  179   Thursday, August 23, 2012, 10:40 Anders Mjos      Problems/SolutionsReplaced TMSRP2Thursday, August 23, 2012, 10:40: Replacing
TMSRP2 with Edi. E-fault 6261.
Thursday, August 23, 2012, 10:49:
  
  180   Thursday, August 23, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  In progressNiO#1 installedThursday, August 23, 2012, 11:38: NiO#1
installed.
Thursday, August 23, 2012, 11:38:
  
  181   Thursday, August 23, 2012, 11:59 Anders Mjos      Problems/SolutionsRoughing blows the fuse for both roughing pumps.The fuse for both roughing pumps blows
when roughing the chamber. With the help
from Edi: disconnect the exhaust port on
  
  182   Friday, August 24, 2012, 08:28 Anders MjosNiO#1HP-FEBIADITETM4  DoneNiO#1 installed

    

       
            
  
  183   Monday, August 27, 2012, 13:21 Aurelia LaxdalNiO#1HP-FEBIADITETM4  In progressHV conditioning at Test Stand Did HV conditioning up to TSG:BIAS=30kV,
TSH=EE=-600V
Turned off the HV for Kazuya to check
  
  184   Monday, August 27, 2012, 15:21 Aurelia Laxdal      In progressXantrex PS 10-600 for TSH:TGHT is not working When turned ON it was not going higher
than 3.6A (EPICS/front panel).  Kazuya checked
the connections at the back and also the
  
  185   Tuesday, August 28, 2012, 16:57 Aurelia Laxdal HP-FEBIADITETM4  In progressUpdates for NiO#1 at Test StandTested the power supplies and locked up
the HV cage.
Turned on the HV: 30kV.
  
  186   Wednesday, August 29, 2012, 11:34 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 heating startup & few checksFriedhelm checked the voltage across R4
from ISK4563D-rev2.pdf. It shows 50 kOhms
with the power supplies off and everything
  
  187   Thursday, August 30, 2012, 14:34 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 updates

Normal
0




false
false
false
  
  188   Thursday, August 30, 2012, 16:51 Aurelia Laxdal HP-FEBIADITETM4  In progressNiO#1 cooldown startedStarted the cooldown.   
  189   Friday, August 31, 2012, 10:19 Anders Mjos      Problems/SolutionsReplaced TMSRP2 (again)

    

       
            
  
  190   Friday, August 31, 2012, 11:12 Aurelia Laxdal HP-FEBIADITETM4  DoneFinished testing NiO#1Turned off the HV and the optics in the
first section. Couldn't turn off the optics
in the second section: left a message for
  
  191   Friday, August 31, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  DoneVenting vacuum chamber - source changeFriday, August 31, 2012, 11:39: Stopped
turbos.
Friday, August 31, 2012, 13:06: Venting.
  
  192   Friday, August 31, 2012, 13:59 Anders MjosNb#7LP-SISITWTM1  In progressNb#7 installedFriday, August 31, 2012, 15:19: roughing
Friday, August 31, 2012, 15:39 :
starting turbos
  
  193   Tuesday, September 04, 2012, 08:11 Anders MjosNb#7LP-SISITWTM1  DoneNb#7 installed

    

       
            
  
  194   Thursday, September 06, 2012, 09:23 Friedhelm AmesNB#7       start high voltage and heaters   
  195   Friday, September 07, 2012, 12:11 Friedhelm AmesNB#7LP-SIS    In progressmass scan startedmass scan has been started after optimization
on 23Na
  
  196   Friday, September 07, 2012, 13:10 Friedhelm AmesNb#7     Donemass scan finishedmass scan is finished saved as 
 
  Normal

 0
  
  
  197   Friday, September 07, 2012, 14:34 Anders MjosNb#7LP-SISITWTM1  Problems/SolutionsInsulator ITD0342 overheated - swelling See attached photo  Nb#7_swelling_insulator.pdf 
  198   Tuesday, September 11, 2012, 13:13 Friedhelm AmesNb#7LP-SIS    In progressstart cool downstart cooldown. Found computer at teststand