  Test-Stand, Page 23 of 53  Not logged in ELOG logo
ID Date Author Target/No.#down Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  235   Thursday, November 29, 2012, 14:15 Anders Mjos      In progressVenting in preparation for RFQ work

 Thursday, November 29, 2012, 14:15: Stopping turbos

Thursday, November 29, 2012, 15:57: Venting

  236   Thursday, November 29, 2012, 16:21 Anders Mjos       Pumping down

Thursday, November 29, 2012, 16:21: Roughing

  237   Friday, November 30, 2012, 10:42 Anders Mjos       Venting
  238   Friday, November 30, 2012, 12:04 Anders Mjos      In progress9-pin connector installation work in progress

in preparation for RFQ testing. By Sebastian and Anders

An insulated  9-pin D-sub connector was installed on the service cap in port Q (as labeled in ISK4523). The connector mating to the target assembly was placed in the upper slot on the source tray.

Friday, November 30, 2012, 14:57: Rouging in preparation for leak check (next week).

Friday, November 30, 2012, 15:16: Turbos on

Friday, November 30, 2012, 15:25 : Turbos at speed

Friday, November 30, 2012, 15:26 : Vacuum at 3.4E-5 T

  239   Monday, December 03, 2012, 15:33 Anders Mjos      In progressLeak check of 9-pin feed through

Base leak rate 6 - 7 E-9 mbar-l/s

A leak was found around the 9-pin feed through.

  240   Tuesday, December 04, 2012, 11:05 Anders Mjos       Vented

In preparation for RFQ target and leak troubleshooting.

Tuesday, December 04, 2012, 11:04: Turbos off (vacuum at 3.8E-7 T)

Water lines purged.

Tuesday, December 04, 2012, 15:03: Venting

Tuesday, December 04, 2012, 15:32 : Vented

  242   Wednesday, December 05, 2012, 11:18 Anders Mjos      In progressLeak checking 9-pin feed through

Vacuum at 4.4E-7T

Base leak rate 2 - 3 E-9 mbar-l/sec

No response above background.

  243   Thursday, December 06, 2012, 08:41 Anders Mjos       Opened cooling water

Vacuum stable at 2.8E-7 T

  244   Tuesday, December 11, 2012, 13:27 Sebastian Raeder       9 PIN connector

A Sub D 9 Pin connector on a HV insulator was installed on Port Q of the target box at the teststand. The insulator is leak tested and OK, vacuum is below 2E-7 T

The feed through is connected (1to1) to the upper 9 Pin connector of the target tray. Since the existing upper 9 Pin connector was damaged from a previous FEBIAD test, this connector was replaced. For wiring 4 twisted pair Capton insulated and shielded wires (identical to ITE and TM4) of about 50cm length are used.

 

View on top of the feedthrough and the connector on the source tray (male connectors)

     __________________

    \    1     2      3      4      5   /

      \     6      7     8      9    /

          ----------------------  

1to1 connection for pins 1,2,4-9

Pin 3 is NOT CONNCTED

The pin pairs 1&2, 4&5, 6&7, 8&9 each use a line of twisted pairs

 

Monday, December 17, 2012, 22:21

Connection to the HV added. The wires end in the HV cage on a screw terminal with labels 1--12. The numbers 1,2,4-9 are used in corresponding notation to the sketch above. Since 3 is not connected at all this terminal is used for grounding the wire shielding.

As cable 2 Capton isolated pairs of wire (1&2, 4&5) and two "normal" pairs for thermocouple (6&7, 8&9) reading are used. So all connections have shielded twisted pair cable, while  (6&7, 8&9)change the cable type at the 9Pin connector

  247   Thursday, December 13, 2012, 14:38 Anders Mjos       Pumping down empty chamber

Thursday, December 13, 2012, 14:36: Roughing

Thursday, December 13, 2012, 14:56 : Starting turbos

Thursday, December 13, 2012, 15:05 : turbos at speed

Thursday, December 13, 2012, 15:06 : vacuum at 2.3E-5 T

 

  252   Tuesday, December 18, 2012, 12:51 Sebastian Raeder       Anode powersupply connected to HV-common

The anode PS is turned off and connected to HV common.

the Target is connected to a -18V PS at the center support (Feed through A) for a on/off test of ion suppression

NOTE: there is a shortcut target <--> HV gnd, most propably due to the thermocouple touching something after pumping.

workaround to obtain suppression for today is to put in a differnt driver for the RFQ which can be biased to positive potential.

  254   Wednesday, December 19, 2012, 09:44 Sebastian Raeder      In progressventing

venting and inspect the target

Wednesday, December 19, 2012, 09:43: vqacuum at 1.9E-7T, stop turbos

  255   Wednesday, December 19, 2012, 11:24 Anders Mjos      Problems/SolutionsRestarted turbos in TMS section after power bump

Sources arch restared

  256   Wednesday, December 19, 2012, 16:22 Sebastian Raeder      Problems/Solutionsstatus after power outage

Wednesday, December 19, 2012, 16:24:

After long power outage, everything is off except the roughing pumps. Two turbo pumps (TMSTP2 and TSGTP1B) have shown fault due to timeout, only TSGTP1B could be reset, while TMSTP2 is still showing this fault

Vacuum in Magnet section is 0.004T according to TMSCG2. Since the target chamber was vented to remove the RFQ tests target, this section is actually pumped down using the roughing pumps (water lines are blanked off)

archivers started

Wednesday, December 19, 2012, 21:43

I was now able to reset TMSTP2.

closed the roughing pumps to the target chamber, vacuum at 0.027T

  257   Thursday, December 20, 2012, 14:19 Anders Mjos       Power down for holidays
  258   Thursday, January 03, 2013, 08:33 Anders Mjos      Problems/SolutionsStarted archivers after holiday shut down

Started archivers. Controls whited out.

  259   Thursday, January 03, 2013, 11:39 Anders Mjos      Problems/SolutionsStarting pumps after holiday shut down - TMSRP2 replaced

Thursday, January 03, 2013, 11:28: TMSRP2 is noisy. Stopped.

Roughing pump inspected by Vacuum group. Will be replaced later today. See e-fault 6516

Thursday, January 03, 2013, 11:29: TSGRP1 Started

Thursday, January 03, 2013, 11:29: TSGTP1A and 1B started

Thursday, January 03, 2013, 11:38 : TSGTP1A and B at speed

Thursday, January 03, 2013, 11:38 : Vacuum at 1.3E-5 T

TMSRP2 replaced

Thursday, January 03, 2013, 15:03: TMSTP2 and 6 started

Thursday, January 03, 2013, 15:07: TMSTP2 and 6 at speed

Thursday, January 03, 2013, 15:08: Vacuum at 5 E-5 T

  260   Friday, January 04, 2013, 10:52 Anders Mjos      In progressPreparing for venting

 Friday, January 04, 2013, 10:51: Vacuum at 3.2E-7 T

Friday, January 04, 2013, 10:52: Turbos stopped

Friday, January 04, 2013, 13:50: Venting

  268   Monday, January 14, 2013, 18:18 Friedhelm Ames       TMS:CBC1 not working

The optics at the teststand has been switched on, but TMS:CBC1 is not working. A fault report has been send to controls.

  275   Friday, January 18, 2013, 15:57 Anders Mjos      Problems/SolutionsConductor bolts to be replaced

After the last test at the test stand, one of the conductor bolts (ITD0058) is damaged. To prevent damage to the thread inserts, all conductor bolts will be replaced with new ones.