235
|
Thursday, November 29, 2012, 14:15 |
Anders Mjos | | | | | | | In progress | Venting in preparation for RFQ work | Thursday, November 29, 2012, 14:15:
Stopping turbos
Thursday, November 29, 2012, 15:57: |
|
236
|
Thursday, November 29, 2012, 16:21 |
Anders Mjos | | | | | | | | Pumping down | Thursday, November 29, 2012, 16:21: Roughing |
|
237
|
Friday, November 30, 2012, 10:42 |
Anders Mjos | | | | | | | | Venting | |
|
238
|
Friday, November 30, 2012, 12:04 |
Anders Mjos | | | | | | | In progress | 9-pin connector installation work in progress | in preparation for RFQ testing. By Sebastian
and Anders
An insulated 9-pin D-sub connector |
|
239
|
Monday, December 03, 2012, 15:33 |
Anders Mjos | | | | | | | In progress | Leak check of 9-pin feed through | Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin
feed through. |
|
240
|
Tuesday, December 04, 2012, 11:05 |
Anders Mjos | | | | | | | | Vented | In preparation for RFQ target and leak
troubleshooting.
Tuesday, December 04, 2012, 11:04: |
|
242
|
Wednesday, December 05, 2012, 11:18 |
Anders Mjos | | | | | | | In progress | Leak checking 9-pin feed through | Vacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background. |
|
243
|
Thursday, December 06, 2012, 08:41 |
Anders Mjos | | | | | | | | Opened cooling water | Vacuum stable at 2.8E-7 T |
|
244
|
Tuesday, December 11, 2012, 13:27 |
Sebastian Raeder | | | | | | | | 9 PIN connector | A Sub D 9 Pin connector on a HV insulator
was installed on Port Q of the target box
at the teststand. The insulator is leak tested |
|
247
|
Thursday, December 13, 2012, 14:38 |
Anders Mjos | | | | | | | | Pumping down empty chamber | Thursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56
: Starting turbos |
|
252
|
Tuesday, December 18, 2012, 12:51 |
Sebastian Raeder | | | | | | | | Anode powersupply connected to HV-common | The anode PS is turned off and connected
to HV common.
the Target is connected to a -18V |
|
254
|
Wednesday, December 19, 2012, 09:44 |
Sebastian Raeder | | | | | | | In progress | venting | venting and inspect the target
Wednesday, December 19, 2012, 09:43:
vqacuum at 1.9E-7T, stop turbos |
|
255
|
Wednesday, December 19, 2012, 11:24 |
Anders Mjos | | | | | | | Problems/Solutions | Restarted turbos in TMS section after power bump | Sources arch restared |
|
256
|
Wednesday, December 19, 2012, 16:22 |
Sebastian Raeder | | | | | | | Problems/Solutions | status after power outage | Wednesday, December 19, 2012, 16:24:
After long power outage, everything
is off except the roughing pumps. Two turbo |
|
257
|
Thursday, December 20, 2012, 14:19 |
Anders Mjos | | | | | | | | Power down for holidays | |
|
258
|
Thursday, January 03, 2013, 08:33 |
Anders Mjos | | | | | | | Problems/Solutions | Started archivers after holiday shut down | Started archivers. Controls whited out. |
|
259
|
Thursday, January 03, 2013, 11:39 |
Anders Mjos | | | | | | | Problems/Solutions | Starting pumps after holiday shut down - TMSRP2 replaced | Thursday,
January 03, 2013, 11:28: TMSRP2 is noisy.
Stopped. |
|
260
|
Friday, January 04, 2013, 10:52 |
Anders Mjos | | | | | | | In progress | Preparing for venting | Friday, January 04, 2013, 10:51:
Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52: |
|
268
|
Monday, January 14, 2013, 18:18 |
Friedhelm Ames | | | | | | | | TMS:CBC1 not working | The optics at the teststand has been switched
on, but TMS:CBC1 is not working. A fault
report has been send to controls. |
|
275
|
Friday, January 18, 2013, 15:57 |
Anders Mjos | | | | | | | Problems/Solutions | Conductor bolts to be replaced | After the last test at the test stand,
one of the conductor bolts (ITD0058) is damaged.
To prevent damage to the thread inserts, |
|