  432   Tuesday, March 24, 2015, 09:50 Anders Mjos      In progressEmpty chamber

Roughed down on Friday 20th

Tuesday, March 24, 2015, 09:49: Turbos started

Tuesday, March 24, 2015, 09:59: Turbos at speed. Vacuum at 2.8E-6 T


EPICS could not communicate with devices. Contacted controls (Dave M)

Thursday, April 02, 2015, 14:45: Stopped turbos.

Thursday, April 02, 2015, 15:10: Started venting through turbo pump (to 16 T)

Thursday, April 02, 2015, 15:12: Venting through VV1

  434   Thursday, April 09, 2015, 11:21 Anders Mjos      Problems/SolutionsNo RGA communcations

RGA stopped working. Likely after a spark yesterday.

  435   Monday, April 13, 2015, 13:07 Anders Mjos      Problems/SolutionsISAC Test Stand Optical elements power supply drop out

 See e-fault 8027 

Monday, April 13, 2015
Kevin and Graham are working on it

 

 

 

 

  436   Wednesday, April 22, 2015, 13:17 Anders Mjos       Source Tray Removed

 by Mico, Dan and Anders

  437   Friday, April 24, 2015, 12:25 Anders Mjos      Problems/SolutionsBacking line pressure high

TSG:RP1 backing line pressure is >200 mT. An e-fault has been submitted to have the roughing pump replaced.

Friday, April 24, 2015, 13:13: Pump replaced by vacuum group.

  439   Monday, May 04, 2015, 09:51 Anders Mjos      Problems/SolutionsFEBIAD Coil power supply replaced

 Power supply did not work after high voltage conditioning. On Friday May 1st John Chow replaced the power supply with a 12 V 100 A power supply temporary while the other supply is being repaired. EPICS controls have not been adjusted.

  440   Friday, May 08, 2015, 09:07 Anders Mjos      Problems/SolutionsEPICS lost contact with the PLC

Everything shut down, while EPICS showed everyhing to be on.

Controls group (Dave Morris) has reestablished contact. System is operations.

TSG section vented for Source Tray work

Friday, May 08, 2015, 09:13: TMS turbos at speed. Vacuum at 1.2E-5 T

  442   Tuesday, May 19, 2015, 19:10 Anders Mjos      Problems/SolutionsEPICS white out

 Likely caused by the PLC. e-fault  8139


Wednesday, May 20, 2015

Dave Morris re-established contact with controls. (PLC IOC was down).

  443   Thursday, May 21, 2015, 16:40 Anders Mjos      Problems/SolutionsReconfigured service cap coil connections

 The service cap has been reconfigured (colling and electric) to be compatible with the TM2 Source tray. Coil- is E & F , Coil+ is G & H.

Attachment 1: TestStandSourceTray.jpg
TestStandSourceTray.jpg
Attachment 2: TM2SourceTray.jpg
TM2SourceTray.jpg
  445   Thursday, May 21, 2015, 17:38 Anders Mjos      Problems/SolutionsInstalled equipment for measuring outgassing rate

 A gauge and a valve was installed on the roughing line to the large turbo pump

  448   Wednesday, June 03, 2015, 09:35 Anders Mjos      Problems/SolutionsPLC upgrade

Wednesday, June 03, 2015, 09:35: TP6 and TP2 off

Wednesday, June 03, 2015, 10:15: Upgrade in progress.

  449   Monday, June 15, 2015, 14:07 Anders Mjos      Problems/SolutionsTest Stand Source Tray installed

Monday, June 15, 2015

Remaining items to do

  • ANODE wire not yet attached
  • FEBIAD COILS not yet reconfigured

Tuesday, June 16, 2015:

Coils reconfigured. See attached photo.

 

Attachment 1: Coils_configuration.jpg
Coils_configuration.jpg
  451   Monday, June 22, 2015, 15:49 Anders Mjos      In progressInstalled new 9-pin feed through

No wires connected yet.

Monday, June 22, 2015, 15:48: Roughing


Tuesday, June 23, 2015, 09:05: Roughing vacuum does not go below 0.9 T. Venting to investigate.

Tuesday, June 23, 2015, 10:16: Turbos started at 0.9 T

Tuesday, June 23, 2015, 10:276: Turbos at speed. Vacuum at 7.5E-4 T

Tuesday, June 23, 2015, 10:32: Stopped turbos

Tuesday, June 23, 2015, 11:01: Venting

Tuesday, June 23, 2015, 11:22: Roughing

Tuesday, June 23, 2015, 13:37: Venting

Tuesday, June 23, 2015, 16:48: Leak found on the newly installed f/t.


Wednesday, June 24, 2015, 09:29: Venting

Replaced f/t with a blank off.Installed TM2 FEBIAD test target

Wednesday, June 24, 2015, 10:31: Roughing

Wednesday, June 24, 2015, 11:07: Started turbos.

Wednesday, June 24, 2015, 11:17: Turbos at speed. Vacuum at 3.3E-5 T


Thursday, July 09, 2015

Installed the fixed f/t.

Attachment 1: 9-pin_feed_through.jpg
9-pin_feed_through.jpg
  453   Monday, June 29, 2015, 16:51 Friedhelm Ames      Problems/SolutionsTSG:BV1B closed

found TSG:TP1B tripped off. Closed TSG:BV1B as pressure at TSG:iG1 was rising. Pressure is coming down again.


Tuesday, June 30, 2015 by AM

Found the control cable not completely inserted. Inserted cable, which tripped TP1A. Started both turbo pumps again.

Tuesday, June 30, 2015, 09:54: Both turbos at speed.

Tuesday, June 30, 2015, 09:56: Stopped turobs. BV1B does not close when TP1B is switched off. Requested Dave Morris to look into it. All remaining BVs close when TP is swithced off in TMS and TSG sections.

  455   Monday, July 06, 2015, 09:29 Anders Mjos      Problems/SolutionsReplaced out gassing gauge on the backing line
  456   Monday, July 06, 2015, 14:26 Anders Mjos       Pumping down empty chamber

Monday, July 06, 2015, 14:26: Roughing


Wednesday, July 08, 2015, 09:26: Venting


Thursday, July 09, 2015, 11:42: Roughing

Thursday, July 09, 2015, 13:16: Turbos started.


Friday, July 10, 2015, 08:54 : Stopped turbos

Friday, July 10, 2015, 11:29 : Venting

Friday, July 10, 2015, 16:56: Roughing

  457   Monday, July 13, 2015, 17:19 Anders Mjos LP-SIS    In progressSIS Cup insulator clamping test

Monday, July 13, 2015, 17:09: Roughing

Monday, July 13, 2015, 17:51: Turbos started

Monday, July 13, 2015, 18:01: Turbos at speed. Vacuum at 3.7E-5 T


Tuesday, July 14, 2015, 09:05: Opened HS water. No response on IG or RGA.

Tuesday, July 14, 2015, 09:12: Started auto-ramping to 300 / 150 A

Tuesday, July 14, 2015, 14:46: TGHT at 400 A, TBHT at 150 A. HS 27 C, SIS cup 76 C


Wednesday, July 15, 2015, 13:57: TGHT 580, TBHT 200. HS 20, SIS cup 120 C

Wednesday, July 15, 2015, 15:08: TBHT 220 A. HS 20, SIS Cup 133 C

Wednesday, July 15, 2015, 15:08: Started ramping down heaters.


Thursday, July 16, 2015, 08:52: Turbos stopped.

Thursday, July 16, 2015, 10:24: Venting

Reconfigured target to no clamping (standard SIS Cup configuration)

Thursday, July 16, 2015, 11:41: Roughing

Thursday, July 16, 2015, 13:40: Turbos started.


Friday, July 17, 2015, 08:47: Opened S water. No response on IG or RGA.

Friday, July 17, 2015, 08:51 : Started auto-ramping to 580 / 220 A

Friday, July 17, 2015, 13:30: TGHT at 560 A, TBHT at 220 A. HS 25 C, SIS cup 514 C

Friday, July 17, 2015, 14:10: TGHT at 580 A, TBHT at 220 A. HS 23 C, SIS cup 530 C

Friday, July 17, 2015, 15:56: Starting cool-down


 Monday, August 10, 2015, 08:43: Turbos stopped. Vacuum at 2.9E-7 T

Monday, August 10, 2015, 14:42: Venting

  458   Tuesday, August 04, 2015, 13:37 Anders Mjos      Problems/SolutionsEquipment for outgassing measurements removed
  459   Monday, August 10, 2015, 18:01 Anders Mjos LP-SIS    In progressTesting new center block target

Installed thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint
T3: Centre block top, outside

Monday, August 10, 2015, 18:01: Turbos started

Monday, August 10, 2015, 18:11 : Turbos at speed. Vacuum at 1.5E-5 T


Tuesday, August 11, 2015, 09:04: Opened water for HS. Vacuum stable at 5.2E-7 T. No response on RGA

Tuesday, August 11, 2015, 09:09 : Started auto-ramping to 250/100 A at 2/1 A/min.

Tuesday, August 11, 2015, 11:45: T1 857 C, T3 206 C (T2 no signal)

Tuesday, August 11, 2015, 11:45: Continue auto-ramping to 580/200 A.

Tuesday, August 11, 2015, 15:30: T1 1467, T3 816 at 580/230 A

Tuesday, August 11, 2015, 15:40: Starting cool down.


Wednesday, August 12, 2015, 09:40: Stopped turbos.

Wednesday, August 12, 2015, 13:20: Venting

The Centre block t/c was touching the TBHT terminal. Bent the t/c away from the TBHT terminal

Wednesday, August 12, 2015, 14:05: roughing

Wednesday, August 12, 2015, 14:48: Started turbos


Thursday, August 13, 2015, 09:06: Opened water for HS. Vacuum stable at 3.8E-7 T. No response on RGA

Thursday, August 13, 2015, 09:06: Started auto-ramping to 250/100 A at 2/1 A/min.

Thursday, August 13, 2015, 10:09: Aborting auto-ramping. Starting cool down. T/C shorts centre block to HS and may affect TGHT/TBHT current.

Thursday, August 13, 2015, 11:17: Turbos stopped.

  460   Saturday, August 29, 2015, 14:33 Anders Mjos      Problems/SolutionsRestarted IOC after power outage

 Saturday, August 29, 2015, 15:50: Turbos started