionsSwitched off system in preparation for power outageThursday, February 19, 2015, 12:14: Starting
system again after the power outage
Thursday, February 19, 2015, 13:27:
  
  430   Thursday, February 26, 2015, 10:11 Anders Mjos      In progressInstalling FEBIAD test target for emittance rig testsThursday, February 26, 2015, 10:11: Stopped
turbos
Thursday, February 26, 2015, 11:23:
 ER_Test_w_FEBIAD.docxFebiadTS.xls 
  431   Monday, March 16, 2015, 18:53 Anders MjosTa#45HP-SISITETM438817-5 In progressConditioning Ta#45 Monday, March 16, 2015, 18:53: Started
turbos
Monday, March 16, 2015, 19:00: Turbos
 Ta#45_Test_Stand.docxTa#45_2015-03-17_Mar_17_2015_09-05-31_AM.ana 
  432   Tuesday, March 24, 2015, 09:50 Anders Mjos      In progressEmpty chamberRoughed down on Friday 20th
Tuesday, March 24, 2015, 09:49: Turbos
started
  
  434   Thursday, April 09, 2015, 11:21 Anders Mjos      Problems/SolutionsNo RGA communcationsRGA stopped working. Likely after a spark
yesterday.
  
  435   Monday, April 13, 2015, 13:07 Anders Mjos      Problems/SolutionsISAC Test Stand Optical elements power supply drop out See e-fault 8027 
Monday, April 13, 2015
Kevin and Graham are working on it
  
  436   Wednesday, April 22, 2015, 13:17 Anders Mjos       Source Tray Removed by Mico, Dan and Anders   
  437   Friday, April 24, 2015, 12:25 Anders Mjos      Problems/SolutionsBacking line pressure highTSG:RP1 backing line pressure is >200
mT. An e-fault has been submitted to have
the roughing pump replaced.
  
  439   Monday, May 04, 2015, 09:51 Anders Mjos      Problems/SolutionsFEBIAD Coil power supply replaced Power supply did not work after high
voltage conditioning. On Friday May 1st John
Chow replaced the power supply with a 
  
  440   Friday, May 08, 2015, 09:07 Anders Mjos      Problems/SolutionsEPICS lost contact with the PLCEverything shut down, while EPICS showed
everyhing to be on.
Controls group (Dave Morris) has
  
ELOG V2.9.2-2455