  269   Tuesday, January 15, 2013, 15:12 Sebastian RaederRFQ empty      Start coolingStart cooling of Target RFQ empty   
  270   Tuesday, January 15, 2013, 16:10 Anders MjosRFQ empty      Turbos off

    

       
            
  
  271   Wednesday, January 16, 2013, 01:06 Sebastian RaederRFQ empty      Target installed - pumping downRFQ empty target installed
Wednesday, January 16, 2013, 01:05:
roughing started
  
  272   Thursday, January 17, 2013, 08:16 Sebastian RaederRFQ empty     In progressheatingThursday, January 17, 2013, 08:16: started
heating of the target, vacuum at 2.6E-7T
 Thursday, January 17, 2013,
  
  273   Friday, January 18, 2013, 11:28 Sebastian RaederRFQ empty      stop turbosFriday, January 18, 2013, 11:28: turbos
stopped
  
  274   Friday, January 18, 2013, 15:34 Anders Mjosempty      Pumping down empty chamberStarted roughing
Friday, January 18, 2013, 15:25:
Started turbos
  
  275   Friday, January 18, 2013, 15:57 Anders Mjos      Problems/SolutionsConductor bolts to be replacedAfter the last test at the test stand,
one of the conductor bolts (ITD0058) is damaged.
To prevent damage to the thread inserts,
 Model.jpgdamaged_bolt.JPG 
  276   Friday, January 18, 2013, 16:17 Anders MjosRFQ empty     In progressheating 

    
 Test_Stand_cooling_temp_data_2013-01-16.pdfTest_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG 
  277   Monday, January 28, 2013, 12:56 Anders MjosEmpty      Venting For conductor bolt work
Monday, January 28, 2013, 12:56:
Turbos off
  
  278   Monday, January 28, 2013, 14:41 Anders MjosEmpty      Pumping downMonday, January 28, 2013, 14:41: Roughing
Monday, January 28, 2013, 15:35:
Starting turbos
  
  279   Tuesday, February 19, 2013, 08:28 Anders Mjos      Problems/SolutionsOpened all backing valves after scheduled site wide air outage    
  280   Tuesday, February 26, 2013, 08:32 Anders Mjos      Problems/SolutionsTMSTP2 timeout / faultTuesday, February 26, 2013, 08:24: Started
turbo
Tuesday, February 26, 2013, 08:24:
 Vacuum_2013-02-26.PNG 
  281   Monday, March 04, 2013, 09:11 Anders Mjos      Problems/SolutionsRestarted turobos after planned power outageStarted archivers
Started turbos
Switched on ion gauges
  
  282   Tuesday, March 19, 2013, 09:04 Anders Mjos      Problems/SolutionsVenting TMS section for replacement of TP2 by vacuum group 

    
  
  283   Tuesday, March 19, 2013, 12:34 Anders MjosSiC#28 ITETM4  DoneInstallation of SiC#28 LP-RFQTuesday, March 19, 2013, 12:32 : Turbos
off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting
 grab.n5HwXJ.png20130321_heating_and_signal.PNG 
  284   Tuesday, March 19, 2013, 17:25 Sebastian Raeder      Problems/Solutionsnew turbo installedEdi replaced the faulty turbo pump in the
mass separator section.
Roughing and turbo started
  
  285   Tuesday, March 19, 2013, 19:13 Sebastian Raeder      Problems/Solutions9 Pin connector rewired to match wiring in TM4The 9 Pin connector was rewired in the
ISAC teststand to match the wiring in TM4
The wiring from the connection board
  
  286   Thursday, March 21, 2013, 15:05 Sebastian RaederSiC#28 ITETM4  Done2nd heating of SiC#28 LP-RFQ - short resolved 

    
 20130322_heating.png20130322_massscan_transmission.png20130322_massscan_suppression1.png20130322_suppression2.pnglegs.JPG 
  287   Monday, March 25, 2013, 11:39 Anders MjosTa#39LP-SISITWTM1  DoneTa#39 commissioningTarget installed with 130 in lbs torque
on all bolts.
Monday, March 25, 2013, 11:36: Roughing
  
  288   Monday, March 25, 2013, 16:50 Sebastian Raeder      Problems/SolutionsRFQ powersupplies removed - Anode PS still connected to groundThe powersupplies added to the teststand
for operation of the IGLIS source have been
removed from the HV cage as well as the RFQ
  