  321   Tuesday, July 16, 2013, 16:01 Anders Mjos      Problems/SolutionsFEBIAD coil connector insulator fracture

The right side of the insulator cracked/fractured either as the bolt was tightened or loosened. 

  322   Wednesday, July 17, 2013, 12:55 Anders Mjos      Problems/SolutionsControls are removing dust/cleaning their devices

Thursday, July 18, 2013, 08:41: Restarting archivers

  324   Monday, July 22, 2013, 14:08 Anders Mjos      Problems/Solutions20V 60A COIL PS installed for FEBIAD Coil Test

By Ray. Note that controls have not been updated yet.

  326   Tuesday, August 20, 2013, 08:27 Anders Mjos      Problems/SolutionsTP1B noise - TP1B replacement

TP1B high frequency noise is coming and going. Power is 22W , current 1.1A (other pumps are 11W and 14W, 0.7A)

Edi from vacuum group notified. He will replace the pump today.

Tuesday, August 20, 2013, 08:40: Turbos off. Vacuum 1.4E-7 T

Tuesday, August 20, 2013, 10:01: Started venting.

Turbo has been replaced by Edi.

Tuesday, August 20, 2013, 16:28: Roughing

Tuesday, August 20, 2013, 16:51: Turbos started.

TP1A timed out. Could not open BV1A and restart due to too high backing pressure at CG1A


Wednesday, August 21, 2013, 08:17: Turbos started. Vacuum 0.043 T

Wednesday, August 21, 2013, 08:25: Turbos at speed. TP1B: 1.2A 28W 30 deg C.

Wednesday, August 21, 2013, 08:27: Vacuum at 5.6 E-6 T

 

  327   Friday, August 23, 2013, 11:16 Anders Mjos      Problems/SolutionsPossible leak between BV1A, BV1B and PV1

CG1A is climbing from 0.016 to 0.130 in 30 seconds when isolated.

The leak was confirmed to be between BV1A and PV1 in the bellows. The bellows has been replaced and backing pressure is back to normal values.

  328   Monday, August 26, 2013, 13:49 Anders Mjos      Problems/SolutionsTP1A time out/fault sometime this weekend

Monday, August 26, 2013, 14:07: The turbo could be restarted, but it does not sound happy (Dimo was consulted earlier today). The pump is drawing around 4 A. The current draw is fluctuating between 3.5 and 4.2 A at the same time as backing pressure is spiking from 0.015 to 0.045 T

Monday, August 26, 2013, 15:32:: The turbo failed again. Dimo had a quick look. It will have to be replaced. See e-fault: 6953


Wednesday, August 28, 2013, 08:48: Stopping TP1B. Vacuum at 4.8 E-7 T

Wednesday, August 28, 2013, 10:59: Venting

Anthony has replaced the pump. There was no screen on the existing pump. A screen has been installed in front of the turbo.

Wednesday, August 28, 2013, 14:03: started roughing

Wednesday, August 28, 2013, 14:31: Starting turbos

Wednesday, August 28, 2013, 14:41Turbos at speed

Wednesday, August 28, 2013, 14:43: Vacuum at 2.0 E-5 T

  329   Wednesday, August 28, 2013, 11:28 Anders Mjos      Problems/SolutionsHall probe controller for MB1 removed

Jens Lassen provided a new controller for the Hall prove. With the help from Graham from controls it was reconfigured and is operational again. The magnet must likely be calibrated again.

  331   Monday, September 09, 2013, 09:12 Anders Mjos      Problems/SolutionsCoil power supply back

Ray D. installed the "standard" 6V 200A FEBIAD COIL P/S on Friday morning.It has not yet been tested as water supply was on.

  332   Monday, September 09, 2013, 09:14 Anders Mjos      Problems/SolutionsGround Electrode cleaned

Monday, September 16, 2013, 17:04: Cleaned GE. Copper shavings were removed from below the guide pins for the Heat Shield. The shavings were sitting on top of the aluminum support.

  334   Tuesday, September 17, 2013, 10:06 Anders Mjos      Problems/SolutionsTGHT insulator cracked

The coil insulator has been observed to have cracked earlier. 

  335   Wednesday, September 18, 2013, 14:54 Anders Mjos      Problems/SolutionsHall probe calibration

New calibration of the m/q based on the hall probe after exchanging the controller(MASSOVERQ2). Based on NiO#2-HP-FEBIAD with Ne supplied and ANODE biased to 200V, 30kV Bias.

CONST11 = -16.3929
CONST22 = 0.12481

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2013-09-18-09%20NiO%232

Data and results from Gnuplot

"2013-09-18 NiOcalibration.txt"
6.02 -1192 6Li
7.02 -1288 7Li
19.99 -2177 20Ne
21.99 -2284 22Ne
38.96 -3043 40K
40.96 -3118 41K
180.9 -6577 Ta
196.9 -6864 TaO

f(x)=((x+a)**2)*b/30000;
a=35.221;
b=0.129991;
fit f(x) "2013-09-18 NiOcalibration.txt" using 2:1 via a,b;

Final set of parameters Asymptotic Standard Error
======================= ==========================

a = -16.3929 +/- 2.015 (12.29%)
b = 0.12481 +/- 8.448e-005 (0.06769%)


correlation matrix of the fit parameters:

a b
a 1.000
b 0.952 1.000  

  338   Monday, September 30, 2013, 15:19 Anders Mjos      Problems/SolutionsNew purging valves installed on Heat Shield water circuit

The Heat Shield circuit can now be separately purged for water. Use valves on heat shield circuit to purge the lines for target exchanges from now on.

All paddle wheels have been rotated to allow trapped air to escape the system more easily.

  339   Thursday, October 03, 2013, 08:43 Anders Mjos      Problems/SolutionsTMS:TP2 tripped off - controller replaced.

This morning the turbo was found tripped off. 

The controller was replaced by Edi on Friday.


Monday, October 07, 2013, 08:28: Starting Turbo

Monday, October 07, 2013, 08:29: Turbo at speed. Vacuum at 4.4E-7 T

  340   Thursday, October 03, 2013, 14:15 Anders Mjos      Problems/SolutionsTMS:Q1 and Q6 tripped
  341   Tuesday, October 15, 2013, 16:17 Anders Mjos      DoneTGHT and TB HT test bar test

HS line is looped. Cu-test bars installed on TGHT and TBHT. Torqued all bolts  to 120 in lbs.

Tuesday, October 15, 2013, 16:17: Roughing

Tuesday, October 15, 2013, 16:39: Turbos started.

Tuesday, October 15, 2013, 16:48: Turbos at speed

Tuesday, October 15, 2013, 16:49: Vacuum at 3.0 E-5 T


Wednesday, October 16, 2013, 08:38: Opened water on HS. Vacuum stable at 5.5E-7 T.

Wednesday, October 16, 2013, 10:12: TBHT to 300A (0.623V) TGHT to 580A (1.443 V)

Wednesday, October 16, 2013, 10:13: Ramping down at 6A/min


Thursday, October 17, 2013, 08:33: Turbos stopped. Vacuum at 2.6E-7 T.

Thursday, October 17, 2013, 10:24: Venting

Turned TGHT Cu-bar 180 deg. Loosened and re-fastened all bolts to 120 in lbs.

Thursday, October 17, 2013, 10:48: Roughing.

Thursday, October 17, 2013, 11:07: Turbos started.

Thursday, October 17, 2013, 11:16: Turbos at speed.

Thursday, October 17, 2013, 11:17: Vacuum at 1.2E-5 T

 TGHT and TBHT were brought up to 580A and 300A.


Flow meters connected.

TGHT
T  27.8
Q 5.5

Monday, October 21, 2013, 13:34: Heating TGHT to 580A (1.411 V)

Monday, October 21, 2013, 13:37
TGHT
T  28.9
Q 5.4

Monday, October 21, 2013, 13:40
TGHT
T  29.1
Q 5.5

Monday, October 21, 2013, 13:45
TGHT
T  29.4
Q 5.4

TGHT RDCUR/VOL 581.5A / 1.421 V

Monday, October 21, 2013, 13:47
TGHT RDCUR/VOL 270.6 A / 0.674V
T  28.4
Q 5.4

Monday, October 21, 2013, 13:52
TGHT RDCUR/VOL 270.6 A / 0.674V
T  28.3
Q 5.5

Monday, October 21, 2013, 13:52: TGHT off.

TGHT
T  27.9
Q 5.5


Tuesday, October 22, 2013, 08:09: Stopped turbos. Vacuum at 1.4E-7 T

Tuesday, October 22, 2013, 12:29: Venting

 

Results in DocuShare collection

  342   Tuesday, October 22, 2013, 15:20 Rick Maharaj      Problems/SolutionsTarget Heater Conductor Block Insulators Replaced

The Conductor insulating blocks - ITD053C and ITD054C - that secure the target heater and coil conductor blocks were replaced. The existing ones were cracked and fell apart upon removal.

  343   Tuesday, November 05, 2013, 15:50 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A and CG1B elevated

Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.

Tuesday, November 12, 2013, 09:51 UPDATE
 Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week.

  344   Tuesday, November 12, 2013, 12:38 Anders Mjos      Problems/SolutionsVacuumed desk, on and around the beam line
  345   Wednesday, November 20, 2013, 08:57 Anders Mjos      Problems/SolutionsBacking pressure TSG:CG1A and CG1B elevated

 

Anders Mjos wrote:

Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.

Tuesday, November 12, 2013, 09:51 UPDATE
 Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week.

 

 The backing pump (TSG:RP1) was replaced yesterday by Anthony Ip. Backing pressure is down to 1 mTorr on TSG:CG1A

  346   Wednesday, November 27, 2013, 08:27 Anders Mjos      Problems/SolutionsEPICS whiteout

Since yesterday around 4pm. Due to attempt to use the TMS:ER0 device.

IOC rebooted this morning. Archivers restarted.