544
|
Friday, September 30, 2016, 11:14 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:RP1 Replacement | Friday, September 30, 2016, 10:01: Roughing pump RP1 failed during roughing. Breaker was tripped to RP1 & RP2.
Friday, September 30, 2016, 10:30: Roughing pump RP1 replaced and tested. |
|
543
|
Friday, September 30, 2016, 11:11 |
Aaron Schmidt | SiC#35 | HP-FEBIAD | ITW | TM2 | 39530-9 | 41120-8 | Done | Conditioning SiC#35 | Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01: Roughing stopped. RP1 failure. Breaker tripped.
Friday, September 30, 2016, 11:49: Roughing continued.
Friday, September 30, 2016, 12:37: Turbos started -AM
Monday, October 03, 2016, 09:00: RGA on.
Monday, October 03, 2016, 09:05: Waterline opened. No response on RGA. Vacuum stable @1.70E-7T.
Monday, October 03, 2016, 09:20: Power/Sources on. Gas sources opened/closed.
Monday, October 03, 2016, 09:39: Optics switched on. Monitor TMS:SX2
Monday, October 03, 2016, 09:47: Anode on @ 200 V
Monday, October 03, 2016, 09:49: Coil on @ 50A
Monday, October 03, 2016, 09:50: IV4 opened.
Monday, October 03, 2016, 09:58: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, October 03, 2016, 10:08: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Monday, October 03, 2016, 10:12
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.0 |
3.99 |
TBHT |
27.5 |
3.21 |
COIL + EE |
26.8 |
5.26 |
TGHT |
26.9 |
5.78 |
Monday, October 03, 2016, 11:09: TMS:SX2 Fixed. No optics or sources affected.
Monday, October 03, 2016, 11:38: BIAS @ 30 kV. (Was actually set to 20 kV before). Ramping progress ok.
Monday, October 03, 2016, 15:56: TGHT / TBHT @ 580 / 290 A. RGA restarted.
Wednesday, October 05, 2016, 08:29: Optics found to be tripped : TMS:OCT4 , TMS:Q4 ,TMS:OCT3 ,TMS:SX3 ,TMS:Q3 ,TMS:SX2. Restarted
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.3 |
3.99 |
TBHT |
29.9 |
3.14 |
COIL + EE |
28.8 |
5.07 |
TGHT |
30.8 |
5.72 |
Wednesday, October 05, 2016, 09:20: Wire scanners reset. Emittance rig not reading properly.
Wednesday, October 05, 2016, 09:22: Auto ramping TBHT to 300 A @ 2A per min.
Thursday, October 06, 2016, 15:58: Auto-cooling TGHT / TBHT @ 2A per min.
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.4 |
3.95 |
TBHT |
29.4 |
3.09 |
COIL + EE |
28.8 |
5.05 |
TGHT |
30.8 |
5.70 |
Friday, October 07, 2016, 08:12: Source off - AM
Tuesday, October 11, 2016, 08:28: Turbos off. RGA off -AM
Tuesday, October 11, 2016, 13:38: Venting -AM |
|
542
|
Wednesday, September 14, 2016, 13:58 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 latched breaker |
Anders Mjos wrote: |
Aaron Schmidt wrote: |
Fault report was submitted.
Anders informed Anthony on Tuesday, Sept 6, 2016.
Fault report # 9233.
|
Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi
|
Wednesday, September 14, 2016, 13:57: The pump does not run properly. Attempting to contact vacuum group
Found that the exhaust pipe needed to be disconnected from the pump. Asked plant group (Curtis) to investigate exhaust pipe on the outside of the building, to check if it is restricted again.
Thursday, September 15, 2016, 11:03: Starting turbos
Thursday, September 29, 2016, 11:16: Turbos stopped.
Friday, September 30, 2016, 08:24: Venting. |
|
541
|
Tuesday, September 13, 2016, 14:38 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 replaced |
Aaron Schmidt wrote: |
Fault report was submitted.
Anders informed Anthony on Tuesday, Sept 6, 2016.
Fault report # 9233.
|
Tuesday, September 13, 2016, 14:38: RP1 replaced by Edi |
|
540
|
Thursday, September 08, 2016, 09:12 |
Anders Mjos | | | | | | | Problems/Solutions | Filament change on IG6 | Thursday, September 08, 2016, 08:20: Vacuum group changed to the other filament to investigate vacuum spikes on IG6
Spikes In Green.
Spikes in Grey.
|
|
539
|
Wednesday, September 07, 2016, 15:51 |
Aaron Schmidt | | | | | | | | Flexible waterlines test. | Wednesday, September 07, 2016, 15:35: Roughing
Thursday, September 08, 2016, 08:33: Turbo pumps started.
Thursday, September 08, 2016, 08:38: Ion gauge on. TP1B @ speed 42 KRPM.
Thursday, September 08, 2016, 08:41: TP1A @ speed 38 KRPM.
Thursday, September 08, 2016, 08:47: RGA on.
Thursday, September 08, 2016, 11:00: Checked and screenshots taken. Vacuum @ 1.38E-6T
DaqPro Logger HS+MSP flow checked. Connections disconnect and re-connect.
Thursday, September 08, 2016, 11:45: Waterlines opened. No response on RGA. Vacuum ok @ 1.21 E-6T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.78 |
TBHT |
28.6 |
2.96 |
COIL + EE |
28.2 |
4.89 |
TGHT |
28.4 |
5.49 |
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.6 |
3.68 |
TBHT |
28.6 |
3.02 |
COIL + EE |
28.2 |
4.91 |
TGHT |
28.2 |
5.51 |
Friday, September 09, 2016, 08:51: Vacuum ok @ 3.68E-7T
Friday, September 09, 2016, 15:35: Vacuum ok @ 3.35E-7T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.7 |
3.71 |
TBHT |
28.8 |
3.06 |
COIL + EE |
28.2 |
4.94 |
TGHT |
28.4 |
5.56 |
Monday, September 12, 2016, 08:05: Vacuum ok @ 1.97E-7T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.68 |
TBHT |
29.0 |
3.09 |
COIL + EE |
28.2 |
4.95 |
TGHT |
28.4 |
5.48 |
Monday, September 12, 2016, 15:09: Vacuum ok @ 1.97E-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.72 |
TBHT |
29.1 |
3.06 |
COIL + EE |
28.2 |
4.87 |
TGHT |
28.4 |
5.51 |
Tuesday, September 13, 2016, 08:17: Vacuum ok @ 1.79E-7T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.68 |
TBHT |
28.7 |
3.07 |
COIL + EE |
28.0 |
4.91 |
TGHT |
28.2 |
5.51 |
Tuesday, September 13, 2016, 08:19: RGA off. Ion Gauge off. Turbo pumps off.
Tuesday, September 13, 2016, 08:24: Waterlines purged.
Wednesday, September 14, 2016, 11:33: Venting -AM |
|
538
|
Wednesday, September 07, 2016, 15:50 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:RP1 running uneven | Fault report was submitted.
Anders informed Anthony on Tuesday, Sept 6, 2016.
Fault report # 9233. |
|
537
|
Friday, September 02, 2016, 15:47 |
Aaron Schmidt | SiC#34 | LP-IG-LIS | ITE | TM4 | 39814-V2-1 | 41751-9 | | Conditioning SiC# 34 | Friday, September 02, 2016, 15:47: Roughing.
Friday, September 02, 2016, 16:18: Turbos started -AM
Friday, September 02, 2016, 16:28: Turbos at speed. Vacuum at 2.0E-5 T.
Tuesday, September 06, 2016, 08:13: RGA on.
Tuesday, September 06, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.62E-7T
Tuesday, September 06, 2016, 08:19: Power/sources on.
Tuesday, September 06, 2016, 08:30: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, September 06, 2016, 08:34: IV4 open. Auto ramping TGHT / TBHT to 580 / 250 A @ 2A per min.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.78 |
TBHT |
28.3 |
2.96 |
COIL + EE |
28.0 |
4.89 |
TGHT |
29.6 |
5.50 |
Tuesday, September 06, 2016, 13:56: Auto ramping TBHT to 270A @ 2A per min
Tuesday, September 06, 2016, 14:05: Turbo pump TP1A found off. Restarted.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
38.4 |
0.07 |
TBHT |
28.5 |
2.98 |
COIL + EE |
28.0 |
4.92 |
TGHT |
30.0 |
5.54 |
Tuesday, September 06, 2016, 20:49: Ramping down TGHT / TBHT at 2 / 1 A/min
Wednesday, September 07, 2016, 08:46: Sources off. RGA error out. RGA off
Wednesday, September 07, 2016, 08:53: IV4 closed. Ion gauge off.
Wednesday, September 07, 2016, 08:54: Turbo pumps off.
Wednesday, September 07, 2016, 09:06: Power off. Water lines purged.
Wednesday, September 07, 2016, 09:54: Venting. |
|
536
|
Monday, August 29, 2016, 10:08 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Monday, August 29, 2016, 10:07: Roughing.
Friday, September 02, 2016, 14:33: Venting |
|
535
|
Wednesday, August 24, 2016, 09:16 |
Aaron Schmidt | | | | | 41882-4 | 41751-6 | | HS Test OR Clean | Heat Shield Test (OR only).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-6 . OR only.
No insulators, bracket, or gripper arms. Blank/Plate (new one, old plate was too warped). No source cup.
Wednesday, August 24, 2016, 09:46 : 41751-3 removed from test stand. Exchange target & End plates to 41751-6
Wednesday, August 24, 2016, 10:08: 41751-6 placed into test stand. Door open for 22 minutes.
Wednesday, August 24, 2016, 10:10: Roughing.
Wednesday, August 24, 2016, 10:10: Doors sealed for roughing.
Wednesday, August 24, 2016, 10:18: BV1B OPEN. Opened @ 79T.
Wednesday, August 24, 2016, 10:41: Both Turbo pumps started.
Wednesday, August 24, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, August 24, 2016, 10:49: TP1A @ speed 38 KRPM.
Wednesday, August 24, 2016, 11:45: RGA on. Vacuum @ 3.38E-6T.
Thursday, August 25, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.36E-7T
Thursday, August 25, 2016, 08:20: Power/sources on.
Thursday, August 25, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.36E-7T.
Thursday, August 25, 2016, 11:21: Screen shots and check made @ 340-344A.
Thursday, August 25, 2016, 13:20: TGHT @ 580A. Vacuum @3.70E-7T.
Friday, August 26, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.53E-7T
Friday, August 26, 2016, 13:20: Cooling Complete. Vacuum @ 1.97E-7T
Monday, August 29, 2016, 08:19: RGA off. Ion gauge and Turbos off.
Monday, August 29, 2016, 09:28: Venting.
Monday, August 29, 2016, 09:35: Power/sources off. Waterlines purged. |
|
534
|
Monday, August 22, 2016, 08:20 |
Aaron Schmidt | | | | | 41882-4 | 41751-3 | | HS Test Full Clean | Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-3 . OR, Acetone, Methanol. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate (Warped from 41751-5). No source cup.
Monday, August 22, 2016, 09:50: 41751-5 removed from test stand. Exchange target & End plates to 41751-3
Monday, August 22, 2016, 10:15: 41751-3 placed into test stand. Door open for 25 minutes.
Monday, August 22, 2016, 10:18: Roughing.
Monday, August 22, 2016, 10:19: Doors sealed for roughing.
Monday, August 22, 2016, 10:25: BV1B OPEN. Opened @ 151T.
Monday, August 22, 2016, 10:50: Both Turbo pumps started.
Monday, August 22, 2016, 10:54: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, August 22, 2016, 10:58: TP1A @ speed 38 KRPM.
Monday, August 22, 2016, 11:50: RGA on. Vacuum @ 3.91E-6T.
Tuesday, August 23, 2016, 08:16: Water lines opened. No response on RGA. Vacuum stable @ 2.45E-7T
Tuesday, August 23, 2016, 08:19: Power/sources on.
Tuesday, August 23, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum @ 2.45E-7T.
Tuesday, August 23, 2016, 13:20: TGHT @ 580A. Vacuum @3.79E-7T.
Tuesday, August 23, 2016, 16:06: Auto-cooling started @ 2A/min. Vacuum @ 3.96E-7T.
Wednesday, August 24, 2016, 08:08: RGA off. Ion gauge and Turbos off.
Wednesday, August 24, 2016, 08:14; Power/sources off.
Wednesday, August 24, 2016, 08:25: Waterlines purged.
Wednesday, August 24, 2016, 09:14: Venting. |
|
533
|
Wednesday, August 17, 2016, 08:19 |
Aaron Schmidt | | | | | 41882-4 | 41751-5 | | HS Test OR Clean | Heat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-5 . OR only. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Wednesday, August 17, 2016, 09:45: 41751-4 removed from test stand. Exchange target & End plates to 41751-5
Wednesday, August 17, 2016, 10:08: 41751-5 placed into test stand. Door open for 22 minutes.
Wednesday, August 17, 2016, 10:10: Roughing.
Wednesday, August 17, 2016, 10:10: Doors sealed for roughing.
Wednesday, August 17, 2016, 10:18: BV1B OPEN. Opened @ 136T.
Wednesday, August 17, 2016, 10:41: Both Turbo pumps started.
Wednesday, August 17, 2016, 10:46: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, August 17, 2016, 10:50: TP1A @ speed 38 KRPM.
Wednesday, August 17, 2016, 11:47: RGA on. Vacuum @ 3.65E-6T.
Thursday, August 18, 2016, 08:19: Water lines opened. No response on RGA. Vacuum stable @ 2.53E-7T.
Thursday, August 18, 2016, 08:22: Power/sources on.
Thursday, August 18, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.45E-7T.
Thursday, August 18, 2016, 11:39: Screen shots and check made @ 380-381A.
Thursday, August 18, 2016, 13:20: TGHT @ 580A. Vacuum @4.21E-7T.
Friday, August 19, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.88E-7T
Friday, August 19, 2016, 13:20: Cooling Complete. Vacuum @ 2.25E-7T.
Friday, August 19, 2016, 13:42: Water lines purged. Power/sources off.
Monday, August 22, 2016, 08:17: Vacuum @ 1.37E-7T. RGA off. Ion gauge off. Turbos off.
Monday, August 22, 2016, 09:16: Venting.
Flat Head screw on bottom end plate stripped. Warping found on cup Blank/plate. Discoloration noted on heat shield |
|
532
|
Monday, August 15, 2016, 08:09 |
Aaron Schmidt | | | | | 41882-4 | 41751-4 | | HS Test OR Clean | Heat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-4 . OR only. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Monday, August 15, 2016, 09:45: 41751-2 removed from test stand. Exchange target & End plates to 41751-2
Monday, August 15, 2016, 10:07: 41751-4 placed into test stand. Door open for 22 minutes.
Monday, August 15, 2016, 10:10: Roughing.
Monday, August 15, 2016, 10:12: Doors sealed for roughing.
Monday, August 15, 2016, 10:21: BV1B OPEN. Opened @ 104T.
Monday, August 15, 2016, 10:44: Both Turbo pumps started.
Monday, August 15, 2016, 10:50: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, August 15, 2016, 10:52: TP1A @ speed 38 KRPM.
Monday, August 15, 2016, 11:45: RGA on. Vacuum @ 4.20E-6T.
Tuesday, August 16, 2016, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 2.43E-7T
Tuesday, August 16, 2016, 08:20: Power/sources on
Tuesday, August 16, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.45E-7T
Tuesday, August 16, 2016, 11:15: Screen shots and check made @ 329-330A.
Tuesday, August 16, 2016, 13:20: TGHT @ 580A. Vacuum @4.16E-7T.
Tuesday, August 16, 2016, 16:00: Auto-cooling started @ 2A/min. Vacuum @ 4.25E-7T
Wednesday, August 17, 2016, 08:11: Vacuum @ 1.90E-7T. RGA off. Ion gauge off. Turbos off.
Wednesday, August 17, 2016, 08:16: Water lines purged. Power/sources off.
Wednesday, August 17, 2016, 09:09: Venting. |
|
531
|
Friday, August 12, 2016, 14:40 |
Aaron Schmidt | | | | | | | Problems/Solutions | Emittance scanner communications | Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05
Emittance rig communications affected.
Enter 100 on Dac -- Reads: -500
Enter -100 on Dac -- Reads: -500. No response
@ 10V
Friday, August 12, 2016, 15:53: Soft reboot on Emittance rig communications
Calibrate
test scan & park
Enter: 100 on Dac -- Reads 100
Enter: 200 on Dac -- Reads 200
Enter: 0 on Dac -- Reads 0
Enter: -200 on Dac -- Reads -200
Fixed |
|
530
|
Wednesday, August 10, 2016, 08:09 |
Aaron Schmidt | | | | | 41882-4 | 41751-2 | | HS Test Full Clean | Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-2 . OR, Acetone, Methanol. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Wednesday, August 10, 2016, 09:47: 41751-1 removed from test stand. Exchange target & End plates to 41751-2
Wednesday, August 10, 2016, 10:07: 41751-2 placed into test stand. Door open for 20 minutes.
Wednesday, August 10, 2016, 10:10: Roughing.
Wednesday, August 10, 2016, 10:13: Doors finally sealed for roughing.
Wednesday, August 10, 2016, 10:23: BV1B OPEN. Opened @ 59T.
Wednesday, August 10, 2016, 10:45: Both Turbo pumps started.
Wednesday, August 10, 2016, 10:50: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, August 10, 2016, 10:53: TP1A @ speed 38 KRPM
Wednesday, August 10, 2016, 11:45: RGA on. Vacuum @ 3.56E-6T
Thursday, August 11, 2016, 08:16: Water lines opened. No response on RGA. Vacuum stable @ 2.34E-7T
Thursday, August 11, 2016, 08:19: Power/sources on
Thursday, August 11, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 2.36E-7T
Thursday, August 11, 2016, 11:15: Screen shots and check made @ 329-330A.
Thursday, August 11, 2016, 13:25: TGHT @ 580A. Vacuum @4.16E-7T
Thursday, August 11, 2016, 15:54: Screen shots and check made @ 580A. Vacuum @4.43E-7T and increasing. Cool in Am.
Friday, August 12, 2016, 08:30: Auto-cooling started @ 2A/min. Vacuum @ 3.88E-7T
Friday, August 12, 2016, 13:20: Cooling Complete. Vacuum @ 2.16E-7T.
Friday, August 12, 2016, 13:33: Water lines purged. Power/sources off.
Monday, August 15, 2016, 08:07: Turbo pumps, Ion gauge, and RGA off.
Monday, August 15, 2016, 09:14: Venting. |
|
529
|
Monday, August 08, 2016, 09:48 |
Aaron Schmidt | | | | | 41882-4 | 41751-1 | | HS Test Full Clean | Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
-Start Roughing by 10:10am +/- 1 minute and ensure previous HS started venting by 9:15am to meet timeline.
HS# 41751-1 . OR, Acetone, Methanol. TGHT only.
No insulators, bracket, or gripper arms. Blank/Plate. No source cup.
Monday, August 08, 2016, 09:58: Ta#49 removed from test stand.
Monday, August 08, 2016, 10:07: 41751-1 placed into test stand. Door open for 9 minutes.
Monday, August 08, 2016, 10:10: Roughing.
Monday, August 08, 2016, 10:18: BV1B OPEN. Opened @ 88T.
Monday, August 08, 2016, 10:40: Both Turbo pumps started.
Monday, August 08, 2016, 10:45: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, August 08, 2016, 10:48: TP1A @ speed 38 KRPM.
Monday, August 08, 2016, 11:45: RGA on. Vacuum @ 2.02E-6T
Tuesday, August 09, 2016, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.99E-7T
Tuesday, August 09, 2016, 08:19: Power/sources on.
Tuesday, August 09, 2016, 08:30: TGHT auto-ramping to 580A @ 2A/min. Vacuum stable @ 1.99E-7T
Tuesday, August 09, 2016, 11:15: Screen shots and check made @ 329-330A
Tuesday, August 09, 2016, 13:20: TGHT @ 580A. Vacuum @4.23E-7T
Tuesday, August 09, 2016, 16:00: Auto-cooling @ 2A/min. Vacuum @ 3.77E-7T
Wednesday, August 10, 2016, 08:00: Vacuum @ 1.70E-7T. RGA off. Ion gauge off. Turbos off.
Wednesday, August 10, 2016, 09:14: Venting. |
|
528
|
Wednesday, August 03, 2016, 13:47 |
Aaron Schmidt | Ta#49 | HP-SIS | ITW | TM2 | | 41751-10 | | Conditioning Ta#49 | Wednesday, August 03, 2016, 13:47: Roughing
Wednesday, August 03, 2016, 14:17: Turbo pumps started.
Wednesday, August 03, 2016, 14:22: Ion gauge on.
Thursday, August 04, 2016, 08:17: Water lines opened. No response on RGA. Vacuum stable @ 2.96E-7T
Thursday, August 04, 2016, 08:20: Power/Sources on.
Thursday, August 04, 2016, 08:30: BIAS/EZL/EE @ 30/ 13/ 1.5 kV .
Thursday, August 04, 2016, 08:35: IV4 open. Auto ramping TGHT/TBHT to 580/200 A @ 2A/1A per min.
Thursday, August 04, 2016, 15:06:
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.3 |
3.85 |
TBHT |
28.8 |
3.00 |
COIL + EE |
27.6 |
4.89 |
TGHT |
29.6 |
5.50 |
Friday, August 05, 2016, 10:12: RGA lost connection. Restarting.
Friday, August 05, 2016, 13:25: Graham Waters contacted. Constant voltage on emittance rig power supply. 10V? Spark from a while ago? Unable to scan.
Friday, August 05, 2016, 14:13: Auto cooling TGHT/TBHT @ 2A/1A per min.
Friday, August 05, 2016, 16:02: BIAS/ EZL/ EE @ 0/ 0/ 0 kV. Cooling continued.
Monday, August 08, 2016, 08:22 : RGA off. IV4 Closed.
Monday, August 08, 2016, 08:23: Turbo pumps off.
Monday, August 08, 2016, 08:26: Waterlines purged. Power off.
Monday, August 08, 2016, 09:27: Venting.
|
|
527
|
Thursday, July 28, 2016, 11:12 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. | Thursday, July 28, 2016, 10:00 Roughing. |
|
526
|
Thursday, July 28, 2016, 08:21 |
Anders Mjos | | | | | | | Problems/Solutions | TMS:MB1 time out | Fault report submitted. 9156
Thursday, July 28, 2016, 09:55: Controls group resolved the issue by cycling the power on the canbus controller |
|
525
|
Thursday, July 21, 2016, 09:51 |
Aaron Schmidt | | LP-FEBIAD | | | | | | Febiad Test - NEW COIL - No PE | Thursday, July 21, 2016, 08:55: Roughing.
Thursday, July 21, 2016, 09:50: Turbo pumps started.
Thursday, July 21, 2016, 09:54: Ion Gauge on.
Thursday, July 21, 2016, 11:12: RGA on.
Thursday, July 21, 2016, 15:12: Water lines opened. No response on RGA. Vacuum stable @ 5.7E-7 T
Friday, July 22, 2016, 08:40: Opening gas lines.
Friday, July 22, 2016, 09:09: Power/Sources on. BIAS/EZL/EE @ 30/13/1.5 kV . Coil @ 50 A . Anode @ 200 V.
Friday, July 22, 2016, 09:13: IV4 open. Auto ramping TGHT/TBHT to 580/270 A @ 2A/per min.
Friday, July 22, 2016, 09:18: Heat shield flow rate @ 3.82 lpm
Friday, July 22, 2016, 12:10: TBHT ramped to 300 A -AM
Friday, July 22, 2016, 14:08: TBHT ramped to 310 A -AM
Monday, July 25, 2016, 09:39:
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
38.0 |
3.82 |
TBHT |
27.9 |
2.96 |
COIL + EE |
27.7 |
4.94 |
TGHT |
29.7 |
5.51 |
Monday, July 25, 2016, 16:29: Changed the tune to improve mass resolution.
Wednesday, July 27, 2016, 14:37: Spark tripped off IG6
Wednesday, July 27, 2016, 14:38: BIAS / EZL / EE to 40 / 17.5 / 2 kV
Wednesday, July 27, 2016, 14:51: BIAS / EZL / EE to 45 / 19 / 2.5 kV
Wednesday, July 27, 2016, 15:00: BIAS / EZL / EE to 50 / 21.6 / 2.5 kV
Wednesday, July 27, 2016, 16:06: Spark around 15:10 or 16:05 knocked out magnet (RED)
Wednesday, July 27, 2016, 17:0: BIAS / EZL / EE to 30 / 13 / 1.5 kV. Ramping down target
Thursday, July 28, 2016, 08:03 : Turn off sources. Close IV4. Turn off Ion gauge. Turbos off.
Thursday, July 28, 2016, 09:09: Source gas control off. Venting.
|
|