211
|
Monday, September 24, 2012, 13:52 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 will not start without blowing the fuse | See e-fault 6329
Tried to start the pump from another
power outlet with Edi. No luck. Pump will |
|
213
|
Tuesday, September 25, 2012, 13:05 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 will not start without blowing the fuse |
|
|
538
|
Wednesday, September 07, 2016, 15:50 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:RP1 running uneven | Fault report was submitted.
Anders informed Anthony on Tuesday,
Sept 6, 2016. |
|
410
|
Monday, November 24, 2014, 08:41 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 replaced | by Edi on Friday Nov 11th |
|
541
|
Tuesday, September 13, 2016, 14:38 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 replaced |
|
|
486
|
Monday, January 18, 2016, 08:41 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 nor performing | The pump failed to pump down below 2 Torr.
on Friday 15th E-fault 8680 submitted. Vacuum
group will replace the pump today |
|
487
|
Monday, January 18, 2016, 15:38 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
488
|
Tuesday, January 19, 2016, 18:34 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
489
|
Wednesday, January 20, 2016, 14:26 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
490
|
Wednesday, January 20, 2016, 19:11 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
491
|
Thursday, January 21, 2016, 13:04 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
493
|
Friday, January 22, 2016, 13:35 |
Aurelia Laxdal | | | | | | | Problems/Solutions | TSG:RP1 nor performing |
|
|
542
|
Wednesday, September 14, 2016, 13:58 |
Anders Mjos | | | | | | | Problems/Solutions | TSG:RP1 latched breaker |
|
|
889
|
Friday, July 30, 2021, 15:34 |
Carla Babcock | | | | | | | Failed | TSG:RP1 failure | TP1A tripped off on Fernando, seems the
backing pressure got too high. Even with
PV1 closed the RP1 pump could not get below |
|
544
|
Friday, September 30, 2016, 11:14 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:RP1 Replacement | Friday, September 30, 2016, 10:01: Roughing
pump RP1 failed during roughing. Breaker
was tripped to RP1 & RP2.
Friday, September |
|
765
|
Monday, October 28, 2019, 09:24 |
Fernando Maldonado | | | | | | | Problems/Solutions | TSG:CG1A checked with local reader | Monday, October 28, 2019, 09:22: The local
reader indicated 42 mTorr while EPICS showed
51mTorr. |
|
453
|
Monday, June 29, 2015, 16:51 |
Friedhelm Ames | | | | | | | Problems/Solutions | TSG:BV1B closed | found TSG:TP1B tripped off. Closed TSG:BV1B
as pressure at TSG:iG1 was rising. Pressure
is coming down again. |
|
842
|
Friday, January 29, 2021, 09:13 |
Aaron Schmidt | | LP-SIS | | | 44139-10 | 44378-2 | In progress | TS settings ok. | Friday, January 29, 2021, 09:11: CANBUS
controller was replaced. Quick systems check
ok. Sources, HV, & Optics all good. |
|
690
|
Monday, October 22, 2018, 07:18 |
Aaron Schmidt | | | | | | | | TS restart after power outage | Friday, October 19, 2018, 10:00 (Approx):
Site wide power outage. TS completely shut
down. |
|
706
|
Monday, January 14, 2019, 09:47 |
Aaron Schmidt | | | | | | | | TS restart after power outage | Monday, January 14, 2019, 09:00: Epics
white out
Ref: Fault report 11993 (11981 |
|
|