475
|
Monday, October 19, 2015, 09:45 |
Anders Mjos | | | | | | | Problems/Solutions | IG1 filament dead | Will went chamber to replace the filament.
See e-fault 8501
Monday, October 19, 2015, 09:43: |
|
476
|
Monday, October 19, 2015, 15:39 |
Anders Mjos | | | | | | | Problems/Solutions | Exhaust came off the new RP2 |
|
|
477
|
Monday, November 02, 2015, 12:47 |
Anders Mjos | | | | | | | Problems/Solutions | Removed Swagelok T from rioght TGHT water lines | Mico replaced the T's with copper tube
and leak checked.
Monday, November 02, 2015, 12:46: |
|
478
|
Tuesday, November 03, 2015, 09:00 |
Anders Mjos | Target tube only | | | | | 41120-4 | In progress | Conditioning HS for UC#14 | Tuesday, November 03, 2015, 08:59: Starting
TGHT ramping to 580 A at 1 A/min
Thursday, November 05, 2015, |
|
479
|
Monday, November 16, 2015, 14:52 |
Anders Mjos | | | | | | | In progress | Current measurement | Installed Cu-shunts on TGHT and TBHT terminals.
HS water looped.
Monday, November 16, 2015, |
|
480
|
Tuesday, November 17, 2015, 11:27 |
Anders Mjos | | | | | | | Problems/Solutions | Ran RP2 with gas ballast for 15 min | To recover performance |
|
481
|
Wednesday, December 02, 2015, 14:50 |
Anders Mjos | | | | | | | Problems/Solutions | Nitrogen supply for venting temporarely from bottle | No supply of N through the piping due to
work on the N tanks. Confirmed with Geoff
Hodgson. ISIS supply is shut off. Using a |
|
482
|
Wednesday, December 02, 2015, 15:30 |
Anders Mjos | | LP-SIS | | | | | | New centre block test | New 2x 9-pin connector grounding tool with
gripper installed.
Wednesday, December 02, 2015, 15:30: |
|
483
|
Friday, December 18, 2015, 11:44 |
Anders Mjos | | | | | | | Problems/Solutions | IG6 not reading correctly | The new controller (XGS-600) installed
for IG6 use a different voltage to pressure
conversion than the previous models. This |
|
484
|
Wednesday, January 06, 2016, 09:28 |
Anders Mjos | | | | | | | Problems/Solutions | Water leak fixed on flow sensor for HS circuit | The Swagelok fitting on the return
side of the flow sensor for the HS circuit
was tightened to stop the leak. See e-fault |
|
485
|
Monday, January 11, 2016, 09:02 |
Anders Mjos | | | | | | | | Venting | Monday, January 11, 2016, 09:02: Turbos
stopped.
Monday, January 11, 2016, 12:58: |
|
486
|
Monday, January 18, 2016, 08:41 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 nor performing | The pump failed to pump down below 2 Torr.
on Friday 15th E-fault 8680 submitted. Vacuum
group will replace the pump today |
|
492
|
Friday, January 22, 2016, 11:07 |
Anders Mjos | | | | | | | In progress | Venting | Friday, January 22, 2016, 11:07:
Stopped turbos |
|
494
|
Friday, January 22, 2016, 15:34 |
Anders Mjos | SiC | LP-SIS | | | 41077-3 | | In progress | EE coating test | Friday, January 22, 2016, 15:30: Turbos
started
Friday, January 22, 2016, 16:14: |
|
495
|
Tuesday, February 23, 2016, 10:43 |
Anders Mjos | SiC | LP-SIS | | | 41077-3 | | | EE coating test - no Plasma Electrode | Cleaned up EE and around target tube. Removed
PE
Tuesday, February 23, 2016, 10:40: |
|
496
|
Wednesday, March 02, 2016, 12:08 |
Anders Mjos | | | | | | | Problems/Solutions | TGHT insulator broken | The insulator for the TGHT terminals
cracked during an attempt to remove a seized
bolt.The right TGHT block was removed with |
|
497
|
Friday, March 04, 2016, 14:23 |
Anders Mjos | Target tube only | LP-SIS | ITW | TM2 | 39459-2 | 41120-10 | In progress | Conditiong Heat Shield for UC#15 | Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos
started |
|
498
|
Friday, March 11, 2016, 15:46 |
Anders Mjos | | | | | | | In progress | Testing end cap leak tightness | Two Ta-tubes sealed with 2 end caps each
placed in the vacuum chamber.
Friday, March 11, 2016, 15:03: Rouging |
|
499
|
Wednesday, March 16, 2016, 09:59 |
Anders Mjos | Target tube only | | | TM1 | 39459-2 | 40898-2 | In progress | Conditiong Heat Shield for UC#15 | Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58:
Roughing |
|
504
|
Friday, April 15, 2016, 16:07 |
Anders Mjos | | | | | | | Problems/Solutions | ANODE polarity switched to positive | to test the effect of extraction when biasing
of the target. |
|