Entry  Tuesday, February 26, 2013, 08:32, Anders Mjos, , , , , , , Problems/Solutions, TMSTP2 timeout / fault Vacuum_2013-02-26.PNG

Tuesday, February 26, 2013, 08:24: Started turbo

Tuesday, February 26, 2013, 08:24: Turbo timed out

e-fault 6585 submitted

Entry  Monday, March 04, 2013, 09:11, Anders Mjos, , , , , , , Problems/Solutions, Restarted turobos after planned power outage 

Started archivers

Started turbos

Switched on ion gauges

TMSTP2 out as per precious e-log entry (and e-fault 6585)

    Reply  Tuesday, March 19, 2013, 09:04, Anders Mjos, , , , , , , Problems/Solutions, Venting TMS section for replacement of TP2 by vacuum group 

 

Anders Mjos wrote:

Tuesday, February 26, 2013, 08:24: Started turbo

Tuesday, February 26, 2013, 08:24: Turbo timed out

e-fault 6585 submitted

 

Edi called to inform that he can replace the turbo today.

Tuesday, March 19, 2013, 09:03: Stopped TP6

Tuesday, March 19, 2013, 09:35: Venting

Tuesday, March 19, 2013, 09:48 : TMS section and backing line vented


The turbo pump has been replaced see

https://elog.triumf.ca/TIS/Test-Stand/284

Some heat marks were observed on the turbo pump that was replaced. Vacuum group took pictures.

 

Entry  Tuesday, March 19, 2013, 17:25, Sebastian Raeder, , , , , , , Problems/Solutions, new turbo installed 

Edi replaced the faulty turbo pump in the mass separator section.

Roughing and turbo started

vacuum @ 9E-7T after 2.5h

Entry  Tuesday, March 19, 2013, 19:13, Sebastian Raeder, , , , , , , Problems/Solutions, 9 Pin connector rewired to match wiring in TM4 

The 9 Pin connector was rewired in the ISAC teststand to match the wiring in TM4

The wiring from the connection board in the HV cage to the connector (view from the target unit onto module) is now the following

      ---------------------------

  \     4     8     9     7     6    /

    \      5      1     2      x   /

            -----------------

with the pairs of wires

1,2   (kapton wire twisted pair all way)

4,5  (kapton wire twisted pair all way)

6,7  (kapton wire twisted pair inside the vacuum chamber,  other twisted pair from top of vacuum chamber to HV cage)

8,9  (kapton wire twisted pair inside the vacuum chamber,  other twisted pair from top of vacuum chamber to HV cage)

 

 

___ for completeness the wiring on top of the vacuum chamber (view from top onto the feedthrough)

 

      ---------------------------

  \     1     2     x     4     5    /

    \      6      7     8      9   /

            -----------------

 

NOTE: with this rewiring the metal screws on the PEEK 9Pin connector have been grounded using Ta foil

 

Thursday, March 21, 2013: there was a short in one of the lines  - most probably due to a shielding strand into the connector, has been resolved by fixation of the shielding in a position further away with Cu wire

 

Entry  Monday, March 25, 2013, 16:50, Sebastian Raeder, , , , , , , Problems/Solutions, RFQ powersupplies removed - Anode PS still connected to ground 

The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.

 

NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off

Entry  Thursday, March 28, 2013, 13:55, Anders Mjos, Empty, , , , , , In progress, Pumping down empty chamber 

Thursday, March 28, 2013, 13:55: Roughing

Thursday, March 28, 2013, 14:36: Starting turbos (vacuum at ~0.100 T)

Thursday, March 28, 2013, 14:44: Both turbos at speed

Thursday, March 28, 2013, 14:46: Vacuum at 5.2E-6 Torr

Entry  Tuesday, April 02, 2013, 15:19, Anders Mjos, , , , , , , Problems/Solutions, Water leak at MB1 Power Supply 

See Cyclotron e-fault 6637

 

    Reply  Tuesday, April 09, 2013, 16:21, Anders Mjos, , , , , , , Problems/Solutions, Water leak at MB1 Power Supply 

 

Anders Mjos wrote:

See Cyclotron e-fault 6637

 

 

Tuesday, April 09, 2013:

 Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.

Wednesday, April 10, 2013:

Removed the remaining water in the P/S rack.

    Reply  Thursday, April 11, 2013, 08:49, Anders Mjos, , , , , , , Problems/Solutions, MB1 Power Supply operational 

 

Anders Mjos wrote:

 

Anders Mjos wrote:

See Cyclotron e-fault 6637

 

 

Tuesday, April 09, 2013:

 Water leak has been repaired, but P/S could not be turned on. Ground interlock still latched. The base of the cabinet was filled with water - most of the water could be scooped out with a bucket.

Wednesday, April 10, 2013:

Removed the remaining water in the P/S rack.

Thursday, April 10, 2013:

The power supply is again operational. See e-fault entry above for details.

Entry  Tuesday, April 16, 2013, 08:59, Anders Mjos, , , , , , , Problems/Solutions, TMS:TP2 found in timeout / fault state TMS-TP2_Fault.pngTMS-IG6-RDVAC.png

Tuesday, April 16, 2013, 08:59

The turbo was found in fault state this morning. Based on data from IG6 the pump stopped around midnight.

An attempt to restart the pump will be made after the conditioning of Ta#40 is complete later today.

The TP has recently been replaced:

https://elog.triumf.ca/TIS/Test-Stand/280


Tuesday, April 16, 2013, 16:23: TMS:TP2 restarted I=1.0A P=21W T=29C @ 42kRPM


Wednesday, April 17, 2013, 16:19: TMS:TP2 I=0.8A P=14W T=29C @ 42kRPM

Entry  Thursday, April 25, 2013, 13:32, Anders Mjos, Empty, LP-FEBIAD, , , Tube Only, 38307-9 , In progress, FEBIAD Coil test 2014-04-30_FEBIAD_COIL_AWG18.PNG2014-05-01_FEBIAD_COIL_AWG18.PNGTarget_Assembly.pdf

Same target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106

Thursday, April 25, 2013, 13:54: Roughing

Thursday, April 25, 2013, 14:25: Started turbos 

Thursday, April 25, 2013, 14:33: Turbos at speed

Thursday, April 25, 2013, 14:33: Vacuum at 8.8E-6 T


Friday, April 26, 2013, 08:25: Cooling water supply opened. Vacuum stable at 2.2E-7 T

Friday, April 26, 2013, 13:35: Gas lines evacuated.

Testing Coil current vs Temperature before heating

COIL:RDCUR at 1.95A
COIL:RDVOL at 1.47V
COIL T/C at 86 deg C and still slowly increasing


Tuesday, April 30, 2013

Testing Coil current vs Temperature before heating

COIL:RDCUR at 3.96A

COIL:RDVOL 3.2 V Vacuum starts to increase (base 1.4E-7

COIL:RDVOL 3.8 V T/C at 150 C vacuum at 5E-7

COIL:RDCUR at 3.47A to reduce out-gassing T/C at 175 C

Tuesday, April 30, 2013, 12:39

COIL:RDCUR at 3.96A T/C 225 C

COIL:RDVOL 5.0 V T/C at 250 C vacuum at 6.2E-7

Tuesday, April 30, 2013, 13:00

COIL:RDCUR at 4.25A COIL:RDVOL at 5.7V T/C 290 C

Tuesday, April 30, 2013, 13:10

COIL:RDCUR at 4.15A COIL:RDVOL at 5.75V T/C 310 C

Tuesday, April 30, 2013, 14:53

COIL:RDCUR at 4.15A COIL:RDVOL at 5.85V T/C 320 C

Tuesday, April 30, 2013, 16:30

COIL:RDCUR at 4.15A COIL:RDVOL at 5.89V T/C 328 C


Wednesday, May 01, 2013, 08:16

COIL:RDCUR at 4.15A COIL:RDVOL at 5.95V T/C 350 C - P/S is voltage limited at 5.95V

Ramping down current to 0. T/C logger is required elsewhere.


Friday, May 03, 2013, 12:07: Pumping out gas line through vacuum chamber.

The anode cable has been reconnected (see e-log entry 297)

Friday, May 03, 2013, 14:17: BIAS and EE to 30kV and -800V

Friday, May 03, 2013, 14:24: Started heating TBHT to 280A at 1A/min


Monday, May 06, 2013, 08:46: TBHT @ 276A, Voltage limiting at 2.5V. Increased limit to 2.7V. TGHT to 280A and 2.52V. COIL temp ~100C

Monday, May 06, 2013, 09:48: COIL:RDCUR at 2.93A

Monday, May 06, 2013, 10:34: Coil temp ~240C. Increasing COIL:RDCUR to 3.52A COIL:RDVOL at 4.1V

Monday, May 06, 2013, 11:48: Coil temp 330C COIL:RDCUR at 3.52A RDVOL at 4.9V

Monday, May 06, 2013, 11:54: COIL:RDCUR at 3.9A

Monday, May 06, 2013, 12:56: RDVOL at 5.9V. Coil temp ~380C

Monday, May 06, 2013, 13:47: Cooling down target to correct anode connection.


Tuesday, May 07, 2013, 08:47: De-biased

Tuesday, May 07, 2013, 10:06: Corrected el. connections to cathode floating. Started tube heating to 280A


Wednesday, May 08, 2013, 12:12: De-biased

Wednesday, May 08, 2013, 12:12: Cooling down cathode 1A/min


Thursday, May 09, 2013, 15:22: TPS:IV4 closed

    Reply  Friday, May 03, 2013, 14:32, Anders Mjos, , , , , , , Problems/Solutions, Cathode PS cable reconnected ISK4523D-rev4.pdfISK4563D-rev3.pdf

 

Sebastian Raeder wrote:

The powersupplies added to the teststand for operation of the IGLIS source have been removed from the HV cage as well as the RFQ driver.. The connections of the 9PIN connector in the HV cage have been grounded and the wire used for an voltage offset of the source has been removed.

 

NOTE: The Anode PS cable (used for biasing the target with a FEBIAD) is left grounded --> has to be rewired when running a FEBIAD source - Anode PS is turned off

 

Friday, May 03, 2013

The anode cable has been reconnected to F/T J and the 100k resistor placed between L and J. Q is now grounded to L. See dwg ISK4523

Tuesday, May 07, 2013

The cathode cable has been reconnected to F/T B and the 100k resistor removed between L and J. See dwg ISK4563 Rev 3

 

Entry  Wednesday, May 08, 2013, 08:52, Anders Mjos, , , , , , , Problems/Solutions, TMS and TPS P/S problems 

Wednesday, May 08, 2013, 08:52: TMS:CB5 found off this morning. Switched back on.

Wednesday, May 08, 2013, 12:14: Lost the following devices during a mass scan

TMS:VCB5
TMS:OCT3
TPS:Q4
TPS:Q2
TPS:Q1
TSG:CBC

All devices but TPS:Q1 could be completely restored.

Wednesday, May 08, 2013, 12:49: TPS:Q1 restored by lowering and increasing the voltage

 

Entry  Thursday, May 09, 2013, 15:28, Anders Mjos, , , , , , , Problems/Solutions, TSGRP1 showing signs of reduced performance Archiver.PNG

TSG:CG1A and TSG:CG1B shows an increase in vacuum.

See attached archived data for details.

Entry  Tuesday, May 21, 2013, 10:09, Rick Maharaj, , , , , , , , Test stand Vented 

Turbos stopped, waterlines flushed, chamber vented

Entry  Tuesday, May 21, 2013, 14:58, Rick Maharaj, CTL Febiad, , , , , , , CTL Febiad Installed 

Ceramic coated coil development target removed. CTL Febiad target installed.

Roughing chamber.

Entry  Tuesday, May 21, 2013, 15:14, Rick Maharaj, CTL Febiad, , , , , , , Turbos Started 

Turbos started

Entry  Tuesday, May 21, 2013, 15:50, Rick Maharaj, CTL Febiad, , , , , , , Cooling Water Turned On 

Cooling water turned on when vacuum reading 5.54e-06 T. Vacuum steadily increasing. Ion gauge reading steadily decreasing now reading 4.48e-06 T.

Entry  Tuesday, May 21, 2013, 19:38, Friedhelm Ames, , , , , , , Problems/Solutions, magnet power supply water leak 

The cyclotron operators discovered a water leak in the magnet power supply. The water is valved off and the power is off. A fault report has been issued to the power supplies group.