Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 30 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  347   Monday, December 02, 2013, 08:36 Anders Mjos      Problems/SolutionsSources archiver started    
  348   Monday, December 02, 2013, 15:21 Anders Mjos      Problems/SolutionsXantrex 10V 600A installed and in Cathode Negative modeBy Ray Dube.    
  349   Wednesday, December 04, 2013, 09:22 Anders Mjos      In progressTesting impedance with the new TBHT P/SWednesday, December 04, 2013, 09:21 : Turbos
stopped. Vacuum at  1.2E-7 Torr
Wednesday, December 04, 2013, 12:35:
  
  350   Thursday, December 12, 2013, 09:01 Anders Mjos      Problems/SolutionsVacuum excursion over nightMonday, December 16, 2013, 08:53
Some additional smaller magnitude
excursions have been observed since the fist
 VacuumExcursion-2013-12-12.pngVacuumExcursion-2013-12-16.png 
  352   Friday, December 20, 2013, 15:46 Anders Mjos      Problems/SolutionsWater switched off for the holidays    
  353   Thursday, January 02, 2014, 11:53 Anders Mjos      Problems/SolutionsThe computer will not boot WindowsThe computer has been brought over to PC
support for diagnostics. 
Hard Drive was found to be corrupted.
  
  355   Thursday, January 16, 2014, 15:00 Anders Mjos      Problems/SolutionsFlow and temperature meterFlow and temperature meter previously installed
on cooling circuits. See attachment for details.
Typical values at 95 psi in and 10
 Vortex_Flow_Meter_Config.docx 
  356   Friday, January 24, 2014, 10:49 Anders Mjos      Problems/SolutionsVenting the optics section to investigate Emittance Rig installationFriday, January 24, 2014, 10:49 : Stopped
turbos. Vacuum at 2.5E-7 T 
Friday, January 24, 2014, 12:52:
  
  357   Wednesday, January 29, 2014, 14:42 Anders Mjos      Problems/SolutionsValved off water to TSG and TMS:MB1CuLCW will be shut off tomorrow. Valved
off water supply to MB1 and TSG to minimize
air into the system. Turbos are off.
  
  358   Thursday, January 30, 2014, 15:38 Anders Mjos      Problems/SolutionsStarting turbos after CuLCW shut off

    

       
            
  
  359   Wednesday, February 05, 2014, 11:27 Anders Mjos      Problems/SolutionsEmittance Rig installationWednesday, February 05, 2014, 11:27 : Stopped
turbos

    2x spacers ITD0468 1/8"
 Spacers_Installed.jpgEmittance_Rig_Inside.jpgEmittance_Rig_Outside.jpg 
  360   Wednesday, February 12, 2014, 09:01 Anders Mjos      In progressTesting Cleaning sampleWednesday, February 12, 2014, 08:55: Stopped
turbos 
Wednesday, February 12, 2014, 11:28:
  
  361   Friday, March 07, 2014, 11:38 Anders Mjos      Problems/SolutionsTMS:TP2 stopped over nightSee fault report 7240

Tuesday, March 11, 2014,
09:04: Stopping TMS:TP6. Vacuum at 9.7E-6
  
  362   Tuesday, March 11, 2014, 09:03 Anders Mjos      Problems/SolutionsLeak on water line for Heat ShieldTuesday, March 11, 2014, 09:03: Venting
to investigate
  
  363   Wednesday, March 12, 2014, 10:20 Rick Maharaj      Donereplace heatshield waterline loopA new Heatshield waterline loop was manufactured
and installed to replace the old one which
had a leak.
  
  365   Friday, March 21, 2014, 13:55 Anders Mjos      In progressPumping down empty chamberRoughing
Friday, March 21, 2014, 13:59: Starting
turbos
  
  366   Friday, March 21, 2014, 14:12 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2The performance of the roughing pump has
gradually gone down. Notably after the system
has been vented. See attached screenshot
 TMSCG2_2014-03-21.png 
  367   Friday, March 28, 2014, 10:39 Anders MjosTiC#4HP-SISITETM3  In progressConditioning TiC#4NOTE:

TBHT Power Supply is 600A. EPICS thinks
  
  368   Tuesday, April 01, 2014, 11:09 Aurelia LaxdalTiC#4HP-SISITETM3  In progressHV and Heaters Conditioning Started March 31, 2014: 
- did the HV conditioning up to 30kV.
April 1, 2014: 
 ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx 
  369   Thursday, April 03, 2014, 16:46 Aurelia LaxdalTiC#4HP-SISITETM3  DoneHV and Heaters ConditioningHV and Heaters Conditioning had finished.
The target was cooled down and it's ready
for the on-line installation.
 ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx 
ELOG V2.9.2-2455