Entry  Thursday, November 29, 2012, 14:15, Anders Mjos, , , , , , , In progress, Venting in preparation for RFQ work 
 Thursday, November 29, 2012, 14:15: Stopping turbos
Thursday, November 29, 2012, 15:57: Venting
Entry  Thursday, November 29, 2012, 16:21, Anders Mjos, , , , , , , , Pumping down 
Thursday, November 29, 2012, 16:21: Roughing
Entry  Friday, November 30, 2012, 10:42, Anders Mjos, , , , , , , , Venting 
 
Entry  Friday, November 30, 2012, 12:04, Anders Mjos, , , , , , , In progress, 9-pin connector installation work in progress 
in preparation for RFQ testing. By Sebastian and Anders
An insulated  9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target
assembly was placed in the upper slot on the source tray.
Entry  Monday, December 03, 2012, 15:33, Anders Mjos, , , , , , , In progress, Leak check of 9-pin feed through 
Base leak rate 6 - 7 E-9 mbar-l/s
A leak was found around the 9-pin feed through.
Entry  Tuesday, December 04, 2012, 11:05, Anders Mjos, , , , , , , , Vented 
In preparation for RFQ target and leak troubleshooting.
Tuesday, December 04, 2012, 11:04: Turbos off (vacuum at 3.8E-7 T)
Water lines purged.
Entry  Wednesday, December 05, 2012, 11:18, Anders Mjos, , , , , , , In progress, Leak checking 9-pin feed through 
Vacuum at 4.4E-7T
Base leak rate 2 - 3 E-9 mbar-l/sec
No response above background.
Entry  Thursday, December 06, 2012, 08:41, Anders Mjos, , , , , , , , Opened cooling water 
Vacuum stable at 2.8E-7 T
Entry  Tuesday, December 11, 2012, 13:27, Sebastian Raeder, , , , , , , , 9 PIN connector 
A Sub D 9 Pin connector on a HV insulator was installed on Port Q of the target box at the teststand. The insulator is leak tested and OK, vacuum is
below 2E-7 T
The feed through is connected (1to1) to the upper 9 Pin connector of the target tray. Since the existing upper 9 Pin connector was damaged from
Entry  Thursday, December 13, 2012, 14:38, Anders Mjos, , , , , , , , Pumping down empty chamber 
Thursday, December 13, 2012, 14:36: Roughing
Thursday, December 13, 2012, 14:56 : Starting turbos
Thursday, December 13, 2012, 15:05 : turbos at speed
Entry  Tuesday, December 18, 2012, 12:51, Sebastian Raeder, , , , , , , , Anode powersupply connected to HV-common 
The anode PS is turned off and connected to HV common.
the Target is connected to a -18V PS at the center support (Feed through A) for a on/off test of ion suppression
NOTE: there is a shortcut target <--> HV gnd, most propably due to the thermocouple touching something after pumping.
Entry  Wednesday, December 19, 2012, 09:44, Sebastian Raeder, , , , , , , In progress, venting 
venting and inspect the target
Wednesday, December 19, 2012, 09:43: vqacuum at 1.9E-7T, stop turbos
Entry  Wednesday, December 19, 2012, 11:24, Anders Mjos, , , , , , , Problems/Solutions, Restarted turbos in TMS section after power bump 
Sources arch restared
Entry  Wednesday, December 19, 2012, 16:22, Sebastian Raeder, , , , , , , Problems/Solutions, status after power outage 
Wednesday, December 19, 2012, 16:24:
After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only
TSGTP1B could be reset, while TMSTP2 is still showing this fault
Entry  Thursday, December 20, 2012, 14:19, Anders Mjos, , , , , , , , Power down for holidays 
 
Entry  Thursday, January 03, 2013, 08:33, Anders Mjos, , , , , , , Problems/Solutions, Started archivers after holiday shut down 
Started archivers. Controls whited out.
Entry  Thursday, January 03, 2013, 11:39, Anders Mjos, , , , , , , Problems/Solutions, Starting pumps after holiday shut down - TMSRP2 replaced 
Thursday, January 03, 2013, 11:28: TMSRP2 is noisy. Stopped.
Roughing pump inspected by Vacuum group. Will be replaced later today. See e-fault 6516
Thursday, January 03, 2013, 11:29: TSGRP1 Started
Entry  Friday, January 04, 2013, 10:52, Anders Mjos, , , , , , , In progress, Preparing for venting 
 Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T
Friday, January 04, 2013, 10:52: Turbos stopped
Friday, January 04, 2013, 13:50: Venting
Entry  Monday, January 14, 2013, 18:18, Friedhelm Ames, , , , , , , , TMS:CBC1 not working 
The optics at the teststand has been switched on, but TMS:CBC1 is not working. A fault report has been send to controls.
Entry  Friday, January 18, 2013, 15:57, Anders Mjos, , , , , , , Problems/Solutions, Conductor bolts to be replaced Model.jpgdamaged_bolt.JPG
After the last test at the test stand, one of the conductor bolts (ITD0058) is damaged. To prevent damage to the thread inserts, all conductor bolts
will be replaced with new ones.