Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 17 of 53  Not logged in ELOG logo
ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  489   Wednesday, January 20, 2016, 14:26 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  490   Wednesday, January 20, 2016, 19:11 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  491   Thursday, January 21, 2016, 13:04 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  493   Friday, January 22, 2016, 13:35 Aurelia Laxdal      Problems/SolutionsTSG:RP1 nor performing

    

       
            
  
  974   Thursday, July 13, 2023, 18:29 Aurelia Laxdal LP-SIS    In progressSpectrometer tests Pumping down: TS loaded with a LP-SIS
container for spectrometer test. 
Started heating up the target container:
  
  1015   Monday, July 29, 2024, 23:02 Aurelia LaxdalTa#67 Thin foilsLP-SISITETM345447-1445235-10 Cooldown for removing the V wires  22:55 Cooldown completed to remove
the voltage wires from inside the vacuum
box. 
  
  3   Wednesday, September 14, 2011, 15:40 Anders MjosTaC#1LP-SISITETM138634-636833-6In progressTaC#1 installed and pumping down.Wednesday, September 14, 2011, 15:39: Vacuum
at 1.3e-5 torr 
Thursday, September 15, 2011, 08:59:
  
  4   Thursday, September 15, 2011, 09:20 Anders Mjos       ISAC TestStand old e-loglink
to old e-log
  
  5   Thursday, September 15, 2011, 13:46 Anders MjosFEBIAD TestHP-FEBIAD    FailedFEBIAD Broken TubeSee attached file for photos of the broken
tube 
 FEBIAD_Broken_Tube.pdf 
  10   Friday, September 23, 2011, 16:40 Anders Mjos      Problems/Solutions9-pin connectors swapped on source trayFriday, September 23, 2011, 16:3: The connection
on the 9-pin connector for FEBIAD targets
showed burn marks from the previous FEBIAD
  
  11   Friday, September 23, 2011, 16:42 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8In progressTarget ready to be heatedFriday, September 23, 2011, 16:4: Target
installed and roughing started.
Friday, September 23, 2011, 17:12:
  
  13   Monday, September 26, 2011, 16:14 Anders Mjos      Problems/SolutionsFixed leak on water line for HS, added Kapton insulation
    While testing SiC#26 a leak
was discovered on the water line to the heat
shield. The leak was in the right joint (see
 Water_Leak.pdfKapton.pdf 
  19   Monday, October 03, 2011, 13:56 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneVenting

    

       
            
  
  20   Monday, October 03, 2011, 14:46 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget stored under vacuum

    

       
            
  
  21   Wednesday, October 12, 2011, 13:14 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget removed

    

       
            
  
  23   Thursday, October 13, 2011, 15:42 Anders MjosTraining HP-FEBIAD    Problems/SolutionsTarget ready to be heated

    

       
            
  
  24   Monday, October 17, 2011, 10:22 Anders MjosFEBIAD     Problems/SolutionsVariable leak valve replacedVariable leak valve with serial number
F3-592 has been replaced by F3-649 due
to regulating problems described previously
 F3-649.PDF 
  25   Monday, November 14, 2011, 15:40 Anders Mjos      Problems/SolutionsVariable leak valve repaired

    

       
            
 F3-VCR-43_Repair_F3-592.PDF 
  28   Tuesday, December 20, 2011, 16:09 Anders Mjos      Problems/SolutionsVariable leak valve repaired

    

       
            
  
  33   Thursday, February 16, 2012, 15:59 Anders Mjos      Problems/SolutionsHe and Ne installed and gas lines leak checkedNew supply of He and Ne was installed yesterday
and gas lines leak checked. The He bottle
is currently closed.
  
ELOG V2.9.2-2455