Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 17 of 53  Not logged in ELOG logo
ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  4   Thursday, September 15, 2011, 09:20 Anders Mjos       ISAC TestStand old e-loglink
to old e-log
  
  5   Thursday, September 15, 2011, 13:46 Anders MjosFEBIAD TestHP-FEBIAD    FailedFEBIAD Broken TubeSee attached file for photos of the broken
tube 
 FEBIAD_Broken_Tube.pdf 
  10   Friday, September 23, 2011, 16:40 Anders Mjos      Problems/Solutions9-pin connectors swapped on source trayFriday, September 23, 2011, 16:3: The connection
on the 9-pin connector for FEBIAD targets
showed burn marks from the previous FEBIAD
  
  11   Friday, September 23, 2011, 16:42 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8In progressTarget ready to be heatedFriday, September 23, 2011, 16:4: Target
installed and roughing started.
Friday, September 23, 2011, 17:12:
  
  13   Monday, September 26, 2011, 16:14 Anders Mjos      Problems/SolutionsFixed leak on water line for HS, added Kapton insulation
    While testing SiC#26 a leak
was discovered on the water line to the heat
shield. The leak was in the right joint (see
 Water_Leak.pdfKapton.pdf 
  19   Monday, October 03, 2011, 13:56 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneVenting

    

       
            
  
  20   Monday, October 03, 2011, 14:46 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget stored under vacuum

    

       
            
  
  21   Wednesday, October 12, 2011, 13:14 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget removed

    

       
            
  
  23   Thursday, October 13, 2011, 15:42 Anders MjosTraining HP-FEBIAD    Problems/SolutionsTarget ready to be heated

    

       
            
  
  24   Monday, October 17, 2011, 10:22 Anders MjosFEBIAD     Problems/SolutionsVariable leak valve replacedVariable leak valve with serial number
F3-592 has been replaced by F3-649 due
to regulating problems described previously
 F3-649.PDF 
  25   Monday, November 14, 2011, 15:40 Anders Mjos      Problems/SolutionsVariable leak valve repaired

    

       
            
 F3-VCR-43_Repair_F3-592.PDF 
  28   Tuesday, December 20, 2011, 16:09 Anders Mjos      Problems/SolutionsVariable leak valve repaired

    

       
            
  
  33   Thursday, February 16, 2012, 15:59 Anders Mjos      Problems/SolutionsHe and Ne installed and gas lines leak checkedNew supply of He and Ne was installed yesterday
and gas lines leak checked. The He bottle
is currently closed.
  
  49   Friday, March 02, 2012, 08:53 Anders MjosFEBIAD test     Problems/SolutionsTube heater insulator glowing   The insulator for the tube
heater was observed to be glowing with a
blue shine when the target was on high voltage.
 glowing_insulator.jpg 
  50   Friday, March 02, 2012, 13:28 Anders MjosFEBIAD test      Venting test standVenting for target exchange   
  72   Monday, April 16, 2012, 11:16 Anders MjosNb#6LP-SISITWTM1  In progressVenting, purging cooling linesVenting chamber and purging cooling lines
in preparation for target removal
  
  73   Monday, April 16, 2012, 11:56 Anders MjosNb#6LP-SISITWTM1  In progressVenting, purging cooling lines

    

       
            
  
  74   Wednesday, April 18, 2012, 12:19 Anders Mjos      Problems/SolutionsNoise from roughing pump TSGRP1Wednesday, April 18, 2012, 12:15: Blanked
off cooling lines. Chamber ready to be pumped
down.
  
  75   Wednesday, April 18, 2012, 13:09 Anders Mjos      Problems/SolutionsNoise from roughing pump TSGRP1

    

       
            
  
  76   Wednesday, April 18, 2012, 13:10 Anders MjosNo target     In progressPumping down empty vacuum chamberWednesday, April 18, 2012, 13:10: Roughing
the vacuum chamber.
Wednesday, April 18, 2012, 13:34
  
ELOG V2.9.2-2455