ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject
  419   Monday, January 05, 2015, 09:06 Anders Mjos      Problems/SolutionsTSG:TP1A found to be timed out after the Hollidays

Vacuum at 1.7E-7 T

Corrected title from off to timed out . It seems the controller lost contact with the pump when I touched the rack. The pump recovered right back to 38 kRPM upon restart.

 

  420   Monday, January 05, 2015, 09:20 Anders Mjos      Problems/SolutionsIV4 did not get close signal before the Hollidays

The valve closes physically, but does not receive the closed signal.

Cycled the valve multiple times before finally showing closed state.

  421   Tuesday, January 20, 2015, 14:31 Anders Mjos      Problems/SolutionsNe leak disconnected for recallibration

SN 11-231 from VIC

  422   Wednesday, January 21, 2015, 13:40 Anders Mjos      In progressHV BIAS Test

Wednesday, January 21, 2015, 13:34: Opened water flow.

Wednesday, January 21, 2015, 13:42: 30 / 15 kV (BIAS / EZL)

Wednesday, January 21, 2015, 13:4: 40 / 20 kV

Wednesday, January 21, 2015, 13:54: No sparks.

Wednesday, January 21, 2015, 13:56: 50 / 25 kV

Wednesday, January 21, 2015, 14:0: No sparks

Wednesday, January 21, 2015, 14:11: 55 / 30 kV

Wednesday, January 21, 2015, 14:45: No sparks

Wednesday, January 21, 2015, 14:47: 60 / 30 kV and  37 / 122 uA

Wednesday, January 21, 2015, 16:00: No sparks.

Wednesday, January 21, 2015, 16:02: PS off.


Thursday, January 22, 2015, 10:18 : Started TBHT heating

Thursday, January 22, 2015, 10:26: Opened isolation valve


Friday, January 23, 2015, 09:45: 30 / 15 kV

ANODE 200 V
COIL 0 A
EE -1400

Friday, January 23, 2015, 09:46: TBHT auto heating to 280 A (235)

Friday, January 23, 2015, 10:05
COIL 5.4 A 4.9 V

 Friday, January 23, 2015, 10:13: 40 / 17 kV

Coil voltage limited. Reduced to 0 A - minimal impact on FC0 current.

Friday, January 23, 2015, 10:24: 50 / 22 kV

Friday, January 23, 2015, 10:42: 60 / 26 kV

Friday, January 23, 2015, 11:45: Sparking activity. Seen and heard by people in the area.

Friday, January 23, 2015, 12:00: Reduced current limit on BIAS PS to 0.10 (on the pot)

Friday, January 23, 2015, 12:04: A couple more sparks.

Friday, January 23, 2015, 12:05: Anode current limited since shortly after the large spark at 11:45

Friday, January 23, 2015, 12:11: 50 / 23 kV

Friday, January 23, 2015, 12:48 : Restarted turbos after the spark. TP1B and TP6

Friday, January 23, 2015, 13:16: 55 / 25 kV

Friday, January 23, 2015, 14:44: ~ 5 sparks / hour for the last 60 min

Friday, January 23, 2015, 15:49 : No sparks for the last 60 min. Cooling target.

Friday, January 23, 2015, 16:14: Source and HV off.


Monday, January 26, 2015, 11:15: TBHT at 235A set point


Tuesday, January 27, 2015, 10:13: Source on

Tuesday, January 27, 2015, 10:13: 30 / 15 kV

Tuesday, January 27, 2015, 10:59: COIL to 3.5 A

Tuesday, January 27, 2015, 11:15: 40 / 20 kV

Tuesday, January 27, 2015, 13:17: 50 / 23 kV

Tuesday, January 27, 2015, 16:56: No sparks for the last 3 h. 1 spark earlier.

Tuesday, January 27, 2015, 16:59 30 / 14 kV

Tuesday, January 27, 2015, 17:02: Cooling down target. Source and HV off.

  423   Wednesday, January 28, 2015, 10:40 Anders Mjos      Problems/SolutionsTest Stand shut down for site wide power outage today

Friday, January 30, 2015, 10:50: Optics section accidentally vented during work on the ER


Monday, February 02, 2015, 13:24: Roughing TMS section

Monday, February 02, 2015, 13:39: Starting turbos

Monday, February 02, 2015, 13:45: Turbos at speed

Monday, February 02, 2015, 13:49: Vacuum at 5.7 E-5 T


Tuesday, February 03, 2015, 09:00: Vacuum low 1E-6 T. Backing pressure high ~ 75 mT. Caused by TP6.

Tuesday, February 03, 2015, 09:01: Turbos stopped to investigate vent screw on TP6.

Tuesday, February 03, 2015, 09:40: Venting through TP6

Gasket on the TP6 venting screw had fallen off. Re-installed.

Tuesday, February 03, 2015, 09:57: Roughing

Tuesday, February 03, 2015, 10:32: Started turbos

Tuesday, February 03, 2015, 10:45: Turbos at speed. Vacuum at 1.3E-5 T

  424   Tuesday, February 03, 2015, 09:40 Anders Mjos      Problems/SolutionsRGA installation

Tuesday, February 03, 2015, 09:40: Venting

RGA installed on the 12" CF port below the Source Tray.


Wednesday, February 04, 2015, 13:45: RGA turned on and mass scan performed.

Attachment 1: 2015-02-04-1340.png
2015-02-04-1340.png
  425   Tuesday, February 03, 2015, 14:33 Anders MjosEmptyLP-SIS    In progressTarget with new center block and new EE insulator

Also with newly installed RGA

Tuesday, February 03, 2015, 14:33: Roughing

Tuesday, February 03, 2015, 15:05: Turbos started

 Tuesday, February 03, 2015, 15:15: Turbos at speed. Vacuum at 3.3E-5 T


Wednesday, February 04, 2015, 13:56: Cooling water on HS circuit on. No response on IG1 or on the RGA (water)


Thursday, February 05, 2015, 09:00: RGA started. Scan 1-100 every 5 min

Thursday, February 05, 2015, 09:02: Opened IV4

Thursday, February 05, 2015, 09:16: Started target heating to 500 / 150 A at 2 / 1 A/min

Thursday, February 05, 2015, 09:24: Opened electrical cage to switch on TGHT PS

Thursday, February 05, 2015, 09:26 : Started target heating to 500 / 150 A at 2 / 1 A/min

Thursday, February 05, 2015, 09:28: BIAS/EZL/EE on and at HV

Thursday, February 05, 2015, 13:21: TGHT voltage limited. Voltage limit increased to 7 V

Thursday, February 05, 2015, 13:53: Continue to 580 A

Thursday, February 05, 2015, 14:25: RGA stopped around 13:34. Started scanning again

Thursday, February 05, 2015, 15:08: Heating to 200 A on TBHT


Friday, February 06, 2015, 10:34: Heating TBHT to 220 A

Friday, February 06, 2015, 11:07: TBHT at 230 A. TGHT at 580 A

Friday, February 06, 2015, 11:50: Cooling down target

Friday, February 06, 2015, 11:56: RGA  off

Friday, February 06, 2015, 11:5: BIAS/EZL/EE off


Tuesday, February 10, 2015, 11:34: BIAS/EZL/EE on. Started heating to 580 / 230 A at 4 / 2 A/min. RGA on


Monday, February 16, 2015, 08:46: BIAS/EZL/EE on

Monday, February 16, 2015, 09:13 : Started heating to 580 / 230 A at 4 / 2 A/min. RGA on

Monday, February 16, 2015, 10:10: Opened isolation valve

Monday, February 16, 2015, 14:23: TGHT was found voltage limiting at 7 V. Increased voltage limit to 7.2 V

Temperature read with digital optical pyrometer. Inside target 1800 - 1900 deg C. Outside 1900 - 2000 deg C

Monday, February 16, 2015, 15:50: Starting cool down


Tuesday, February 17, 2015, 08:30: RGA off

Tuesday, February 17, 2015, 08:32: BIAS/EZL/EE off. Isolation valve closed.

Tuesday, February 17, 2015, 08:34: Turbos off

Tuesday, February 17, 2015, 13:58: Venting

Attachment 1: 2015-02-04-1530trace.png
2015-02-04-1530trace.png
Attachment 2: LP-SIS-newCenterBlock_Feb_05_2015.zip
  426   Tuesday, February 03, 2015, 16:10 Anders Mjos      Problems/SolutionsCurrent read back on TBHT has been corrected to 600 A

 By controls group

  427   Friday, February 13, 2015, 13:59 Anders Mjos      Problems/SolutionsPLC failure

The PLC CPU came out of the socket around 11:50am today (Dave Morris). The CPU had not been properly attached. This resulted in full stop of all power supplies and vacuum pumps.

Restarted vacuum pumps at 12:10pm (20 min later).

  428   Tuesday, February 17, 2015, 14:41 Anders Mjos      In progressPumping down empty chamber

Tuesday, February 17, 2015, 14:35: Roughing. Doors were difficult to get to seal.

Tuesday, February 17, 2015, 15:11: Started turbos

Tuesday, February 17, 2015, 15:34: Turbos at speed. Vacuum at 6.7E-6 T

  429   Wednesday, February 18, 2015, 13:32 Anders Mjos      Problems/SolutionsSwitched off system in preparation for power outage

Thursday, February 19, 2015, 12:14: Starting system again after the power outage

Thursday, February 19, 2015, 13:27: The performance of RP1 has degraded. Edi flushed some air through, which helped a bit. It now takes longer to start up.

Thursday, February 19, 2015, 13:33: Vacuum recovered.

  430   Thursday, February 26, 2015, 10:11 Anders Mjos      In progressInstalling FEBIAD test target for emittance rig tests

Thursday, February 26, 2015, 10:11: Stopped turbos

Thursday, February 26, 2015, 11:23: Venting

Thursday, February 26, 2015, 11:39: Stopped venting at 550 T. To be continued later

Thursday, February 26, 2015, 15:46: Started roughing. Doors needed a push.

Thursday, February 26, 2015, 16:23: Started turbos

Thursday, February 26, 2015, 16:39: Turbos at speed. Vacuum at 5.2E-6 T


Friday, February 27, 2015, 09:22: Water on. Vacuum stable at 1.6E-7 T

Friday, February 27, 2015, 09:30: RGA on

Friday, February 27, 2015, 10:32: HV on. Ramping to TBHT 250 A at 4A/min

Friday, February 27, 2015, 16:38: Source off


Monday, March 02, 2015, 14:00: Gas lines purged. Opening.

Fixed a air leak on one of the Swagelok joints.

Monday, March 02, 2015, 14:47: RGA with Ne Open

Total 3.5E0-7T, IG1 9.7E-8 T
20Ne 6.3E-10 T
22Ne 1.7E-10 T

Mass 18 1.6E-7 T


Tuesday, March 03, 2015, 09:58: Started heating

Tuesday, March 03, 2015, 16:33: Finished ER testing. First ER scans made on mass 4.


Wednesday, March 04, 2015, 14:32: TSG:CB1 found off. Switched back on.

Emittance vs EE voltage studied


Thursday, March 05, 2015, 09:02 : Ramping source back up to 285 A (TBHT)

Thursday, March 05, 2015, 15:12: The following devices were found off

TMS:Q6
TMSQ1
TPS:CBC


Friday, March 06, 2015, 08:51: Found TPS:Q3 off. Switched back on.

Friday, March 06, 2015, 10:51 : Ramping down source

Friday, March 06, 2015, 12:08 : Source and HV off. Closed IV.

Graham will be doing some controls work


Monday, March 09, 2015, 09:16: Ramping up the source. IV opened

Monday, March 09, 2015, 09:23: Source biased and optics tune recovered.

Monday, March 09, 2015, 16:51: Opened Ne leak


Wednesday, March 11, 2015, 09:06: Found TMS:Q6/Q1 and TPS:Q4 off. Switched back on.


Thursday, March 12, 2015, 16:57: Finished more ER data taking. See attached spreadsheet


Friday, March 13, 2015, 08:41 : TMS:CBC1, TMS:CB5, TMS:Q2, TPS:Q3, TPS:CB2 found off. Switched back on.


Monday, March 16, 2015, 09:13: TMS:CBC1, TMS:Q3, Q2, TMS:VCB1,CB1 found off.

Monday, March 16, 2015, 09:14: Bias off. Stopping turbos

Monday, March 16, 2015, 15:26: Venting

Attachment 1: ER_Test_w_FEBIAD.docx
Attachment 2: FebiadTS.xls
  431   Monday, March 16, 2015, 18:53 Anders MjosTa#45HP-SISITETM438817-5 In progressConditioning Ta#45

 Monday, March 16, 2015, 18:53: Started turbos

Monday, March 16, 2015, 19:00: Turbos at speed. Vacuum at 1.3E-5 T


Tuesday, March 17, 2015, 09:03: Opened cooling water. Vacuum stable at 1.9E-7 T

Tuesday, March 17, 2015, 09:12: Opened IV4. BIAS/EZL/EE to 30/14/1.5 kV

Tuesday, March 17, 2015, 09:20: Started heating TGHT/TBHT to 400/150 A at 2/1 A/min


Wednesday, March 18, 2015, 08:41: Continued heating TGHT/TBHT to 580/170 A at 2/1 A/min

Wednesday, March 18, 2015, 09:33: MB1 found tripped on water flow. Water pressure is low this morning as cyclotron main magnet was switched on, but not all water pumps. Expected to be resolved soon..

Some emittance scans at 170, 180, 190, 200 A TBHT were done


Thursday, March 19, 2015, 08:47: Heating TBHT to 220 A

Thursday, March 19, 2015, 08:56: Heating TBHT to 230 A

Thursday, March 19, 2015, 10:50: EE at -2000 V for 10 min

Thursday, March 19, 2015, 10:52: EE back at -1.5 kV

Thursday, March 19, 2015, 17:54: Started cool down of target


Friday, March 20, 2015, 08:47: Closed IV4

Friday, March 20, 2015, 08:47: RGA off.

Friday, March 20, 2015, 08:50: Stopped turbos

Friday, March 20, 2015, 10:24: Venting

Friday, March 20, 2015, 11:45: Target removed.

Attachment 1: Ta#45_Test_Stand.docx
Attachment 2: Ta#45_2015-03-17_Mar_17_2015_09-05-31_AM.ana
  432   Tuesday, March 24, 2015, 09:50 Anders Mjos      In progressEmpty chamber

Roughed down on Friday 20th

Tuesday, March 24, 2015, 09:49: Turbos started

Tuesday, March 24, 2015, 09:59: Turbos at speed. Vacuum at 2.8E-6 T


EPICS could not communicate with devices. Contacted controls (Dave M)

Thursday, April 02, 2015, 14:45: Stopped turbos.

Thursday, April 02, 2015, 15:10: Started venting through turbo pump (to 16 T)

Thursday, April 02, 2015, 15:12: Venting through VV1

  434   Thursday, April 09, 2015, 11:21 Anders Mjos      Problems/SolutionsNo RGA communcations

RGA stopped working. Likely after a spark yesterday.

  435   Monday, April 13, 2015, 13:07 Anders Mjos      Problems/SolutionsISAC Test Stand Optical elements power supply drop out

 See e-fault 8027 

Monday, April 13, 2015
Kevin and Graham are working on it

 

 

 

 

  436   Wednesday, April 22, 2015, 13:17 Anders Mjos       Source Tray Removed

 by Mico, Dan and Anders

  437   Friday, April 24, 2015, 12:25 Anders Mjos      Problems/SolutionsBacking line pressure high

TSG:RP1 backing line pressure is >200 mT. An e-fault has been submitted to have the roughing pump replaced.

Friday, April 24, 2015, 13:13: Pump replaced by vacuum group.

  439   Monday, May 04, 2015, 09:51 Anders Mjos      Problems/SolutionsFEBIAD Coil power supply replaced

 Power supply did not work after high voltage conditioning. On Friday May 1st John Chow replaced the power supply with a 12 V 100 A power supply temporary while the other supply is being repaired. EPICS controls have not been adjusted.

  440   Friday, May 08, 2015, 09:07 Anders Mjos      Problems/SolutionsEPICS lost contact with the PLC

Everything shut down, while EPICS showed everyhing to be on.

Controls group (Dave Morris) has reestablished contact. System is operations.

TSG section vented for Source Tray work

Friday, May 08, 2015, 09:13: TMS turbos at speed. Vacuum at 1.2E-5 T