880
|
Monday, June 21, 2021, 11:53 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | Failed | Ta#62 Conditioning - 2 | Replace 9-pin back to normal grounded setup. Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing chamber.
Monday, June 21, 2021, 11:50: Removed backing window. Roughing beam line side.
Monday, June 21, 2021, 12:01: Multimeters removed. Back HV rack re-grounded. TP6 & TP2 on.
Monday, June 21, 2021, 12:02: TP1B on.
Monday, June 21, 2021, 12:13: TP1A on.
Monday, June 21, 2021, 12:21: IG1 on.
Monday, June 21, 2021, 14:37: Vacuum @ 3.96e-06T. Open FS#5
Monday, June 21, 2021, 14:39: Vacuum @ 3.76e-06T.
Monday, June 21, 2021, 14:42: Power / Sources on.
Monday, June 21, 2021, 14:43; IV4 opened & Optics on
Tuesday, June 22, 2021, 07:40: Quick system check ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.7 |
4.02 |
TBHT |
24.2 |
3.18
|
COIL + EE |
23.6 |
5.11 |
TGHT |
23.8 |
5.64 |
Tuesday, June 22, 2021, 07:42: Auto-ramping TGHT / TBHT to 300 / 150 A @ 3 A per min.
Tuesday, June 22, 2021, 09:36: TGHT / TBHT @ 300 / 150 A. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, June 22, 2021, 09:38: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Tuesday, June 22, 2021, 09:46: External / cage sparks* Multiple.
Tuesday, June 22, 2021, 09:58: Turn down BIAS to 25 kV.
Tuesday, June 22, 2021, 12:45: BIAS to 30 kV.
Tuesday, June 22, 2021, 13:05: Odd. There was activity on FC0 right when the HV was turned on before the 580 ramp up. Now, no activity on FC0, or wire scans. Turning HV down / off.
Tuesday, June 22, 2021, 13:10: BIAS / EE / EZL @ 0 kV.
Tuesday, June 22, 2021, 13:41: Rear cage opened. Digital multi-meter was removed.
Tuesday, June 22, 2021, 13:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, June 22, 2021, 13:57: No beam. Auto-cooling @ 3 A per min.
Tuesday, June 22, 2021, 16:23: HV power off. Optics off. IV4 off. TGHT still cooling.
Wednesday, June 23, 2021, 04:31: IG1 & turbo pumps off.
Wednesday, June 23, 2021, 06:00: Venting. Power off. FS#5 purged. |
Attachment 1: Ta#62_Conditioning_-_2.docx
|
884
|
Wednesday, June 30, 2021, 19:08 |
Fernando Maldonado | | LP-FEBIAD | | | | | Failed | FEBIAD parameter scan - efficiency measurements | Wednesday, June 30, 2021, 19:08: Roughing
Thursday, July 01, 2021, 08:57: Turbos on
Thursday, July 01, 2021, 09:11: TP1A timed out. Reset it. Waiting for CG1A to drop a bit more.
Thursday, July 01, 2021, 09:19: TSG:BV1A interlock bypassed so that can be opened. TSGTP1A open
TP1A at speed
Thursday, July 01, 2021, 09:20: Interlock bypassed was removed.
Thursday, July 01, 2021, 09:20: IG1 on.
Wednesday, July 07, 2021, 08:52 : IgG1 @ 4.64e-7 T.
Wednesday, July 07, 2021, 08:53: Waterlines open. No vacuum response. RGA does not respond, probably the filament burnt out.
Wednesday, July 07, 2021: Gas system has a tiny leak, probably from my initial checks about two weeks ago
Wednesday, July 07, 2021: During adjustments on the gas system the copper pipe yielded a bit and the leak clearly increases. I asked Maico to prepare new VCR connection for replacement (thanks!)
Thursday, July 08, 2021: The gas system inside the Faraday cage is not leaking anymore. However, the gauge inside the service cap does not respond to any pressure changes. It needs replacement.
Friday, July 09, 2021: Gas system troubleshooted with a small nitrogen bottle. Problem was on the two-stage regulator. Tighter connection fixed it.
Power supplies respond normal
Friday, July 09, 2021, 15:19: IV4 open.
Emittance meter power supply on.
Friday, July 09, 2021, 15:22: IG1 @ 4.40e-7 T.
Friday, July 09, 2021, 15:22: Auto-ramping TGHT/TBHT to 300 A / 150A @ 2A/min
Friday, July 09, 2021, 16:06: Emittance meter was not workin. Mike Rowen rebooted the IOC and that fixed the issue.
Sunday, July 11, 2021, 16:40: IG1 @ 5.13e-7 T.
Sunday, July 11, 2021, 16:42: Auto-ramping TGHT/TBHT to 550A / 250A @ 2A/min
Sunday, July 11, 2021, 16:43. Anode @ 100 V and 500 mA current limit.
Monday, July 12, 2021, 09:15: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. - AS
FM
Monday, July 12, 2021, 09:41: Auto-ramping TGHT/TBHT to 580A / 280A @ 2A/min
There seems to be an issue with the emittance meter. The scans seems to be successful but the plot is only noise.
Tuesday, July 13, 2021, 11:51: Telescope set on the magnet viewport: Grid is fine and I will check it continuosly.
The gauge inside the service cap is working now, as it actually never broke, a manual valve was still close inside the faraday cage.
I measured the voltage sent from the emittance PS, so the emittance meter receives voltage. I think the problem might be the faraday cup, either internally, or with the signal.
Tuesday, July 13, 2021, 15:54: Venting the beamline after the magnet to re-install the mass slit.
HV off
Tuesday, July 13, 2021, 16:19: TMS:BV6 open.
Tuesday, July 13, 2021, 16:21: TMS:BV2 open.
Tuesday, July 13, 2021, 16:27: TMSTP6 and TMSTP2 on.
Tuesday, July 13, 2021, 16:32: TMSIG6 On.
Tuesday, July 13, 2021, 16:40: HV on.
Wednesday, July 14, 2021: Troubleshooting the emittance meter. I think I saw some indications of beam so it might be that I just need more intensity for a proper measurement.
Moving on, I tested the code as I want to implement a a couple of things: record a bidimensional anode current to make sure I capture any chance with the coil (if any), use temperature estimation from heating power as well.
When running a magnet-anode scan on sodium I triggered the high efficienct regime. This indicates that the cathode is either hotter or closer. With 280 A I am inclined on the latter.
The regime is unstable as the voltage fluctates as well as the ion current. Over a period of two hours
Friday, July 16, 2021, 12:08: Hv off to increase upstream pressure from |200| to |240| kPa, which is the maximum I can achieve with my two-stage regulator.
Friday, July 16, 2021, 12:15: Mass scan.
Friday, July 16, 2021, 13:54: TBHT to 260 @ -2A/min.
Friday, July 16, 2021, 14:09: HV off.
Friday, July 16, 2021, 14:17: BIAS / EE / EZL @ 30 / -1.5 / 12.5 kV.
Friday, July 16, 2021, 14:17: Mass scan ongoing. Done for the day (on-site)
Saturday, July 17, 2021: Mass scans in both normal and anomalous regime.
Sunday, July 18, 2021, 07:42: Found TSG:CBC in a red state. Using the cfg button on the canbus utilities does not work. Likely the canbus card needs to be replaced.
Monday, July 19, 2021: AS fixed the CBC
Increased anode current limit to 600 mA. More ion current.
Anode voltage setpoint=500 A, anode voltage readback=250 V.
Moving the setpoint to 250 causes no effect. But when moving the setpoint to 245 V, the ion current, and the drain current decrease.
Putting together previous findings to discuss what to do next.
Grid still fine.
Tuesday, July 20, 2021, 17:22: TBHT to 240 @ -2A/min.
Around 16:30 there was a slight target voltage drop. This coincided with the anode getting current limited (500mA) at 100V.
Tuesday, July 20, 2021, 17:47: IG1 reacts to the "sparks" observed on the anode leackage current.
Lowering the anode voltage to 0 V. I'll go on-site tomorrow to check the state of the grid and to check if there are visible sparks inside the chamber.
Wednesday, July 21, 2021, 12:40: entries from early today lost I'll try to summarize what has happened:
grid still fine
Manually sweeping the anode but no visual of any kind inside the vacuum. IG1 still reacts to sudden increase of leakage current but nothing observed inside the vacuum chamber.
anode leakage current responds to decreasing the target heating current when lowering to 235A.
When going to 200 A, the anode leakage current drop to 0 mA when the cathode reached 211.
Now the cathode gets current limited as of 1 V.
grid still fine.
Wednesday, July 21, 2021, 12:44: TGHT/TBHT to 0 A @ -2A/min
Wednesday, July 21, 2021, 14:43: TBHT @ 0 A, TGHT @ 340 A. Setting the anode voltage to 500 V has a leakage current of 102.5 mA.
Wednesday, July 21, 2021, 22:19: IV4 closed
Wednesday, July 21, 2021, 22:21: BIAS / EE / EZL @ 0.000 kV.
Wednesday, July 21, 2021, 22:22: IG1 off. Turbos off.
Thursday, July 22, 2021, 10:44: Venting:
|
Attachment 1: anomalous-ionization-regime.png
|
|
Attachment 2: Fernando_screenshots.docx
|
885
|
Thursday, July 22, 2021, 17:43 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD efficiency measurements | Thursday, July 22, 2021, 17:43: Roughing
New argon gas bottle installed.
Thursday, July 22, 2021, 18:16: Turbos on.
Thursday, July 22, 2021, 18:25: TP1A timed out. TSG:CG1A is larger than TSG:CG1, that is the roughing lines are higher than the vacuum chamber.
Thursday, July 22, 2021, 18:27: Bypassing TSG:BV1 to open it.
Thursday, July 22, 2021, 18:28: Turbo at speed.
Thursday, July 22, 2021, 18:28: Bypass removed.
Thursday, July 22, 2021, 18:28: IG1 on.
Friday, July 23, 2021, 09:16: IG1 @ 1.69e-6 T.
Friday, July 23, 2021, 09:17: Waterlines open. No vacuum response
Friday, July 23, 2021, 10:09: While checking the gas connections I found out that inside the faraday cage there are a couple of connections missing:
Coil PS chasis ground disconnected
Resistor between A and C (tbht pos and tght neg) disconnected.
Friday, July 23, 2021, 15:29: Gas system taken out to properly install a new "tee" union.
Friday, July 23, 2021, 15:29: IG1 @ 1.34e-6 T.
Friday, July 23, 2021, 15:52: Power/ sources on.
Friday, July 23, 2021, 15:54: Auto-ramping TGHT/TBHT to 580 A/ 280 A @ 2A/min
Friday, July 23, 2021, 15:58: IV4 open.
Saturday, July 24, 2021, 13:07: IG1 @ 1.25 e-6 T.
Saturday, July 24, 2021, 18:34: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark when Bias reached 30 kV.
Saturday, July 24, 2021, 18:36: Two consecutive sparks. Lowering to bias 29.5 kV to let it conditioned there for at least 10 minutes.
Saturday, July 24, 2021, 18:46: Bias to 30 kV. No sparks.
Saturday, July 24, 2021, 18:59. No sparks. IG1 @ 1.16e-6
Saturday, July 24, 2021, 19:26: Anode gets current limited as of 2 V. Maybe there is a short somewhere else either inside the vacuum box, or on the service cap. Will check tomorrow
Saturday, July 24, 2021, 19:30: BIAS / EE / EZL @ 0 kV.
Saturday, July 24, 2021, 19:30: Auto-cooling to 0 A @ -2A/min
Monday, July 26, 2021, 09:00: IG1 @ 4.58e-7 T.
Monday, July 26, 2021, 09:17: No visible sparks
Monday, July 26, 2021, 09:22: Power sources off.
Monday, July 26, 2021, 13:20: After some tests I can conclude a couple of things:
- Anode/Cathode voltage power supply works fine and draws the right current for a 100 kOhm resistor.
- When all cables are disconnected from TBHT and TGHT F/Ts there is continuity between them and HV common.
Monday, July 26, 2021, 14:52: IV4 closed
Monday, July 26, 2021, 14:53: Turbos off.
Oops!, forgot to turned off IG1 but interlock did it for me :p
Monday, July 26, 2021, 17:19: After opening the vaccum chamber I found the portion of the capillary that goes to the target was touching the heatshield. Confirmed continuity with a multimeter.
Manually move it away and no continuity confirmed with multimeter.
FTs A-D recconected.
Bypassing anode interlock to check there is no short. Confirmed.
Preparing to close and pump.
|
886
|
Monday, July 26, 2021, 17:35 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD efficiency measurements. | Monday, July 26, 2021, 17:23: Roughing
Monday, July 26, 2021, 17:55: Turbos on.
Monday, July 26, 2021, 18:03 : TP1A timed out ...again
Monday, July 26, 2021, 18:03: Bypassing BV1A. TP1A reset and on. turbos at speed.
Monday, July 26, 2021, 18:05: IG1 on.
Monday, July 26, 2021, 18:26: IG1 @ 1.97e-5 T.
Monday, July 26, 2021, 22:33: IG1 @ 2.41e-6 T
Monday, July 26, 2021, 22:33: IV4 open.
Monday, July 26, 2021, 22:55: BIAS/EZL/EE to 10/6/1 kV. No problem. All set to 0.000 kV again
Monday, July 26, 2021, 22:57: Coil to 10 A. Anode to 100 V.. No problem. All set to 0 again.
Monday, July 26, 2021, 22:59: Auto-ramping TGHT/TBHT to 580/280 A @ 2A/min.
Tuesday, July 27, 2021, 06:32: IG1 @ 1.52e-6 T.
At 01:30, approximately 10 minutes after TBHT heater reached the desired current, the anode went from 0 to 1.5 V.

Tried to put anode voltage to 100 V but it got current limited as of 2 V.
Given that before heating the anode voltage was fine, I think the gas tube move again and made contact with the heatshield.
I will need to open this again :(
Tuesday, July 27, 2021, 06:41: Auto-cooling TGHT/TBHT to 0 A @ -4A/min
Tuesday, July 27, 2021, 09:08: Heaters @ 0 A. Anode still gets current limited.
Tuesday, July 27, 2021, 09:09: IV4 close. Timed out.
Tuesday, July 27, 2021, 09:09: IG1 off.
Tuesday, July 27, 2021, 09:09: Turbos off.
Tuesday, July 27, 2021, 11:13: Venting.
Tuesday, July 27, 2021, 11:58: Gas tube move and end up touching the heatshield again. When try to adjust it to add an insulator as an spacer, the gas line de-coupled from the target.
removing the target for re-installation and clearance addition.
Replace Ta capillary going into the target with the one from previous febiad as it felt sturdy and had better shape for clearance with the HS.
|
887
|
Tuesday, July 27, 2021, 12:57 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD parameter scan - efficiency measurements | Assembly has new gas tube to the target for better fit and clearance to the HS.
Electric checks before closing shows no short between TIS and HS.
Tuesday, July 27, 2021, 12:57: Venting
Tuesday, July 27, 2021, 13:28: Turbos on.
TP1A timed out again! Bypassing BV1A to open it, then reset TP1A and turn it on. Turbo show that is at speed right away.
Tuesday, July 27, 2021, 13:38: IG1 on
Tuesday, July 27, 2021, 15:24: IG1 @ 7.07e-6.
Tuesday, July 27, 2021, 15:28: Waterlines open. No vacuum response.
Tuesday, July 27, 2021, 15:33. IV4. Timed out a couple of times.
Tuesday, July 27, 2021, 15:37: Power/Sources on.
Tuesday, July 27, 2021, 17:57: IG1 @ 2.76e-6 T.
Tuesday, July 27, 2021, 18:04: Auto-ramping TGHT/TBHT to 560/280 A. @ 2A/min.
Wednesday, July 28, 2021, 00:46: Found out that anode got current limited around 9 pm. I wonder if the tube got moved again
Wednesday, July 28, 2021, 00:48: Auto-cooling to 0 A to investigate.
Wednesday, July 28, 2021, 06:44: IV4 closed
Wednesday, July 28, 2021, 06:44: IG1 off. Turbos off.
Wednesday, July 28, 2021, 08:01: Venting.
Once more, the tube was touching the heatshield in the same way as before.
- The cause is likely the spiral line coming from the VCR as in "rest" state in pointing towards the grip handles.
- I was trying to put an insulator piece and I noticed (and recall) how much force I had to put in order to accommodate the spiral line in order to align it with the target capillary.
- This lead me to think that when the targets gets hot and the capillary deforms, this will be pushed towards the HS.
- To fixed it, I modified the spiral to have less torque or at least make it push to the other side (touching the tbht is no problem).
Closing everything and pumping down. |
888
|
Wednesday, July 28, 2021, 08:48 |
Fernando Maldonado | | LP-FEBIAD | | | 41790-10 | 44378-5 | Failed | FEBIAD parameter scan - efficiency measurements | Modified spiral tube from VCR to counteract torque towards the HS. Now points towards TBHT.
Electric checks before closing shows no short between TIS and HS.
Wednesday, July 28, 2021, 08:48: Venting
Wednesday, July 28, 2021, 09:18 Turbos on.
Wednesday, July 28, 2021, 09:26: IG1 on. TP1 didn't timed out.
Wednesday, July 28, 2021, 10:24: IG1 @ 4.13e-6 T. All voltages can be set with no problem.
Wednesday, July 28, 2021, 11:48: IG1 @ 1.98e-6 T. Anode @ 10 V.
Wednesday, July 28, 2021, 11:49: Auto-ramping TGHT/TBHT to 560/280 A @ 4A/min.
Wednesday, July 28, 2021, 14:10: Heaters reached setpoints. No shorts!
Wednesday, July 28, 2021, 14:14: IG1 @ 1.71e-6 T.
Wednesday, July 28, 2021, 14:30: Spark when ramping voltage @ 20 kV.
Wednesday, July 28, 2021, 14:30: IV4 open.
Wednesday, July 28, 2021, 14:32: Bias/ EZL/EE @ 30/13/1.5 kV. Anode @ 0 V.
Wednesday, July 28, 2021, 14:33: FC0 = 1.09e-10 A
Wednesday, July 28, 2021, 14:34: IG1 @ 1.62e-6 T.
Wednesday, July 28, 2021, 14:35: Auto-ramping TGHT to 580 A @ 4A/min.
Wednesday, July 28, 2021, 14:48: IG1 @1 .60e-6 T
Wednesday, July 28, 2021, 14:48: FC0 = 2.35e-10
Ready to start systematic measurements.
Wednesday, July 28, 2021, 15:00: Mass scan with anode = 0 V started.
Couple more mass scans, and parameter scans with a python notebook.
Wednesday, July 28, 2021, 20:37: Auto-ramping TBHT to 285 A @ 2A/min.
Thursday, July 29, 2021, 11:46: Manually tapping to 279 A as this provides a similar power to an older measurement. Even though the anode-cathode gap distance might be different, this is a preliminary measurement to make sure things look relatively similar.
Thursday, July 29, 2021, 21:38: Most of the day I was running parameter scans with similar parameter to an older measurement.
For this I varied TBHT and TGHT and some look closer than other, which indicates how much the sources varies from each other.
I tried running an emittance measurement but it seems the voltage is not been swept. I need to check if the power supply is working.
Thursday, July 29, 2021, 21:38: TBHT to 270 A @ -2A/min. TGHT @ 580 A
Friday, July 30, 2021, 09:57: Things stay fine overnight and only TPS:CBC was found off . The plan for today is the following:
- Check grid integrity
- Flush and refill gas line
- Start systematic measurements at low temperature.
- Mass scan nominal values of coil and anode
- Anode-coil scans
- Mass scan interesting points
- Emittance scan interesting points
Friday, July 30, 2021, 11:43: Grid is fine. Voltages to 0 to open cage.
Friday, July 30, 2021, 11:44: Gas lines flushed and refilled with a pressure of |200| kPa. Similar to older measurements. It seems that yesterday measurements were with |240| kPa.
Friday, July 30, 2021, 11:51: Noticed that TP6 was red. Likely a consequence of a spark. Not sure since when. The vacuum seem ok before.
Friday, July 30, 2021, 11:55: TP1A interlock due to vacuum on CG1A. When opening it the system pressure peak and trip the heaters :/. Waiting for the backing lines to evacuate before heating again.
Friday, July 30, 2021, 14:39: TSG:CG1A&B are not coming down. Bypassing TSG:BV1A increase the pressure reading on IG1, indicating that the signal is real. The question is why there is such buildup in the backing lines.
Digging the archive this seems common but only after march 2021, the pressure does not decrease as good as before. This matches a big water leak. Maybe a new pump is needed as it was the case in August 2020.
Friday, July 30, 2021, 14:49: IG1 off. TP1B off.
Friday, July 30, 2021, 16:05: Backing lines @ 0.025 T. An order of magnitude decrease after swapping RP1 (see elog 889).
Turbos on, IG1 On. Things look to be ok again. TP1A epics readback is 9.92 A at all times but controller reads 6 A upon start (normal) and at full speed reads 0.7 A (normal). To check with control group.
Friday, July 30, 2021, 16:14: IG1 @ 7.02e-7 T. |
889
|
Friday, July 30, 2021, 15:34 |
Carla Babcock | | | | | | | Failed | TSG:RP1 failure | TP1A tripped off on Fernando, seems the backing pressure got too high. Even with PV1 closed the RP1 pump could not get below 200mTorr. Derek from vacuum group came and had a look, and is swapping RP1 out for one of the vacuum group pumps, then will see if they can repair ours. |
960
|
Wednesday, March 29, 2023, 12:22 |
Aaron Schmidt | TiC#5 | LP-FEBIAD | ITE | TM4 | 44692-7 | 45235-20 | Failed | Conditioning TiC#5 | Wednesday, March 29, 2023, 09:15: Roughing.
Wednesday, March 29, 2023, 12:22: TP1B on.
Wednesday, March 29, 2023, 12:40: TP1A on.
Wednesday, March 29, 2023, 13:03: IG1 on.
Thursday, March 30, 2023, 08:23: Vacuum @ 3.42e-07T.
Thursday, March 30, 2023, 08:24: Waterline FS#5 open. Vacuum ok.
Thursday, March 30, 2023, 08:31: Manual Checks:
TGHT / TBHT @ 5 / 5 A ok
BIAS / EE / EZL @ 1 / 0.5 / 1 kV ok.
Thursday, March 30, 2023, 08:32: Anode @ 100 V ok. Coil @ 10 A ok.
Thursday, March 30, 2023, 08:56: Auto-ramping TGHT / TBHT to 350 / 100 A @ 2 A per minute.
Thursday, March 30, 2023, 11:45: Abort heating. TGHT / TBHT @ 233 / 100 A.
Thursday, March 30, 2023, 13:53: Auto-cooling @ 2 A per min
Thursday, April 13, 2023, 11:07: New TMS:RP2 roughing pump installed: Elog 961
Thursday, April 13, 2023, 12:06: Gas lines opened. Ar gas @ 50 kPa
Thursday, April 13, 2023, 13:34: IG1 @ 2.27e-07T / IG6 @ 6.46e-06T. Open IV4
Thursday, April 13, 2023, 13:35: IG1 @ 3.66e-07T / IG6 @ 6.31e-06T7.
Thursday, April 13, 2023, 13:39: IG1 @ 4.03e-07T / IG6 @ 6.24e-06T. Power / Sources on.
Thursday, April 13, 2023, 13:42: Optics still require vacuum below 5.01e-06T on IG6. Wait.
Friday, April 14, 2023, 06:30: Optics still not configuring on TMS:Q2,Q5 or TMS:CB1. Controls group notified.
Friday, April 14, 2023, 06:42: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per minute.
Friday, April 14, 2023, 11:26: Optics fixed / set. Continue ramping to 580 / 270 A @ 2A per minute.
Friday, April 14, 2023, 12:27: Halt & hold ramping. Vacuum @ 5.01e-06T.
Friday, April 14, 2023, 13:54: Ramping continued.
Friday, April 14, 2023, 14:57: Halt & hold ramping. Vacuum @ 5.01e-06T.
Friday, April 14, 2023, 15:38: Ramping continued.
Friday, April 14, 2023, 15:47: TGHT / TBHT @ 580 / 290 A.
BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 100 V. Coil @ 10 A
Friday, April 14, 2023, 15:51: Anode @ 400 V.
Friday, April 14, 2023, 15:52: Anode back to 300 V / 41 mA. . Limited around 350 V. Current limit 50 mA.
Friday, April 14, 2023, 15:55: Adjusted current limit. Anode @ 400 V / 72.039 mA.
Friday, April 14, 2023, 15:58: Adjust Anode current limit further. 300 mA.
Friday, April 14, 2023, 16:06: Anode stable. Reduced current limit to 150 mA. Anode @ 400 A / 91.575 mA
Friday, April 14, 2023, 16:35: Spark* during mass scan. Current limited on the Anode. Reset optics as well.
Friday, April 14, 2023, 16:41: Reduced Anode to 100 V / 30.525 mA. Current limit reduced to 100 mA.
Friday, April 14, 2023, 19:45: Auto-Cooling @ 2 A per min. HV, Coil, & Anode to 0.
Monday, April 17, 2023, 07:35: Coil manually tapped up to 80 A @ 8 A per min.
Monday, April 17, 2023, 08:39: IV4 closed.
Monday, April 17, 2023, 08:44: Power ? Sources off.
Monday, April 17, 2023, 08:45: IG1 off. Turbos pump TP1B & TP1A off.
Monday, April 17, 2023, 13:24: Venting.
Monday, April 17, 2023, 13:26: Odd, the venting is going very slowly. "Aiding" the venting process.
Target oven was inspected post TS. Risks of cracking due to crystallization. |
Attachment 1: TiC#5_conditioning.docx
|
8
|
Tuesday, September 20, 2011, 19:00 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | Done | Finished testing TaC#1 | Tuesday, September 20, 2011:
Did another mass scan today at 5:40. Saved as: plotdump-local-clean.txt Sept 20 11 11-51-20.txt
Started target cool-down. Tomorrow the target would be ready to be removed from the Test Stand.
Wednesday, September 21, 2011:
Turned off the HV & optics.
Target is ready to be removed. Currently, it's under vacuum and the water is still on.
|
17
|
Friday, September 30, 2011, 18:03 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Finished testing SiC#26 at the Test Stand | Today, did a did a mass scan: plotdump-local-clean.txt Sep30 11 12-20-08.txt
Optimized a bit the tune with Friedhelm, then started the Target Cooldown. |
18
|
Monday, October 03, 2011, 10:53 |
Aurelia Laxdal | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target is ready to be removed. | Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on. |
19
|
Monday, October 03, 2011, 13:56 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Venting |
Aurelia Laxdal wrote: |
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.
|
Monday, October 03, 2011, 13:45: Venting. |
20
|
Monday, October 03, 2011, 14:46 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target stored under vacuum |
Anders Mjos wrote: |
Aurelia Laxdal wrote: |
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.
|
Monday, October 03, 2011, 13:45: Venting.
|
Monday, October 03, 2011, 14:45
- Target was visually inspected and found to be ready to go online.
- No burn marks found on the 9-pin connectors.
- Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected
|
21
|
Wednesday, October 12, 2011, 13:14 |
Anders Mjos | SiC#26 | HP-FEBIAD | ITE | TM4 | 38295-9 | 38307-8 | Done | Target removed |
Anders Mjos wrote: |
Anders Mjos wrote: |
Aurelia Laxdal wrote: |
Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.
|
Monday, October 03, 2011, 13:45: Venting.
|
Monday, October 03, 2011, 14:45
- Target was visually inspected and found to be ready to go online.
- No burn marks found on the 9-pin connectors.
- Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected
|
Wednesday, October 12, 2011, 13:15: Venting
Wednesday, October 12, 2011, 14:15: Target brought back to lab for inspection and final check. |
34
|
Friday, February 17, 2012, 10:27 |
Aurelia Laxdal | | | | | | | Done | Started the Archivers | Started both ISACT and SOURCES Archivers. |
57
|
Wednesday, March 07, 2012, 09:27 |
Friedhelm Ames | Nb#6 | | | | | | Done | water cooling started | water cooling line valves opened. No response on vacuum TSG:IG1 3.5e-7 T |
96
|
Thursday, May 17, 2012, 08:36 |
Anders Mjos | SiC#27 | HP-SIS | ITE | TM4 | | | Done | Target removed | Thursday, May 17, 2012, 08:36: Turbo pumps switched off in preparation of target removal.
Thursday, May 17, 2012, 08:51: Purging cooling lines.
Thursday, May 17, 2012, 08:55: Venting.
Thursday, May 17, 2012, 09:21: Target removed |
103
|
Monday, June 04, 2012, 10:51 |
Anders Mjos | Ta#38 | LP-SIS | ITW | TM1 | | | Done | Venting chamber |
Aurelia Laxdal wrote: |
Did the HV conditioning.
Heaters conditioning in progress.
The Hall probe is not working: couldn't pass 35.5 units (readback) or 50.16 units (setpoint) at field -3710G.
Tried to turn ON/OFF magnet PS and to reboot Canbus, but nothing worked. Still waiting for E-Fault 6031 to be resolved.
Started cool-down.
|
Monday, June 04, 2012, 10:51: Turbos switched off
Monday, June 04, 2012, 11:06: Purging water. Venting.
Monday, June 04, 2012, 11:36: Target removed |
105
|
Tuesday, June 26, 2012, 16:06 |
Anders Mjos | | | | | | | Done | Vented |
Anders Mjos wrote: |
HS water lines blanked.
Monday, June 04, 2012, 11:40: Roughing.
Monday, June 04, 2012, 11:58: Starting turbos.
Monday, June 04, 2012, 12:06 : Turbos at speed. Vacuum 1.5 E-5
|
Tuesday, June 26, 2012, 16:06: Turbos off.
Tuesday, June 26, 2012, 17:20: Vented. |
135
|
Friday, July 06, 2012, 15:36 |
Friedhelm Ames | | | | | | | Done | switched everything off | switched everything off to prepare for scheduled power outage on Monday |
|