|
ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
335
|
Wednesday, September 18, 2013, 14:54 |
Anders Mjos | | | | | | | Problems/Solutions | Hall probe calibration | New calibration of the m/q based on
the hall probe after exchanging the controller(MASSOVERQ2).
Based on NiO#2-HP-FEBIAD with Ne supplied |
|
|
338
|
Monday, September 30, 2013, 15:19 |
Anders Mjos | | | | | | | Problems/Solutions | New purging valves installed on Heat Shield water circuit | The Heat Shield circuit can now be separately
purged for water. Use valves on heat shield
circuit to purge the lines for target exchanges |
|
|
339
|
Thursday, October 03, 2013, 08:43 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP2 tripped off - controller replaced. | This morning the turbo was found tripped
off.
The controller was replaced by Edi |
|
|
340
|
Thursday, October 03, 2013, 14:15 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:Q1 and Q6 tripped | |
|
|
341
|
Tuesday, October 15, 2013, 16:17 |
Anders Mjos | | | | | | | Done | TGHT and TB HT test bar test | HS line is looped. Cu-test bars installed
on TGHT and TBHT. Torqued all bolts
to 120 in lbs. |
|
|
342
|
Tuesday, October 22, 2013, 15:20 |
Rick Maharaj | | | | | | | Problems/Solutions | Target Heater Conductor Block Insulators Replaced | The Conductor insulating blocks - ITD053C
and ITD054C - that secure the target heater
and coil conductor blocks were replaced. |
|
|
343
|
Tuesday, November 05, 2013, 15:50 |
Anders Mjos | | | | | | | Problems/Solutions | Backing pressure TSG:CG1A and CG1B elevated | Pressure around 140 mTorr. The pressure
started increasing early November 2nd. Will
continue to monitor. |
|
|
344
|
Tuesday, November 12, 2013, 12:38 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuumed desk, on and around the beam line | |
|
|
345
|
Wednesday, November 20, 2013, 08:57 |
Anders Mjos | | | | | | | Problems/Solutions | Backing pressure TSG:CG1A and CG1B elevated |
|
|
|
346
|
Wednesday, November 27, 2013, 08:27 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS whiteout | Since yesterday around 4pm. Due to attempt
to use the TMS:ER0 device.
IOC rebooted this morning. Archivers |
|
|
347
|
Monday, December 02, 2013, 08:36 |
Anders Mjos | | | | | | | Problems/Solutions | Sources archiver started | |
|
|
348
|
Monday, December 02, 2013, 15:21 |
Anders Mjos | | | | | | | Problems/Solutions | Xantrex 10V 600A installed and in Cathode Negative mode | By Ray Dube. |
|
|
349
|
Wednesday, December 04, 2013, 09:22 |
Anders Mjos | | | | | | | In progress | Testing impedance with the new TBHT P/S | Wednesday, December 04, 2013, 09:21 : Turbos
stopped. Vacuum at 1.2E-7 Torr
Wednesday, December 04, 2013, 12:35: |
|
|
350
|
Thursday, December 12, 2013, 09:01 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum excursion over night | Monday, December 16, 2013, 08:53
Some additional smaller magnitude
excursions have been observed since the fist |
|
|
351
|
Wednesday, December 18, 2013, 12:04 |
Anders Mjos | | | | | 40282-5 | 39230-1 | Done | Heating Test | Wednesday, December 18, 2013, 12:04:
Turbos stopped
Wednesday, December 18, 2013, 13:19: |
|
|
352
|
Friday, December 20, 2013, 15:46 |
Anders Mjos | | | | | | | Problems/Solutions | Water switched off for the holidays | |
|
|
353
|
Thursday, January 02, 2014, 11:53 |
Anders Mjos | | | | | | | Problems/Solutions | The computer will not boot Windows | The computer has been brought over to PC
support for diagnostics.
Hard Drive was found to be corrupted. |
|
|
354
|
Tuesday, January 14, 2014, 08:58 |
Anders Mjos | | | | | 40282-5 | 39230-1 | Done | Heating Test | Tuesday, January 14, 2014, 08:57: Stopping
turbos. Vacuum at 1.2E-7 T
Tuesday, January 14, 2014, 13:32: |
|
|
355
|
Thursday, January 16, 2014, 15:00 |
Anders Mjos | | | | | | | Problems/Solutions | Flow and temperature meter | Flow and temperature meter previously installed
on cooling circuits. See attachment for details.
Typical values at 95 psi in and 10 |
|
|
356
|
Friday, January 24, 2014, 10:49 |
Anders Mjos | | | | | | | Problems/Solutions | Venting the optics section to investigate Emittance Rig installation | Friday, January 24, 2014, 10:49 : Stopped
turbos. Vacuum at 2.5E-7 T
Friday, January 24, 2014, 12:52: |
|