219
|
Wednesday, October 03, 2012, 13:50 |
Aurelia Laxdal | | HP-FEBIAD | | | | | In progress | Training updates | On Monday October 1, the HP-FEBIAD source
was turned ON again, to complete the operator
training. The last session was yesterday |
|
|
220
|
Wednesday, October 10, 2012, 10:47 |
Friedhelm Ames | | | | | | | Failed | found teststand tripped off | turbo pumps in source section and all ion
gauges off all optics and heaters tripped.
Reason unknown. |
|
|
221
|
Wednesday, October 10, 2012, 17:35 |
Aurelia Laxdal | | | | | | | Failed | found teststand tripped off |
|
|
|
222
|
Thursday, October 25, 2012, 11:13 |
Anders Mjos | Test | HP-FEBIAD | | | | | In progress | Venting chamber for installation of TiC#3 | Thursday, October 25, 2012, 11:11: Vacuum
at 1.3E-7 T
Thursday, October 25, 2012, 11:12: |
|
|
223
|
Thursday, October 25, 2012, 13:02 |
Anders Mjos | TiC#3 | LP-SIS | ITW | TM1 | | | In progress | Pumping down | Thursday, October 25, 2012, 13:00: Roughing
Thursday, October 25, 2012, 13:19
: Turbos on |
|
|
224
|
Friday, October 26, 2012, 08:29 |
Anders Mjos | TiC#3 | LP-SIS | ITW | TM1 | | | Done | Target ready for conditioning |
|
|
|
225
|
Thursday, November 01, 2012, 11:16 |
Aurelia Laxdal | TiC#3 | LP-SIS | ITW | TM1 | | | | TiC#3-LP-SIS Startup | Did the HV conditioning for the TiC#3 up
to 30kV.
Heaters ramp up in progress. |
|
|
226
|
Thursday, November 01, 2012, 14:57 |
Aurelia Laxdal | TiC#3 | LP-SIS | ITW | TM1 | | | | TSH:TGHT readback stopped at 264.5A (for a higher setpoint) | The TSH:TGHT stopped at 263.7A, but the
setpoint is still ramping (now at 421A).
The voltage is set correctly: have 6.238V |
|
|
227
|
Friday, November 02, 2012, 14:20 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | | Mass scan done |
Normal
0
false
false
false
|
|
|
228
|
Friday, November 02, 2012, 15:40 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | SiC#3 cooldown started | Started the cooldown for SiC#3. |
|
|
229
|
Monday, November 05, 2012, 09:47 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | TPS optics cannot be turned off. | All TPS optics, with the exception of TPS:Q4
cannot be turned off. E-Fault#6395 for Controls.
Same for the TSG optics: CB1, VCB1 |
|
|
230
|
Monday, November 05, 2012, 13:26 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | Venting the Test Stand | Venting the Test Stand.
TiC#3 will be ready to be removed
in few minutes. |
|
|
231
|
Monday, November 05, 2012, 14:41 |
Anders Mjos | TiC#3 | LP-SIS | ITW | TM1 | | | Done | Target Removed | Target looks OK. The right leg was a bit
much out of center and will be adjusted in
the lab. |
|
|
232
|
Monday, November 05, 2012, 14:42 |
Anders Mjos | Test SiC | HP-FEBIAD | | | | | Done | Pumping down | Monday, November 05, 2012, 14:41: Roughing
Monday, November 05, 2012, 14:58:
Started turbos |
|
|
233
|
Monday, November 19, 2012, 10:20 |
Aurelia Laxdal | Test-SiC | HP-FEBIAD | | | | | | Preparations for E-Fault#6389 investigations | Prepared the Test Stand for Controls to
investigate E-Fault#6389.
|
|
|
234
|
Thursday, November 22, 2012, 12:52 |
Aurelia Laxdal | Test-SiC | HP-FEBIAD | | | | | | E-Fault#6389 re-directed to PS | Evgeniy and Kazuya investigated the problem
with TSH:TGHT readbacks and they came to
the conclusion that the PS is faulty, and |
|
|
235
|
Thursday, November 29, 2012, 14:15 |
Anders Mjos | | | | | | | In progress | Venting in preparation for RFQ work | Thursday, November 29, 2012, 14:15:
Stopping turbos
Thursday, November 29, 2012, 15:57: |
|
|
236
|
Thursday, November 29, 2012, 16:21 |
Anders Mjos | | | | | | | | Pumping down | Thursday, November 29, 2012, 16:21: Roughing |
|
|
237
|
Friday, November 30, 2012, 10:42 |
Anders Mjos | | | | | | | | Venting | |
|
|
238
|
Friday, November 30, 2012, 12:04 |
Anders Mjos | | | | | | | In progress | 9-pin connector installation work in progress | in preparation for RFQ testing. By Sebastian
and Anders
An insulated 9-pin D-sub connector |
|