Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 30 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Moduledown Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  484   Wednesday, January 06, 2016, 09:28 Anders Mjos      Problems/SolutionsWater leak fixed on flow sensor for HS circuit The Swagelok fitting on the return
side of the flow sensor for the HS circuit
was tightened to stop the leak. See e-fault 
  
  485   Monday, January 11, 2016, 09:02 Anders Mjos       VentingMonday, January 11, 2016, 09:02: Turbos
stopped.
Monday, January 11, 2016, 12:58:
  
  486   Monday, January 18, 2016, 08:41 Anders Mjos      Problems/SolutionsTSG:RP1 nor performingThe pump failed to pump down below 2 Torr.
on Friday 15th E-fault 8680 submitted. Vacuum
group will replace the pump today
  
  487   Monday, January 18, 2016, 15:38 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
 2016-01-18_Pumping_on_Ta46Clone_(leak_at_Lid-Base_HS).png 
  488   Tuesday, January 19, 2016, 18:34 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  489   Wednesday, January 20, 2016, 14:26 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  490   Wednesday, January 20, 2016, 19:11 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  491   Thursday, January 21, 2016, 13:04 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  492   Friday, January 22, 2016, 11:07 Anders Mjos      In progressVenting Friday, January 22, 2016, 11:07:
Stopped turbos
  
  493   Friday, January 22, 2016, 13:35 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  494   Friday, January 22, 2016, 15:34 Anders MjosSiCLP-SIS  41077-3 In progressEE coating testFriday, January 22, 2016, 15:30: Turbos
started
Friday, January 22, 2016, 16:14:
 2016-02-14_EE_V_limit.png 
  495   Tuesday, February 23, 2016, 10:43 Anders MjosSiCLP-SIS  41077-3  EE coating test - no Plasma ElectrodeCleaned up EE and around target tube. Removed
PE
Tuesday, February 23, 2016, 10:40:
  
  496   Wednesday, March 02, 2016, 12:08 Anders Mjos      Problems/SolutionsTGHT insulator broken The insulator for the TGHT terminals
cracked during an attempt to remove a seized
bolt.The right TGHT block was removed with
  
  498   Friday, March 11, 2016, 15:46 Anders Mjos      In progressTesting end cap leak tightnessTwo Ta-tubes sealed with 2 end caps each
placed in the vacuum chamber. 
Friday, March 11, 2016, 15:03: Rouging
  
  500   Tuesday, March 29, 2016, 14:44 Aaron Schmidt       Pumping down empty chamber.Tuesday, March 29, 2016, 14:43: Roughing.

 Wednesday, March 30,
2016, 14:33: Venting   -AM
  
  502   Monday, April 04, 2016, 11:33 Aaron Schmidt LP-SIS  41790-239956-8In progressTesting restraint insulator prototypeMonday, April 04, 2016, 11:31: Begin roughing.
(No plasma electrode)
Monday, April 04, 2016, 12:47: Started
 Anode_Voltage_VS_Current.xlsxTS-2016-04-05_Restraint_Test.rgaTS-2016-04-13_Restraint_Test.rgaRP#1.docx 
  503   Wednesday, April 13, 2016, 13:03 Aaron Schmidt LP-SIS  41790-239956-8 Testing restraint insulator prototype (2)Wednesday, April 13, 2016, 13:03: Begin
roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34:
 Anode_Voltage_and_EE_(neg_bias).xlsxAnode_Voltage_and_EE_(pos_bias).xlsxRP#1_(2).docx 
  504   Friday, April 15, 2016, 16:07 Anders Mjos      Problems/SolutionsANODE polarity switched to positiveto test the effect of extraction when biasing
of the target.
  
  505   Wednesday, April 20, 2016, 08:27 Anders Mjos      Problems/SolutionsANODE polarity switched to negative

    

       
            
  
  507   Monday, May 02, 2016, 16:03 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator TestMonday, May 02, 2016, 16:01: Roughing.
Monday, May 02, 2016, 16:35: Turbos
started -AM
 TS-2016-05-02_EE_insulator_test.rga 
ELOG V2.9.2-2455