Wednesday, December 04, 2013, 09:22, Anders Mjos, , , , , , , In progress, Testing impedance with the new TBHT P/S
|
Wednesday, December 04, 2013, 09:21 : Turbos stopped. Vacuum at 1.2E-7 Torr
Wednesday, December 04, 2013, 12:35: Venting
Copper bars installed w/ 130 in lbs torque
Wednesday, December 04, 2013, 13:06: Roughing
Wednesday, December 04, 2013, 15:16: Turbos started. Vacuum at 0.03 Torr
Wednesday, December 04, 2013, 15:23: Turbos at speed.
Wednesday, December 04, 2013, 15:26: Vacuum at 5E-6 Torr
Thursday, December 05, 2013
Impedance measured on TGHT and TBHT (~2.5 mOhm and ~2.0 mOhm). Readback on TBHT gives an impedance of ~2.5 mOhm. This is higher than the previous test. Local current on TBHT shows 60A more than the readback at 300A. The vacuum did not come down as low as usual, which likely means there is a leak.
Thursday, December 05, 2013, 13:15: Turbos stopped.
Friday, December 06, 2013, 13:11: Venting
Gaskets on doors cleaned.
Friday, December 06, 2013, 13:40: Roughing
Friday, December 06, 2013, 13:59: Starting turbos
Friday, December 06, 2013, 14:07: Turbos at speed.
Friday, December 06, 2013, 14:09: Vacuum at 1.4 E-5 Torr
Monday, December 09, 2013, 08:46: Vacuum at 2.0 E-5 Torr |
Thursday, December 12, 2013, 09:01, Anders Mjos, , , , , , , Problems/Solutions, Vacuum excursion over night
|
Monday, December 16, 2013, 08:53
Some additional smaller magnitude excursions have been observed since the fist on on Dec. 12th. See attached plot. |
Wednesday, December 18, 2013, 12:04, Anders Mjos, , , , , 40282-5, 39230-1, Done, Heating Test
|
Wednesday, December 18, 2013, 12:04: Turbos stopped
Wednesday, December 18, 2013, 13:19: Venting
Ta-tube installed. All bolts torqued to 130 in lbs
Thermocouples installed.
CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe left side - type C
CH3 6/7: inside probe right side - type C
CH4 8/9: welded on leg - type K
Wednesday, December 18, 2013, 14:41: Roughing
Initial temperatures
CH1 28.1
CH2 30.7
CH3 31.3
CH4 31.0
Wednesday, December 18, 2013, 15:50: Starting turbos.
Wednesday, December 18, 2013, 15:58: Turbos at speed.
Wednesday, December 18, 2013, 16:00: Vacuum at 9.3E-6 Torr
Thursday, December 19, 2013, 09:35 : Opened water for HS. Vacuum stable at 2.5E-7 Torr. Flow ~ 3.9 l/min
temperatures
CH1 26.3
CH2 Un
CH3 28.7
CH4 30.5
Thursday, December 19, 2013, 16:50: Ta-tube at 500A ~ 1380 deg C.
temperatures
CH1 33.6
CH2 1319.3
CH3 1443.4
CH4 20.1
Heated to 580A
Friday, December 20, 2013, 10:48: Started cool down at 2A/min.
Friday, December 20, 2013, 15:46: Switched off TGHT. |
Friday, December 20, 2013, 15:46, Anders Mjos, , , , , , , Problems/Solutions, Water switched off for the holidays
|
|
Thursday, January 02, 2014, 11:53, Anders Mjos, , , , , , , Problems/Solutions, The computer will not boot Windows
|
The computer has been brought over to PC support for diagnostics.
Hard Drive was found to be corrupted. A new HD will be installed and Windows upgraded to a newer version.
Thursday, January 16, 2014
The PC has gotten a new HD with Windows 8.
Xming and PuTTY installed and configured for access to EPICS controls |
Tuesday, January 14, 2014, 08:58, Anders Mjos, , , , , 40282-5, 39230-1, Done, Heating Test
|
Tuesday, January 14, 2014, 08:57: Stopping turbos. Vacuum at 1.2E-7 T
Tuesday, January 14, 2014, 13:32: Venting
Ta-tube installed. All bolts torqued to 130 in lbs
Thermocouples installed. CH2/3 left/right swapped with respect to previous test.
CH1 1/2: welded outside tube centre - type C
CH2 4/5: inside probe right side - type C
CH3 6/7: inside probe left side - type C
CH4 8/9: welded on leg - type K
Tuesday, January 14, 2014, 15:10: Roughing
Tuesday, January 14, 2014, 15:33: Starting turbos.
Tuesday, January 14, 2014, 15:42: Turbos at speed
Tuesday, January 14, 2014, 15:43: Vacuum at 2.3E-5 T
Wednesday, January 15, 2014, 10:32: Opened water. Vacuum stable at 2.9E-7 T.
Monday, January 20, 2014
Started heating the Target-tube.
Pressure increase observed on water supply around 10. Supply ~100psi, return ~7 psi
Tuesday, January 21, 2014
Continue heating from 250 A
Tuesday, January 21, 2014, 15:47: TGHT at 580 A, 7.23 V
Wednesday, January 22, 2014
Target-tube cooled down over night. Will went to investigate TC connections.
Wednesday, January 22, 2014, 08:38 : Turbos stopped. Vacuum at 1.3E-7 T |
Thursday, January 16, 2014, 15:00, Anders Mjos, , , , , , , Problems/Solutions, Flow and temperature meter
|
Flow and temperature meter previously installed on cooling circuits. See attachment for details.
Typical values at 95 psi in and 10 psi out. Cyclotron off.
Device
|
Temp
[°C] |
Flow
[lpm]
|
Heat Shield and Mounting Support Plate |
25 |
3.9 |
Tube Heater |
25 |
6.2 |
Coils and Extraction Electrode |
25 |
5.0 |
Target Heater |
25 |
5.5 |
|
Friday, January 24, 2014, 10:49, Anders Mjos, , , , , , , Problems/Solutions, Venting the optics section to investigate Emittance Rig installation
|
Friday, January 24, 2014, 10:49 : Stopped turbos. Vacuum at 2.5E-7 T
Friday, January 24, 2014, 12:52: Venting
Finished evaluating emittance rig installation.
Friday, January 24, 2014, 14:25: Roughing.
The Cu-tubing for cooling the Turbo pumps broke off during disassembly. New ferrules could not be located on site and may have to be ordered.
The system will be left under roughing vacuum over the weekend.
Wednesday, January 29, 2014
Cooling for Turbo pumps reconnected. |
Wednesday, January 29, 2014, 14:42, Anders Mjos, , , , , , , Problems/Solutions, Valved off water to TSG and TMS:MB1
|
CuLCW will be shut off tomorrow. Valved off water supply to MB1 and TSG to minimize air into the system. Turbos are off. |
Thursday, January 30, 2014, 15:38, Anders Mjos, , , , , , , Problems/Solutions, Starting turbos after CuLCW shut off
|
Anders Mjos wrote: |
CuLCW will be shut off tomorrow. Valved off water supply to MB1 and TSG to minimize air into the system. Turbos are off.
|
Opened up for water flow.
Thursday, January 30, 2014, 15:30: Started turbos
Thursday, January 30, 2014, 15:34: TP2 and TP6 at speed. Vacuum at 2.5E-5 T
Thursday, January 30, 2014, 15:34: TP1B at speed. Vacuum at 1.3E-5 T
Thursday, January 30, 2014, 15:38: TP1A at speed. Vacuum at 1.6E-6 T |
Wednesday, February 05, 2014, 11:27, Anders Mjos, , , , , , , Problems/Solutions, Emittance Rig installation
|
Wednesday, February 05, 2014, 11:27 : Stopped turbos
- 2x spacers ITD0468 1/8" THK installed to shift the wire scanner screen closer to the wire scanner. (ITD0469 1/16" THK spacers not used).
- Emittance Rig installed. Manually actuated from out -> in -> out position. No interference observed.
- Replaced two insulators on wire scanner screens that broke in the installation process. New insulators kindly donated from ISIS.
By Anders and Ayan.
Wednesday, February 05, 2014, 16: Roughing
Thursday, February 06, 2014, 08:42: Turbos started
Thursday, February 06, 2014, 08:50: Turbos at speed. IG6 6.2E-6 T, IG1 1.3 E-6 T |
Wednesday, February 12, 2014, 09:01, Anders Mjos, , , , , , , In progress, Testing Cleaning sample
|
Wednesday, February 12, 2014, 08:55: Stopped turbos
Wednesday, February 12, 2014, 11:28: Venting
Installed one sample. No cleaning. Connection tabs wiped with alcohol to prevent making the source tray dirty.
Wednesday, February 12, 2014, 13:17: Started roughing
Wednesday, February 12, 2014, 13:38: Started turbos
Wednesday, February 12, 2014, 13:42: TP1B at speed. Vacuum at 5.4E-5 T
Wednesday, February 12, 2014, 13:46: TP1A at speed. Vacuum at 1.9E-5 T
Wednesday, February 12, 2014, 13:48: Vacuum at 1.7E-5 T
EPICS white-out due to ER0 activity. Graham assisted in getting the system back up.
Wednesday, February 12, 2014, 15:16 : Vacuum at 4.8E-6 T
Friday, February 27, 2014
Leak checked doors. No leak found.
Friday, February 28, 2014, 08:42: Opened up water supply. Major vacuum response.
Friday, February 28, 2014, 08:42: Stopped turbos
Friday, February 28, 2014, 10:19: Venting
Removed cleaning sample.
Friday, February 28, 2014, 11:38: Pumping down empty chamber
Friday, February 28, 2014, 11:56 : Starting Turbos
Friday, February 28, 2014, 12:05 : Turbos at speed
Friday, February 28, 2014, 12:06: Vacuum at 1.7E-5 T
Monday, March 03, 2014, 09:28 : Vacuum leak on waterline (HS) still present. Stopping turbos for investigation.
Tuesday, March 04, 2014, 09:58: Venting
Replaced Cu-gaskets with Parker SST gaskets.
Tuesday, March 04, 2014, 11:03: Roughing
Tuesday, March 04, 2014, 11:26: Starting Turbos
Tuesday, March 04, 2014, 11:35: Turbos at speed. (TP1A timed out once)
Tuesday, March 04, 2014, 11:36: Vacuum at 1.6E-5 T
Thursday, March 06, 2014, 08:21: Vacuum leak no waterline (HS) still present. Stopping turbos. |
Friday, March 07, 2014, 11:38, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP2 stopped over night
|
See fault report 7240
Tuesday, March 11, 2014, 09:04: Stopping TMS:TP6. Vacuum at 9.7E-6 T.
Wednesday, March 12, 2014, 10:22: Venting TMS section for TP2 replacement.
Edi replaced TP2
Wednesday, March 12, 2014, 15:36: Roughing TMS section.
Wednesday, March 12, 2014, 15:45: Starting turbos.
Wednesday, March 12, 2014, 15:49: Turbos at speed. Vacuum at 3.6E-5 T.
Wednesday, March 12, 2014, 15:55: Vacuum at 1.5E-5 T. |
Tuesday, March 11, 2014, 09:03, Anders Mjos, , , , , , , Problems/Solutions, Leak on water line for Heat Shield
|
Tuesday, March 11, 2014, 09:03: Venting to investigate |
Wednesday, March 12, 2014, 10:20, Rick Maharaj, , , , , , , Done, replace heatshield waterline loop
|
A new Heatshield waterline loop was manufactured and installed to replace the old one which had a leak.
Chamber vacuum currently being roughed down.
Wednesday, March 12, 2014, 10:41: Started turbos.
Wednesday, March 12, 2014, 10:5:0 Turbos at speed. TP1A timed out once.
Wednesday, March 12, 2014, 10:51: Vacuum at 2.6E-5 T.
By AM
Thursday, March 13, 2014, 10:20: Opened water. Vacuum stable at 9.3E-7 T.
Venting chamber to investigate slow pump down.
Thursday, March 13, 2014, 10:21: Stopped turbos.
Thursday, March 13, 2014, 11:15: Venting
By RM
HS loop wiped with methanol, door seals wiped.
Thursday, March 13, 2014, 11:47: Pump down Started
Thursday, March 13, 2014, 12:05: Turbos started
Thursday, March 13, 2014, 12:09: TP1B at speed
Thursday, March 13, 2014, 12:12: TP1A at speed
Thursday, March 13, 2014, 12:13: IG1 turned on Vacuum at 7.2E-06
By AM
Monday, March 17, 2014, 12:55 : Stopped turbos. Vacuum at 2.4E-7 T.
Monday, March 17, 2014, 17:39: Venting
|
Friday, March 21, 2014, 13:55, Anders Mjos, , , , , , , In progress, Pumping down empty chamber
|
Roughing
Friday, March 21, 2014, 13:59: Starting turbos
Friday, March 21, 2014, 14:08: Turbos at speed
Friday, March 21, 2014, 14:09: Vacuum at 7.5 E-6T |
Friday, March 21, 2014, 14:12, Anders Mjos, , , , , , , Problems/Solutions, Elevated backing pressure on ISAC Test Stand TMS:RP2
|
The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.
E-fault 7258.
|
Wednesday, April 23, 2014, 09:37, Anders Mjos, , , , , , , Problems/Solutions, Started Sources archiver
|
The archiver was not running |
Wednesday, April 23, 2014, 14:16, Anders Mjos, , , , , , , Done, Cu-strip cleaning test - sample #1, not cleaned
|
Wednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34 : Starting turbos
Wednesday, April 23, 2014, 14:42 : Turbos at speed
Wednesday, April 23, 2014, 14:44 : Vacuum at 8.3E-6 T
Thursday, April 24, 2014, 09:12: Opened water for HS loop. Vacuum stable at1.6E-7 T
Thursday, April 24, 2014, 09:25: Started heating TGHT to 580A at 2A/min
Thursday, April 24, 2014, 14:07: Aborted autoramping. Cu-strip glowing. Started Target Cooldown.
Monday, April 28, 2014, 08:36: Stopped turobs. Vacuum at 1.2E-7 T |
Monday, April 28, 2014, 10:23, Anders Mjos, , , , , , , In progress, Cu-strip cleaning test - sample #2, cleaned
|
Monday, April 28, 2014, 10:23: Started roughing
Monday, April 28, 2014, 10:48: Started turbos. CG1 at ~0.3 T
Monday, April 28, 2014, 10:56 : Turbos at speed
Monday, April 28, 2014, 10:58 : Vacuum at 7.2E-6 T
Tuesday, April 29, 2014, 09:15: Vacuum over night was somewhat erratic with a couple of excursions. Venting to redo door seal and inspect chamber.
Tuesday, April 29, 2014, 13:18: Venting
Aborted venting.
Wednesday, April 30, 2014, 10:15: Vented. Cleaned front door o-ring and groove. Inspected VCR joint on HS water loop. No visible issues.
Wednesday, April 30, 2014, 10:15: Roughing
Wednesday, April 30, 2014, 10:35 : Starting turbos
Wednesday, April 30, 2014, 10:44 : Turbos at speed
Wednesday, April 30, 2014, 10:45 : Vacuum at 6.5E-6 T
Thursday, May 01, 2014, 08:44: Vacuum erratic over night. Small burst of pressure increase in vacuum with ~2 hours intervals. Leak found on HS cooling circuit by purging the water line.
Thursday, May 01, 2014, 08:46: Stopping turbos. Vacuum at 2.7E-7 T
HS water line should be purged again before breaking VCR seal.
Thursday, May 01, 2014, 09:59: Venting
Thursday, May 01, 2014, 10:45: Removed HS loop.
Thursday, May 01, 2014, 10:45: Roughing
Thursday, May 01, 2014, 11:11: Starting turbos. CG1 ~ 0.1 T
Thursday, May 01, 2014, 11:19: Turbos at speed
Thursday, May 01, 2014, 11:21 : Vacuum at 5.2E-6 T
Monday, May 12, 2014, 10:03 : Turbos stopped. Vacuum at 1.22 E-7 T
Monday, May 12, 2014, 13:34: Venting
|
|