  Test-Stand, Page 16 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject
  54   Tuesday, March 06, 2012, 15:17 Pierre Bricault       ISAC test stand

Start turbo pumps at 1514H

  55   Tuesday, March 06, 2012, 15:25 Pierre Bricault       ISAC test stand

Turbos at full speed. P = 1.5E-05 T

  56   Tuesday, March 06, 2012, 15:51 Friedhelm Ames       turbopumps in mass separator section started
  57   Wednesday, March 07, 2012, 09:27 Friedhelm AmesNb#6     Donewater cooling started

water cooling line valves opened. No response on vacuum TSG:IG1 3.5e-7 T

  58   Wednesday, March 07, 2012, 10:36 Paul Mocock       HV conditioning begins.

HV conditioning has begins. Vacuum chamber pressure is currently 3.2e-07 Torr on TSG:IG1.

  59   Wednesday, March 07, 2012, 13:48 Friedhelm AmesNb#6      high voltage conditioning

High voltage conditioning has been started by ISAC ops. Einzel lens is unstable below 5 kV., o.k. above this.

  60   Wednesday, March 07, 2012, 17:44 Friedhelm AmesNb#6      ramping up heaters

ramping up heaters has been started by ISAC ops.

  61   Thursday, March 08, 2012, 09:14 Friedhelm AmesNb#6      continue target heating

continue target heating up to 580 A. Strip tool for the heating up to 300A from yesyerday see below

Attachment 1: grab.K26109.png
grab.K26109.png
  62   Thursday, March 08, 2012, 14:08 Friedhelm AmesNb#6      heater ramped up

heaters have reached final values TGHT 580 A, TBHT 230 A, some sparking during ramp up. see strip tool image attached

Attachment 1: grab.Z27253.png
grab.Z27253.png
  63   Thursday, March 08, 2012, 17:16 Friedhelm AmesNb#6      mass scan started
  64   Thursday, March 08, 2012, 17:39 Friedhelm Ames      Problems/SolutionsTPS:Q2 amd TMS:MB1 failed

TPS:Q2 and TMS:MB1 failed during the scan. -> restarted.

  65   Thursday, March 08, 2012, 18:32 Friedhelm Ames       mass scan crashed due to a network error

mass scan crashed due to a network error will be restarted tomorrow

  66   Friday, March 09, 2012, 08:53 Friedhelm AmesNb#6     In progressmass scan started

mass scan started again. Total current 3.2e-8 A

  67   Friday, March 09, 2012, 10:56 Friedhelm AmesNb#6      scan finished

mass scan is finished and saved see attached.

Attachment 1: Nb6_mass_spectrum.docx
  68   Friday, March 09, 2012, 13:30 Friedhelm AmesNB#6      heater ramping down

Fc0 23 nA

IG1 9.9e-7 T

start automatic heater ramping down

  69   Friday, March 09, 2012, 17:25 Friedhelm Ames       heaters and HV power supplies off

heaters and HV power supplies have been switched off

IG1 5.1e-9 T.

  70   Wednesday, April 11, 2012, 09:30 Friedhelm Ames      FailedTSGRP1 poor vacuum

The backing pressure at TSGRP1 does not go below 578 mT. Fault report to vacuum.

  71   Wednesday, April 11, 2012, 09:34 Friedhelm Ames       turbopumps in mass separator section started

turbopumps in mass separator section started after power outages

  72   Monday, April 16, 2012, 11:16 Anders MjosNb#6LP-SISITWTM1  In progressVenting, purging cooling lines

Venting chamber and purging cooling lines in preparation for target removal

  73   Monday, April 16, 2012, 11:56 Anders MjosNb#6LP-SISITWTM1  In progressVenting, purging cooling lines

Anders Mjos wrote:

Venting chamber and purging cooling lines in preparation for target removal

 Monday, April 16, 2012, 11:55: Target removed. Cooling lines must be blanked off before pumping down.