Entry  Monday, September 09, 2013, 09:14, Anders Mjos, , , , , , , Problems/Solutions, Ground Electrode cleaned Dirty_GE.pdf

Monday, September 16, 2013, 17:04: Cleaned GE. Copper shavings were removed from below the guide pins for the Heat Shield. The shavings were sitting on top of the aluminum support.

Entry  Tuesday, September 17, 2013, 10:06, Anders Mjos, , , , , , , Problems/Solutions, TGHT insulator cracked Photo_2013-09-16_3_53_19_PM.jpg

The coil insulator has been observed to have cracked earlier. 

Entry  Wednesday, September 18, 2013, 14:54, Anders Mjos, , , , , , , Problems/Solutions, Hall probe calibration 2013-09-18_NiOcalibration.png

New calibration of the m/q based on the hall probe after exchanging the controller(MASSOVERQ2). Based on NiO#2-HP-FEBIAD with Ne supplied and ANODE biased to 200V, 30kV Bias.

CONST11 = -16.3929
CONST22 = 0.12481

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2013-09-18-09%20NiO%232

Data and results from Gnuplot

"2013-09-18 NiOcalibration.txt"
6.02 -1192 6Li
7.02 -1288 7Li
19.99 -2177 20Ne
21.99 -2284 22Ne
38.96 -3043 40K
40.96 -3118 41K
180.9 -6577 Ta
196.9 -6864 TaO

f(x)=((x+a)**2)*b/30000;
a=35.221;
b=0.129991;
fit f(x) "2013-09-18 NiOcalibration.txt" using 2:1 via a,b;

Final set of parameters Asymptotic Standard Error
======================= ==========================

a = -16.3929 +/- 2.015 (12.29%)
b = 0.12481 +/- 8.448e-005 (0.06769%)


correlation matrix of the fit parameters:

a b
a 1.000
b 0.952 1.000  

Entry  Wednesday, September 18, 2013, 16:18, Anders Mjos, , HP-FEBIAD, , , Tube only, 38307-9, Done, Test Target - FEBIAD COIL 

Wednesday, September 18, 2013, 16:18: Starting turbos

Wednesday, September 18, 2013, 16:26 : Turbos at speed

Wednesday, September 18, 2013, 16:28 : Vacuum at 2.8 E-5 T


Wednesday, September 25, 2013, 15:11
TGHT flow 5.52, temp 28.6
TBHT flow 5.92, temp 28.5


Thursday, September 26, 2013, 09:25: Stopped turbos. Vacuum at 1.4 E-7 T


Friday, September 27, 2013, 08:35
TGHT flow 5.49, temp 28.2
TBHT flow 5.90, temp 28.0

Friday, September 27, 2013, 10:47: Venting 

Entry  Monday, September 30, 2013, 15:19, Anders Mjos, , , , , , , Problems/Solutions, New purging valves installed on Heat Shield water circuit 

The Heat Shield circuit can now be separately purged for water. Use valves on heat shield circuit to purge the lines for target exchanges from now on.

All paddle wheels have been rotated to allow trapped air to escape the system more easily.

Entry  Thursday, October 03, 2013, 08:43, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP2 tripped off - controller replaced. 

This morning the turbo was found tripped off. 

The controller was replaced by Edi on Friday.


Monday, October 07, 2013, 08:28: Starting Turbo

Monday, October 07, 2013, 08:29: Turbo at speed. Vacuum at 4.4E-7 T

Entry  Thursday, October 03, 2013, 14:15, Anders Mjos, , , , , , , Problems/Solutions, TMS:Q1 and Q6 tripped 
 
Entry  Tuesday, October 15, 2013, 16:17, Anders Mjos, , , , , , , Done, TGHT and TB HT test bar test 

HS line is looped. Cu-test bars installed on TGHT and TBHT. Torqued all bolts  to 120 in lbs.

Tuesday, October 15, 2013, 16:17: Roughing

Tuesday, October 15, 2013, 16:39: Turbos started.

Tuesday, October 15, 2013, 16:48: Turbos at speed

Tuesday, October 15, 2013, 16:49: Vacuum at 3.0 E-5 T


Wednesday, October 16, 2013, 08:38: Opened water on HS. Vacuum stable at 5.5E-7 T.

Wednesday, October 16, 2013, 10:12: TBHT to 300A (0.623V) TGHT to 580A (1.443 V)

Wednesday, October 16, 2013, 10:13: Ramping down at 6A/min


Thursday, October 17, 2013, 08:33: Turbos stopped. Vacuum at 2.6E-7 T.

Thursday, October 17, 2013, 10:24: Venting

Turned TGHT Cu-bar 180 deg. Loosened and re-fastened all bolts to 120 in lbs.

Thursday, October 17, 2013, 10:48: Roughing.

Thursday, October 17, 2013, 11:07: Turbos started.

Thursday, October 17, 2013, 11:16: Turbos at speed.

Thursday, October 17, 2013, 11:17: Vacuum at 1.2E-5 T

 TGHT and TBHT were brought up to 580A and 300A.


Flow meters connected.

TGHT
T  27.8
Q 5.5

Monday, October 21, 2013, 13:34: Heating TGHT to 580A (1.411 V)

Monday, October 21, 2013, 13:37
TGHT
T  28.9
Q 5.4

Monday, October 21, 2013, 13:40
TGHT
T  29.1
Q 5.5

Monday, October 21, 2013, 13:45
TGHT
T  29.4
Q 5.4

TGHT RDCUR/VOL 581.5A / 1.421 V

Monday, October 21, 2013, 13:47
TGHT RDCUR/VOL 270.6 A / 0.674V
T  28.4
Q 5.4

Monday, October 21, 2013, 13:52
TGHT RDCUR/VOL 270.6 A / 0.674V
T  28.3
Q 5.5

Monday, October 21, 2013, 13:52: TGHT off.

TGHT
T  27.9
Q 5.5


Tuesday, October 22, 2013, 08:09: Stopped turbos. Vacuum at 1.4E-7 T

Tuesday, October 22, 2013, 12:29: Venting

 

Results in DocuShare collection

Entry  Tuesday, October 22, 2013, 15:20, Rick Maharaj, , , , , , , Problems/Solutions, Target Heater Conductor Block Insulators Replaced Source_Tray_TGHT_and_COIL_insulators_replaced_2013-10.pdf

The Conductor insulating blocks - ITD053C and ITD054C - that secure the target heater and coil conductor blocks were replaced. The existing ones were cracked and fell apart upon removal.

Entry  Tuesday, November 05, 2013, 15:50, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A and CG1B elevated Vacuum.png

Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.

Tuesday, November 12, 2013, 09:51 UPDATE
 Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week.

Entry  Tuesday, November 12, 2013, 12:38, Anders Mjos, , , , , , , Problems/Solutions, Vacuumed desk, on and around the beam line 
 
    Reply  Wednesday, November 20, 2013, 08:57, Anders Mjos, , , , , , , Problems/Solutions, Backing pressure TSG:CG1A and CG1B elevated 

 

Anders Mjos wrote:

Pressure around 140 mTorr. The pressure started increasing early November 2nd. Will continue to monitor.

Tuesday, November 12, 2013, 09:51 UPDATE
 Backing pressure further increased to ~ 350 mTorr over the weekend. Vacuum group has been informed and will replace the pump this week.

 

 The backing pump (TSG:RP1) was replaced yesterday by Anthony Ip. Backing pressure is down to 1 mTorr on TSG:CG1A

Entry  Wednesday, November 27, 2013, 08:27, Anders Mjos, , , , , , , Problems/Solutions, EPICS whiteout 

Since yesterday around 4pm. Due to attempt to use the TMS:ER0 device.

IOC rebooted this morning. Archivers restarted.

Entry  Monday, December 02, 2013, 08:36, Anders Mjos, , , , , , , Problems/Solutions, Sources archiver started 
 
Entry  Monday, December 02, 2013, 15:21, Anders Mjos, , , , , , , Problems/Solutions, Xantrex 10V 600A installed and in Cathode Negative mode 

By Ray Dube. 

Entry  Wednesday, December 04, 2013, 09:22, Anders Mjos, , , , , , , In progress, Testing impedance with the new TBHT P/S 

Wednesday, December 04, 2013, 09:21 : Turbos stopped. Vacuum at  1.2E-7 Torr

Wednesday, December 04, 2013, 12:35: Venting

Copper bars installed w/ 130 in lbs torque

Wednesday, December 04, 2013, 13:06: Roughing

Wednesday, December 04, 2013, 15:16: Turbos started. Vacuum at 0.03 Torr

Wednesday, December 04, 2013, 15:23: Turbos at speed.

Wednesday, December 04, 2013, 15:26: Vacuum at  5E-6 Torr


Thursday, December 05, 2013

Impedance measured on TGHT and TBHT (~2.5 mOhm and ~2.0 mOhm). Readback on TBHT gives an impedance of ~2.5 mOhm. This is higher than the previous test. Local current on TBHT shows 60A more than the readback at 300A.  The vacuum did not come down as low as usual, which likely means there is a leak.

Thursday, December 05, 2013, 13:15: Turbos stopped.


Friday, December 06, 2013, 13:11: Venting

Gaskets on doors cleaned.

Friday, December 06, 2013, 13:40: Roughing

Friday, December 06, 2013, 13:59: Starting turbos

Friday, December 06, 2013, 14:07: Turbos at speed.

Friday, December 06, 2013, 14:09: Vacuum at 1.4 E-5 Torr


Monday, December 09, 2013, 08:46: Vacuum at 2.0 E-5 Torr 

Entry  Thursday, December 12, 2013, 09:01, Anders Mjos, , , , , , , Problems/Solutions, Vacuum excursion over night VacuumExcursion-2013-12-12.pngVacuumExcursion-2013-12-16.png

Monday, December 16, 2013, 08:53
Some additional smaller magnitude excursions have been observed since the fist on on Dec. 12th. See attached plot. 

Entry  Wednesday, December 18, 2013, 12:04, Anders Mjos, , , , , 40282-5, 39230-1, Done, Heating Test 

 Wednesday, December 18, 2013, 12:04: Turbos stopped

Wednesday, December 18, 2013, 13:19: Venting

Ta-tube installed. All bolts torqued to 130 in lbs

Thermocouples installed.

CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe left side - type C
CH3 6/7: inside probe right side - type C
CH4 8/9: welded on leg - type K

Wednesday, December 18, 2013, 14:41: Roughing

Initial temperatures
CH1  28.1
CH2  30.7
CH3  31.3
CH4  31.0

Wednesday, December 18, 2013, 15:50: Starting turbos.

Wednesday, December 18, 2013, 15:58: Turbos at speed.

Wednesday, December 18, 2013, 16:00: Vacuum at 9.3E-6 Torr


Thursday, December 19, 2013, 09:35  : Opened water for HS. Vacuum stable at 2.5E-7 Torr. Flow ~ 3.9 l/min

temperatures
CH1  26.3
CH2  Un
CH3  28.7
CH4  30.5

Thursday, December 19, 2013, 16:50: Ta-tube at 500A ~ 1380 deg C.

temperatures
CH1  33.6
CH2  1319.3
CH3  1443.4
CH4  20.1


Heated to 580A

Friday, December 20, 2013, 10:48: Started cool down at 2A/min.

Friday, December 20, 2013, 15:46: Switched off TGHT.

Entry  Friday, December 20, 2013, 15:46, Anders Mjos, , , , , , , Problems/Solutions, Water switched off for the holidays 
 
Entry  Thursday, January 02, 2014, 11:53, Anders Mjos, , , , , , , Problems/Solutions, The computer will not boot Windows 

The computer has been brought over to PC support for diagnostics. 

Hard Drive was found to be corrupted. A new HD will be installed and Windows upgraded to a newer version.


Thursday, January 16, 2014

The PC has gotten a new HD with Windows 8.

Xming and PuTTY installed and configured for access to EPICS controls