  175   Friday, August 17, 2012, 08:30 Pierre Bricault      In progressFEBIAD test with cathode biasedYesterday Ray Dube has changed the configuration
in order to run the FEBIAD with the cathode
on negative bias.
  
  176   Friday, August 17, 2012, 10:09 Pierre Bricault      In progressFEBIAD test cathode biasBacking pressure on the bender section
is quite large. TMSIG6 reads 5.09E-7 T and
TMS:CG2B reads 0.249 T!
  
  177   Friday, August 17, 2012, 12:53 Pierre Bricault      Done Test completed.
exel file on My Documents in folder
FEBIAD Test Aout2012/TestFEBIAD
 TestFEBIAD.xlsx 
  178   Thursday, August 23, 2012, 10:11 Anders Mjos      In progressVenting - installation of NiO#1Thursday, August 23, 2012, 10:10: Vacuum
2.1E-7
Thursday, August 23, 2012, 10:10:
  
  179   Thursday, August 23, 2012, 10:40 Anders Mjos      Problems/SolutionsReplaced TMSRP2Thursday, August 23, 2012, 10:40: Replacing
TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49:
  
  180   Thursday, August 23, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  In progressNiO#1 installedThursday, August 23, 2012, 11:38: NiO#1
installed.
Thursday, August 23, 2012, 11:38:
  
  181   Thursday, August 23, 2012, 11:59 Anders Mjos      Problems/SolutionsRoughing blows the fuse for both roughing pumps.The fuse for both roughing pumps blows
when roughing the chamber. With the help
from Edi: disconnect the exhaust port on
  
  182   Friday, August 24, 2012, 08:28 Anders MjosNiO#1HP-FEBIADITETM4  DoneNiO#1 installed

    

       
            
  
  183   Monday, August 27, 2012, 13:21 Aurelia LaxdalNiO#1HP-FEBIADITETM4  In progressHV conditioning at Test Stand Did HV conditioning up to TSG:BIAS=30kV,
TSH=EE=-600V
Turned off the HV for Kazuya to check
  
  184   Monday, August 27, 2012, 15:21 Aurelia Laxdal      In progressXantrex PS 10-600 for TSH:TGHT is not working When turned ON it was not going higher
than 3.6A (EPICS/front panel).  Kazuya checked
the connections at the back and also the
  
  185   Tuesday, August 28, 2012, 16:57 Aurelia Laxdal HP-FEBIADITETM4  In progressUpdates for NiO#1 at Test StandTested the power supplies and locked up
the HV cage.
Turned on the HV: 30kV.
  
  186   Wednesday, August 29, 2012, 11:34 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 heating startup & few checksFriedhelm checked the voltage across R4
from ISK4563D-rev2.pdf. It shows 50 kOhms
with the power supplies off and everything
  
  187   Thursday, August 30, 2012, 14:34 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 updates

Normal
0




false
false
false
  
  188   Thursday, August 30, 2012, 16:51 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 cooldown startedStarted the cooldown.   
  189   Friday, August 31, 2012, 10:19 Anders Mjos      Problems/SolutionsReplaced TMSRP2 (again)

    

       
            
  
  190   Friday, August 31, 2012, 11:12 Aurelia Laxdal HP-FEBIADITETM4  DoneFinished testing NiO#1Turned off the HV and the optics in the
first section. Couldn't turn off the optics
in the second section: left a message for
  
  191   Friday, August 31, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  DoneVenting vacuum chamber - source changeFriday, August 31, 2012, 11:39: Stopped
turbos.
Friday, August 31, 2012, 13:06: Venting.
  
  192   Friday, August 31, 2012, 13:59 Anders MjosNb#7LP-SISITWTM1  In progressNb#7 installedFriday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 :
starting turbos
  
  193   Tuesday, September 04, 2012, 08:11 Anders MjosNb#7LP-SISITWTM1  DoneNb#7 installed

    

       
            
  
  194   Thursday, September 06, 2012, 09:23 Friedhelm AmesNB#7       start high voltage and heaters   