  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  114   Thursday, June 28, 2012, 17:00 Pierre Bricault LP-FEBIAD    In progressCathode heater reached its value of 230 A and stoped. good test.Now ramp cathode current up to 290 A. The
total current out is 1.e-7 A.
 
  
  115   Thursday, June 28, 2012, 17:18 Pierre Bricault LP-FEBIAD    In progressLeave the cathode heater at 275 A overninght.    
  116   Friday, June 29, 2012, 08:57 Pierre Bricault LP-FEBIAD    In progressContinue cathode heating This morning the pressure was 3.5E-7
T. Current at 275 A is 30nA.
Continue cathode heating to 290 A
  
  121   Tuesday, July 03, 2012, 09:23 Friedhelm Ames      In progressstart up againpurged Ne line and started cathode heater
ramp up to 295 A
  
  126   Wednesday, July 04, 2012, 15:37 Anders MjosFEBIAD anode end cap test     In progressPumping down Replaced grid containing ring (target side)
with new ring. No contact between target
and anode measured in lab.
 photo_8.jpg 
  127   Thursday, July 05, 2012, 08:41 Anders MjosFEBIAD anode end cap test     In progressWater opened - reduced flow heat shield

    

       
            
  
  129   Thursday, July 05, 2012, 11:00 Friedhelm Ames      In progresssource started up againtube heater ramping started   
  139   Wednesday, July 11, 2012, 11:16 Anders Mjos      In progressPumping down - with new turbo pump    
  142   Thursday, July 12, 2012, 09:44 Anders Mjos      In progressVentingSystem will be vented and gas lines purged
with air, then nitrogen.
Thursday, July 12, 2012, 09:43: Shut
  
  147   Monday, July 16, 2012, 15:46 Anders Mjos      In progressPumping downMonday, July 16, 2012, 15:11: Roughing.
Monday, July 16, 2012, 15:38: Turbos
started.
  
  156   Friday, August 10, 2012, 11:29 Pierre BricaultNA   N ANAIn progressTest FEBIADThe helium bottle was found empty.
Rick will refill it and hook the
leak detector on the system to find out
  
  157   Friday, August 10, 2012, 12:44 Pierre BricaultNALP-FEBIAD  NANAIn progressFEBIAD testRick put the helium bottle back in the
rack.
Waiting for status of the gas lines.
  
  162   Saturday, August 11, 2012, 13:34 Pierre BricaultNALP-FEBIAD  NANAIn progressTest FEBIAD anode bias 120 V    
  164   Sunday, August 12, 2012, 21:50 Pierre Bricault      In progressTest FEBIADLost communication with EPICS. Came in
reset the ...
So far no luck.
  
  165   Sunday, August 12, 2012, 22:07 Pierre Bricault      In progressFBIAD testThe reset restored the control.
But magnet supply does not put any
amperage out.
  
  168   Monday, August 13, 2012, 14:26 Pierre Bricault      In progressFEBIAD testI am done with the FEBIAD test (anode biased)
We will swap the bias now to the
cathode and change the polarity to negative.
  
  169   Monday, August 13, 2012, 14:56 Pierre Bricault      In progressFEBIAD testOne thing that seems to be strange regarding
this FEBIAD is the best results are without
any current in the coil.
  
  170   Thursday, August 16, 2012, 10:41 Pierre Bricault      In progressTest FEBIADRay is finishing the electrical modifications
for the FEBIAD with the biased cathode.
We found the source of the sparks.
  
  174   Thursday, August 16, 2012, 16:56 Anders Mjos      In progressPumping down after troubleshootingThursday, August 16, 2012, 17:04 : Starting
turbos
Thursday, August 16, 2012, 17:09
  
  175   Friday, August 17, 2012, 08:30 Pierre Bricault      In progressFEBIAD test with cathode biasedYesterday Ray Dube has changed the configuration
in order to run the FEBIAD with the cathode
on negative bias.
  