ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject
  219   Wednesday, October 03, 2012, 13:50 Aurelia Laxdal HP-FEBIAD    In progressTraining updates

On Monday October 1, the HP-FEBIAD source was turned ON again, to complete the operator training. The last session was yesterday and for the time being the ISAC operators can play with the source when time allows, and from the ISAC Control room. For this purpose the source will be kept on this week and also over the week-end.

  220   Wednesday, October 10, 2012, 10:47 Friedhelm Ames      Failedfound teststand tripped off

turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.

  221   Wednesday, October 10, 2012, 17:35 Aurelia Laxdal      Failedfound teststand tripped off

Friedhelm Ames wrote:

turbo pumps in source section and all ion gauges off all optics and heaters tripped. Reason unknown.

 Checked the Archiver and the striptool: TSG:TP1A & TP1B tripped on Oct. 10, at 7:53am. Both pumps showed timeout, but the AC breakers were not tripped. Also, checked with MCR: they were no power bumps or cooling water problems around that time. 

Discussed it with Kazuya Negishi from Controls: there were no PLC problems. Kazuya and I would monitor the trips. 

  222   Thursday, October 25, 2012, 11:13 Anders MjosTestHP-FEBIAD    In progressVenting chamber for installation of TiC#3

Thursday, October 25, 2012, 11:11: Vacuum at 1.3E-7 T

Thursday, October 25, 2012, 11:12: Turbos off

Thursday, October 25, 2012, 11:50: Venting

  223   Thursday, October 25, 2012, 13:02 Anders MjosTiC#3LP-SISITWTM1  In progressPumping down

Thursday, October 25, 2012, 13:00: Roughing

Thursday, October 25, 2012, 13:19 : Turbos on

Thursday, October 25, 2012, 13:28 : Turbos at speed

Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T

  224   Friday, October 26, 2012, 08:29 Anders MjosTiC#3LP-SISITWTM1  DoneTarget ready for conditioning

Anders Mjos wrote:

Thursday, October 25, 2012, 13:00: Roughing

Thursday, October 25, 2012, 13:19 : Turbos on

Thursday, October 25, 2012, 13:28 : Turbos at speed

Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T

 Friday, October 26, 2012, 08:29: Opened water. Vacuum stable at 1.8E-7 T

  225   Thursday, November 01, 2012, 11:16 Aurelia LaxdalTiC#3LP-SISITWTM1   TiC#3-LP-SIS Startup

Did the HV conditioning for the TiC#3 up to 30kV.

Heaters ramp up in progress.

  226   Thursday, November 01, 2012, 14:57 Aurelia LaxdalTiC#3LP-SISITWTM1   TSH:TGHT readback stopped at 264.5A (for a higher setpoint)

The TSH:TGHT stopped at 263.7A, but the setpoint is still ramping (now at 421A). The voltage is set correctly: have 6.238V setpoint and 4.386V readback. The reading on the Power Supply shows 418A. Through the window the target assembly looks at high temperature. The readback on Epics seems stuck. E-Fault for Controls 6389

  227   Friday, November 02, 2012, 14:20 Aurelia Laxdal LP-SISITWTM1   Mass scan done

Mass scan file: plotdump-local-clean.txt Nov2 12 13-15-59.txt

The scan was taken at TGHT=573A (read from the PS panel) .

The TBHT = 230A

  228   Friday, November 02, 2012, 15:40 Aurelia Laxdal LP-SISITWTM1  DoneSiC#3 cooldown started

Started the cooldown for SiC#3.

  229   Monday, November 05, 2012, 09:47 Aurelia Laxdal LP-SISITWTM1  DoneTPS optics cannot be turned off.

All TPS optics, with the exception of TPS:Q4 cannot be turned off. E-Fault#6395 for Controls.

Same for the TSG optics: CB1, VCB1 and CBC.

Talked to Evgeniy and Kazuya. Optics are OFF now.

  230   Monday, November 05, 2012, 13:26 Aurelia Laxdal LP-SISITWTM1  DoneVenting the Test Stand

Venting the Test Stand.

TiC#3 will be ready to be removed in few minutes. 

Please note: water is still ON.

  231   Monday, November 05, 2012, 14:41 Anders MjosTiC#3LP-SISITWTM1  DoneTarget Removed

Target looks OK. The right leg was a bit much out of center and will be adjusted in the lab.

The torque required to loosen the bolts were measured (from left to right):

Target legs: 48 and 30 in lbs

Tube htr: 25, 30 and 25 in lbs

  232   Monday, November 05, 2012, 14:42 Anders MjosTest SiCHP-FEBIAD    DonePumping down

Monday, November 05, 2012, 14:41: Roughing

Monday, November 05, 2012, 14:58: Started turbos

Monday, November 05, 2012, 15:06 : Turbos at speed

Monday, November 05, 2012, 15:068: Vacuum at 2.2E-5 T

Wednesday, November 07, 2012, 08:26: Cooling water open. Vacuum stable at 1.8E-7 T

  233   Monday, November 19, 2012, 10:20 Aurelia LaxdalTest-SiCHP-FEBIAD     Preparations for E-Fault#6389 investigations

Prepared the Test Stand for Controls to investigate E-Fault#6389.


Evgeniy increased the current limit on the power supply TSH:TGHT from 2 rotations to 7 rotations, after talking to Ray Dube.

I turned on the HV at 30kV and started the Auto-ramping.

  234   Thursday, November 22, 2012, 12:52 Aurelia LaxdalTest-SiCHP-FEBIAD     E-Fault#6389 re-directed to PS

Evgeniy and Kazuya investigated the problem with TSH:TGHT readbacks and they came to the conclusion that the PS is faulty, and the PLC reads correctly the signal sent by the PS.  Kazuya is redirecting the E-Fault from Controls to PS.

Ray Dube estimated few weeks (4-6) to send the PS offsite for repairs. This needs to be scheduled. For the time being, one can use the Test Stand with the PS setpoints, displayed on its front panel, as a reference.

  235   Thursday, November 29, 2012, 14:15 Anders Mjos      In progressVenting in preparation for RFQ work

 Thursday, November 29, 2012, 14:15: Stopping turbos

Thursday, November 29, 2012, 15:57: Venting

  236   Thursday, November 29, 2012, 16:21 Anders Mjos       Pumping down

Thursday, November 29, 2012, 16:21: Roughing

  237   Friday, November 30, 2012, 10:42 Anders Mjos       Venting
  238   Friday, November 30, 2012, 12:04 Anders Mjos      In progress9-pin connector installation work in progress

in preparation for RFQ testing. By Sebastian and Anders

An insulated  9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target assembly was placed in the upper slot on the source tray.

Friday, November 30, 2012, 14:57: Rouging in preparation for leak check (next week).

Friday, November 30, 2012, 15:16: Turbos on

Friday, November 30, 2012, 15:25 : Turbos at speed

Friday, November 30, 2012, 15:26 : Vacuum at 3.4E-5 T