ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
887
|
Tuesday, July 27, 2021, 12:57 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD parameter scan - efficiency measurements | Assembly has new gas tube to the
target for better fit and clearance to the
HS. |
|
|
888
|
Wednesday, July 28, 2021, 08:48 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD parameter scan - efficiency measurements | Modified spiral tube from VCR to
counteract torque towards the HS. Now points
towards TBHT. |
|
|
889
|
Friday, July 30, 2021, 15:34 |
Carla Babcock | | | | | | | Failed | TSG:RP1 failure | TP1A tripped off on Fernando, seems the
backing pressure got too high. Even with
PV1 closed the RP1 pump could not get below |
|
|
960
|
Wednesday, March 29, 2023, 12:22 |
Aaron Schmidt | TiC#5 | LP-FEBIAD | ITE | TM4 | 44692-7 | 45235-20 | Failed | Conditioning TiC#5 | Wednesday, March 29, 2023, 09:15: Roughing.
Wednesday, March 29, 2023, 12:22:
TP1B on. |
|
|
8
|
Tuesday, September 20, 2011, 19:00 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | Done | Finished testing TaC#1 | Tuesday, September 20, 2011:
Did another mass scan today at 5:40.
Saved as: plotdump-local-clean.txt Sept 20 |
|
|
17
|
Friday, September 30, 2011, 18:03 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Finished testing SiC#26 at the Test Stand | Today, did a did a mass scan: plotdump-local-clean.txt
Sep30 11 12-20-08.txt
Optimized a bit the tune with Friedhelm, |
|
|
18
|
Monday, October 03, 2011, 10:53 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target is ready to be removed. | Turned off the HV and locked up the transformer.
Isolated the ion source box. The target is
under vacuum and the water is still on. |
|
|
19
|
Monday, October 03, 2011, 13:56 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Venting |
|
|
|
20
|
Monday, October 03, 2011, 14:46 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target stored under vacuum |
|
|
|
21
|
Wednesday, October 12, 2011, 13:14 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target removed |
|
|
|
34
|
Friday, February 17, 2012, 10:27 |
Aurelia Laxdal | | | | | | | Done | Started the Archivers | Started both ISACT and SOURCES Archivers. |
|
|
57
|
Wednesday, March 07, 2012, 09:27 |
Friedhelm Ames | Nb#6 | | | | | | Done | water cooling started | water cooling line valves opened. No response
on vacuum TSG:IG1 3.5e-7 T |
|
|
96
|
Thursday, May 17, 2012, 08:36 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | Done | Target removed | Thursday, May 17, 2012, 08:36: Turbo pumps
switched off in preparation of target removal.
Thursday, May 17, 2012, 08:51: Purging |
|
|
103
|
Monday, June 04, 2012, 10:51 |
Anders Mjos | Ta#38 | LP-SIS | ITW | TM1 | | | Done | Venting chamber |
|
|
|
105
|
Tuesday, June 26, 2012, 16:06 |
Anders Mjos | | | | | | | Done | Vented |
|
|
|
135
|
Friday, July 06, 2012, 15:36 |
Friedhelm Ames | | | | | | | Done | switched everything off | switched everything off to prepare for
scheduled power outage on Monday |
|
|
137
|
Monday, July 09, 2012, 12:57 |
Anders Mjos | | | | | | | Done | Vented | |
|
|
143
|
Thursday, July 12, 2012, 12:23 |
Anders Mjos | | | | | | | Done | TSH:SV5 bypass on | Thursday, July 12, 2012, 15:48: bypass
removed |
|
|
144
|
Thursday, July 12, 2012, 13:41 |
Anders Mjos | | | | | | | Done | purging gas lines with air |
gas lines purged with air for
60 min (through TSHUHV1 and TSHSV4).
gas line allowed to fill with nitrogen |
|
|
151
|
Thursday, July 19, 2012, 09:35 |
Anders Mjos | | | | | | | Done | Venting to investigate leak on front door | Thursday, July 19, 2012, 09:35: Switched
off both turbos.
Thursday, July 19, 2012, 10:23: Venting |
|