ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
347
|
Monday, December 02, 2013, 08:36 |
Anders Mjos | | | | | | | Problems/Solutions | Sources archiver started | |
|
348
|
Monday, December 02, 2013, 15:21 |
Anders Mjos | | | | | | | Problems/Solutions | Xantrex 10V 600A installed and in Cathode Negative mode | By Ray Dube. |
|
349
|
Wednesday, December 04, 2013, 09:22 |
Anders Mjos | | | | | | | In progress | Testing impedance with the new TBHT P/S | Wednesday, December 04, 2013, 09:21 : Turbos
stopped. Vacuum at 1.2E-7 Torr
Wednesday, December 04, 2013, 12:35: |
|
350
|
Thursday, December 12, 2013, 09:01 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum excursion over night | Monday, December 16, 2013, 08:53
Some additional smaller magnitude
excursions have been observed since the fist |
|
352
|
Friday, December 20, 2013, 15:46 |
Anders Mjos | | | | | | | Problems/Solutions | Water switched off for the holidays | |
|
353
|
Thursday, January 02, 2014, 11:53 |
Anders Mjos | | | | | | | Problems/Solutions | The computer will not boot Windows | The computer has been brought over to PC
support for diagnostics.
Hard Drive was found to be corrupted. |
|
355
|
Thursday, January 16, 2014, 15:00 |
Anders Mjos | | | | | | | Problems/Solutions | Flow and temperature meter | Flow and temperature meter previously installed
on cooling circuits. See attachment for details.
Typical values at 95 psi in and 10 |
|
356
|
Friday, January 24, 2014, 10:49 |
Anders Mjos | | | | | | | Problems/Solutions | Venting the optics section to investigate Emittance Rig installation | Friday, January 24, 2014, 10:49 : Stopped
turbos. Vacuum at 2.5E-7 T
Friday, January 24, 2014, 12:52: |
|
357
|
Wednesday, January 29, 2014, 14:42 |
Anders Mjos | | | | | | | Problems/Solutions | Valved off water to TSG and TMS:MB1 | CuLCW will be shut off tomorrow. Valved
off water supply to MB1 and TSG to minimize
air into the system. Turbos are off. |
|
358
|
Thursday, January 30, 2014, 15:38 |
Anders Mjos | | | | | | | Problems/Solutions | Starting turbos after CuLCW shut off |
|
|
359
|
Wednesday, February 05, 2014, 11:27 |
Anders Mjos | | | | | | | Problems/Solutions | Emittance Rig installation | Wednesday, February 05, 2014, 11:27 : Stopped
turbos
2x spacers ITD0468 1/8" |
|
360
|
Wednesday, February 12, 2014, 09:01 |
Anders Mjos | | | | | | | In progress | Testing Cleaning sample | Wednesday, February 12, 2014, 08:55: Stopped
turbos
Wednesday, February 12, 2014, 11:28: |
|
361
|
Friday, March 07, 2014, 11:38 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:TP2 stopped over night | See fault report 7240
Tuesday, March 11, 2014,
09:04: Stopping TMS:TP6. Vacuum at 9.7E-6 |
|
362
|
Tuesday, March 11, 2014, 09:03 |
Anders Mjos | | | | | | | Problems/Solutions | Leak on water line for Heat Shield | Tuesday, March 11, 2014, 09:03: Venting
to investigate |
|
363
|
Wednesday, March 12, 2014, 10:20 |
Rick Maharaj | | | | | | | Done | replace heatshield waterline loop | A new Heatshield waterline loop was manufactured
and installed to replace the old one which
had a leak. |
|
365
|
Friday, March 21, 2014, 13:55 |
Anders Mjos | | | | | | | In progress | Pumping down empty chamber | Roughing
Friday, March 21, 2014, 13:59: Starting
turbos |
|
366
|
Friday, March 21, 2014, 14:12 |
Anders Mjos | | | | | | | Problems/Solutions | Elevated backing pressure on ISAC Test Stand TMS:RP2 | The performance of the roughing pump has
gradually gone down. Notably after the system
has been vented. See attached screenshot |
|
367
|
Friday, March 28, 2014, 10:39 |
Anders Mjos | TiC#4 | HP-SIS | ITE | TM3 | | | In progress | Conditioning TiC#4 | NOTE:
TBHT Power Supply is 600A. EPICS thinks |
|
368
|
Tuesday, April 01, 2014, 11:09 |
Aurelia Laxdal | TiC#4 | HP-SIS | ITE | TM3 | | | In progress | HV and Heaters Conditioning | Started March 31, 2014:
- did the HV conditioning up to 30kV.
April 1, 2014: |
|
369
|
Thursday, April 03, 2014, 16:46 |
Aurelia Laxdal | TiC#4 | HP-SIS | ITE | TM3 | | | Done | HV and Heaters Conditioning | HV and Heaters Conditioning had finished.
The target was cooled down and it's ready
for the on-line installation. |
|