Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 32 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  357   Wednesday, January 29, 2014, 14:42 Anders Mjos      Problems/SolutionsValved off water to TSG and TMS:MB1CuLCW will be shut off tomorrow. Valved
off water supply to MB1 and TSG to minimize
air into the system. Turbos are off.
  
  358   Thursday, January 30, 2014, 15:38 Anders Mjos      Problems/SolutionsStarting turbos after CuLCW shut off

    

       
            
  
  359   Wednesday, February 05, 2014, 11:27 Anders Mjos      Problems/SolutionsEmittance Rig installationWednesday, February 05, 2014, 11:27 : Stopped
turbos

    2x spacers ITD0468 1/8"
 Spacers_Installed.jpgEmittance_Rig_Inside.jpgEmittance_Rig_Outside.jpg 
  360   Wednesday, February 12, 2014, 09:01 Anders Mjos      In progressTesting Cleaning sampleWednesday, February 12, 2014, 08:55: Stopped
turbos 
Wednesday, February 12, 2014, 11:28:
  
  361   Friday, March 07, 2014, 11:38 Anders Mjos      Problems/SolutionsTMS:TP2 stopped over nightSee fault report 7240

Tuesday, March 11, 2014,
09:04: Stopping TMS:TP6. Vacuum at 9.7E-6
  
  362   Tuesday, March 11, 2014, 09:03 Anders Mjos      Problems/SolutionsLeak on water line for Heat ShieldTuesday, March 11, 2014, 09:03: Venting
to investigate
  
  363   Wednesday, March 12, 2014, 10:20 Rick Maharaj      Donereplace heatshield waterline loopA new Heatshield waterline loop was manufactured
and installed to replace the old one which
had a leak.
  
  365   Friday, March 21, 2014, 13:55 Anders Mjos      In progressPumping down empty chamberRoughing
Friday, March 21, 2014, 13:59: Starting
turbos
  
  366   Friday, March 21, 2014, 14:12 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2The performance of the roughing pump has
gradually gone down. Notably after the system
has been vented. See attached screenshot
 TMSCG2_2014-03-21.png 
  372   Wednesday, April 23, 2014, 09:37 Anders Mjos      Problems/SolutionsStarted Sources archiverThe archiver was not running   
  373   Wednesday, April 23, 2014, 14:16 Anders Mjos      DoneCu-strip cleaning test - sample #1, not cleanedWednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34
: Starting turbos
 Front_2014-04-24_2_05_56_PM.jpgSide_2014-04-24_2_06_12_PM.jpg 
  374   Monday, April 28, 2014, 10:23 Anders Mjos      In progressCu-strip cleaning test - sample #2, cleanedMonday, April 28, 2014, 10:23: Started
roughing
Monday, April 28, 2014, 10:48: Started
  
  375   Thursday, May 08, 2014, 15:09 Anders Mjos      Problems/SolutionsSOURCES archiver reported stopped Archiver restarted.   
  376   Friday, May 09, 2014, 10:48 Anders Mjos      Problems/SolutionsEPICS white-out e-fault 7380Monday, May 12, 2014, 10:02: Jane R. power
cycled the hardware. EPICS is back up. Sources
archiver required a restart.
  
  378   Thursday, May 15, 2014, 14:58 Anders Mjos      Problems/SolutionsIOC rebooted to recover from white-out.Restarted archivers.   
  379   Tuesday, May 20, 2014, 11:17 Anders Mjos      Problems/SolutionsBurnt off GND connection on Service CapThe ground connection between B and F (ISK4523D
Rev 6) was found burnt off. It will be switched
out as per CATHODE BIAS configuration (ISK4563D
  
  380   Tuesday, May 20, 2014, 12:39 Anders Mjos      DoneFEBIAD Cathode Negative BIAS configurationAs per ISK4562 Rev 3 and ISK4563 Rev 3
By Ray D. and co.
  
  383   Thursday, June 12, 2014, 09:28 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2

    

       
            
  
  385   Monday, June 16, 2014, 09:12 Anders Mjos      In progressEmpty chamberMonday, June 16, 2014, 09:12: Roughing

Tuesday, June 17, 2014, 14:38:
Venting 
  
  387   Wednesday, June 18, 2014, 09:23 Anders Mjos      Problems/SolutionsTSH:MB1 Trip & MB1 June 10th water leakA water leak on MB1 was found and reported
by operations on June 10th e fault 7429
MB1 can not be switched on due to
  
ELOG V2.9.2-2455