Monday, July 15, 2019, 15:59, Fernando Maldonado, P2N, , , , , , Done, Re-wiring on service cap.
|
Monday, July 15, 2019, 15:54 : TBHT high current cables moved to Coil feedthroughs.
Coil high current cables moved to TBHT feedthroughs.
Resistor across Coil feedthroughs E and F are now moved between TBHT feedthroughs A and B.
Tuesday, July 16, 2019, 09:00
A braided cable between F and H was changed due to the burnt aspect it had. Most likely this cable was burnt along the previous ones (see entry 740) but since it was uniformed blacked and not broken I didn't noticed it.
Resistor/Varistor between TGHT and TBHT removed.
|
Monday, July 08, 2019, 09:20, Luca Egoriti, p2n1, , ITE, , , , In progress, p2n heating test 
|
(see entry 742)
p2n target heated over the weekend after the connections between the bottom target legs and the copper connector has been modified from rivets to M3 screws. Target hold current nicely with no major voltage spikes.
The plan now is to cycle the current heating few times to "stress test" the target. |
Thursday, July 04, 2019, 15:16, Aaron Schmidt, , , , , , , Problems/Solutions, TBHT insulator changed
|
Thursday, July 04, 2019, 15:00: TBHT insulator was swapped out on the source tray side.
The old one is very chipped. |
Thursday, July 04, 2019, 15:15, Aaron Schmidt, P2N - 1, , , , , , , P2N - 1 - 2 - 2019
|
Screws instead of rivets on target leg. Insulator changed.
Thursday, July 04, 2019, 15:14: Roughing
Thursday, July 04, 2019, 16:00: Turbos on.
Thursday, July 04, 2019, 16:12: IG1 on. RGA on
Friday, July 05, 2019, 08:12: Waterlines opened. No response on RGA. Vacuum ok @ 4.57e-06T.
Friday, July 05, 2019, 08:14: Power / sources on.
LE,FM
Friday, July 05, 2019, 10:00: Autoramping TGHT/TBHT to 250/100 A @ 3 A/min. Vacuum limits change to 5e-6 T and 5.5e-6 T. Vacuum ok @ 4.2e-6 T.
Friday, July 05, 2019, 11:42 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.06 |
6.46 |
TBHT |
27.91 |
9.01 |
COIL + EE |
27.82 |
2.80 |
TGHT |
27.93 |
6.82 |
Friday, July 05, 2019, 11:45 : Auto ramping TGHT/TBHT to 300/150A @ 3 A/min.
Friday, July 05, 2019, 17:32:
Friday, July 05, 2019, 13:56: Source/Optics on
Friday, July 05, 2019, 14:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.
Friday, July 05, 2019, 17:32: BIAS / EE / EZL @ 0 for the weekend. Heater will be left on.
FM
Monday, July 08, 2019, 15:12: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, July 08, 2019, 18:59: BIAS / EE / EZL @ 0.00 kV
Tuesday, July 09, 2019, 13:42: TBHT/TGHT @ 590/230A.
Tuesday, July 09, 2019, 13:49 BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, July 09, 2019, 14:04: Dipole magnet not responding. Cycling the PS on EPICS didn't work. Cycling the PS directly worked.
Tuesday, July 09, 2019, 17:28: BIAS / EE / EZL @ 0.00 kV
|
Tuesday, July 02, 2019, 18:25, Fernando Maldonado, , , , , , , Done, Blank on FEBIAD gas line installed
|
Tuesday, July 02, 2019, 18:24: A blind is installed on the FEBIAD gas line (see attached picture) to rule out the possibility of gases entering the TIS. |
Thursday, June 27, 2019, 09:51, Fernando Maldonado, , , , , , , Problems/Solutions, Melted cables changed
|
See elog 737
Fernando Maldonado wrote: |
Tuesday, June 25, 2019, 16:15: While inspecting the 9-pin connection with Ferran, it was noticed how two braided cables were burnt out pretty bad to the point they were separated in half (see attached pictures). Additionally the plastic insulator for the anode wire was melted.
Tuesday, June 25, 2019, 16:30: Braided cables need to be changed and anode wire redone.
Tuesday, June 25, 2019, 17:16: Wondering if this happened during TM4 source tray conditioning given the following entries in the elog (entry 725):
Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait*
Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.
|
Thursday, June 27, 2019, 09:45: The cables showing burnt marks were changed with new ones on Wednesday 26th. The grounding cables were insulated with yellow heatshrink. The anode wire connection was redone. |
Wednesday, June 26, 2019, 14:41, Carla Babcock, none, , , , , , Problems/Solutions, Issues with test stand wiring in service cap area
|
The wiring on the top of the test stand was burned, see entry 737.
Probable cause of this is as follows:
Coil lines are connected by a wire to HV common, the 9-pin feedthrough etc to maintain same voltage on all the insulator tops. This is also directly connected to the extraction electrode spark gap. When this sparks, it momentarily changes the potential in that line (normally HV common) which then can make this path the best route for current from the coil to return to ground.
See attached diagram.
Best solution to this problem is to disconnect the high current section from the low current section, and attach each separately to HV common.
Other possible improvements to wiring:
1. Remove jumpers between positive coil lines (and neg. coil lines) since these feethroughs are physically connected by the copper pipe.
2. Add a resistor to the jumper between coil - and TBHT - since this will eliminate all possibility of current flowing between the two.
3. Add a resistor in line where the high current section is connected to HV common to avoid possibility of current going through jumpers. |
Wednesday, June 26, 2019, 11:34, Aaron Schmidt, Test Ta, HP-SIS, , TM4, No Target oven #, 42972-4, In progress, Test target for TM4 checks
|
The HP-SIS uses the older center block. No serial number found.
Loaded with Tantalum. Rough Target description:
Comment on the bag - 0.9 cm space
Total Ta foils = 525
Foil Thickness = 0.025mm (assumed)
Target density = ?
Target length = 7.3 cm
Total Mass = ?
Total mass w/ Target oven= 1242 g.
Assembly voltage checks - OK. Note* Spacers between insulator & Target.
Thermocouple wires attach to the 9-pin connector.
Wednesday, June 26, 2019, 14:47: roughing.
Wednesday, June 26, 2019, 15:30: Turbos on.
Wednesday, June 26, 2019, 15:51: IG1 on. Vacuum @ 1.14e-4 T.
Thursday, June 27, 2019, 07:11: Waterlines opened. No response on RGA. Vacuum stable @ 3.49e-06T.
Thursday, June 27, 2019, 07:14: Power / sources switched on. Omega switched on to read thermocouples.
Thermocouple readings:
T1 - 24.8 C & T2 - 24.9 C.
Thursday, June 27, 2019, 07:16:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.40 |
5.21 |
TBHT |
27.11 |
7.91
|
COIL + EE |
27.01 |
2.26 |
TGHT |
27.12 |
6.26 |
Thursday, June 27, 2019, 12:43: Auto-ramping TGHT / TBHT to 350 / 125 A @ 2 A per min
Friday, June 28, 2019, 07:02: HV on, IV4 opened.
Friday, June 28, 2019, 07:09: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Friday, June 28, 2019, 07:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Friday, June 28, 2019, 07:12: Spark*
Friday, June 28, 2019, 07:15: Optics on. Some instability noticed on the BIAS.
Friday, June 28, 2019, 07:17:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.02 |
5.73 |
TBHT |
26.87 |
8.29
|
COIL + EE |
26.78 |
2.43 |
TGHT |
26.86 |
6.47 |
Thermocouple readings:
T1 - 106.7 C & T2 - 106.8 C.
Friday, June 28, 2019, 07:24: Halt auto ramping. TGHT / TBHT @ 375 / 150 A. BIAS / EE / EZL @ 0 kV. Unusual amount of sparks and instability.
Friday, June 28, 2019, 08:45: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Sparks seen immediately.
The TBHT insulator on the source tray side is glowing blue. Very neat.
Sparks observed striking inside the vacuum on the thermocouples / heat shield from the TBHT.
Friday, June 28, 2019, 08:57: BIAS / EE / EZL @ 0 kV. Auto-cooling @ 4 A per min.
Friday, June 28, 2019, 10:45: Disconnect mini pump, connect OMEGA thermometer to ground.
Friday, June 28, 2019, 10:59: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No sparks.
Friday, June 28, 2019, 11:03: manually bump up TGHT / TBHT to 50 A.
Friday, June 28, 2019, 11:05: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.
Friday, June 28, 2019, 11:39: Spark*
Friday, June 28, 2019, 11:57: Auto-ramping TGHT / TBHT to 500 / 200 A @ 4 A per min.
Friday, June 28, 2019, 12:15: TGHT / TBHT @ 322 / 200 A. Sparking*
Friday, June 28, 2019, 12:17: Halt auto-ramping. Sparking*. Manually bring down current.
Friday, June 28, 2019, 12:23: Sparks ceased. TGHT / TBHT @ 300 / 150 A
Friday, June 28, 2019, 12:24: BIAS / EE / EZL @ 0 kV. Auto-cooling @ 4 A per min.
Friday, June 28, 2019, 12:32: new video taken. After reviewing the video, the spark originates at the heat shield / thermocouples and moves to the TBHT insulator.
Friday, June 28, 2019, 15:26: Auto-ramping TGHT / TBHT to 200/ 100A @ 4 A per min.
Tuesday, July 02, 2019, 07:58: RGA restarted.
Tuesday, July 02, 2019, 08:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No sparks. Vacuum @ 7.08e-07T.
Tuesday, July 02, 2019, 08:08: Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.
Tuesday, July 02, 2019, 08:37: Halt auto ramp. TGHT / TBHT @ 310 / 150 A. Two sparks*. Vacuum @ 2.32e-06T. Allow to stabilize.
Tuesday, July 02, 2019, 08:55: Auto-ramping TGHT to 350 A @ 4 A per min. Vacuum @ 1.08e-06T.
Tuesday, July 02, 2019, 09:05: TGHT @ 350 A. Vacuum @ 1.08e-06T
Tuesday, July 02, 2019, 09:07: Spark*
Tuesday, July 02, 2019, 09:16: Spark*
Tuesday, July 02, 2019, 09:24: Spark*
Tuesday, July 02, 2019, 09:38: Auto-cooling @ 4 A per min.
Tuesday, July 02, 2019, 09:45: BIAS / EE / EZL @ 0 kV.
Tuesday, July 02, 2019, 11:39: IG1 off. Turbos off. RGA off |
Tuesday, June 25, 2019, 17:19, Fernando Maldonado, , , , , , , Problems/Solutions, Burnt cables on top of the test stand  
|
Tuesday, June 25, 2019, 16:15: While inspecting the 9-pin connection with Ferran, it was noticed how two braided cables were burnt out pretty bad to the point they were separated in half (see attached pictures). Additionally the plastic insulator for the anode wire was melted.
Tuesday, June 25, 2019, 16:30: Braided cables need to be changed and anode wire redone.
Tuesday, June 25, 2019, 17:16: Wondering if this happened during TM4 source tray conditioning given the following entries in the elog (entry 725):
Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait*
Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.
|
Monday, June 24, 2019, 15:41, Fernando Maldonado, , , , , , , Problems/Solutions, TMS:Q3 polarity
|
Monday, June 24, 2019, 15:25: Current quadrupole polarities:
|
Top/Bottom |
North/South |
TSP Q1 |
Positive |
Negative |
TSP Q2 |
Negative |
Positive |
TSP Q3 |
Positive |
Negative |
TSP Q4 |
Negative |
Positive |
TMS Q1 |
Positive |
Negative |
TMS Q2 |
Negative |
Positive |
TMS Q3 |
Negative |
Positive |
TMS Q4 |
Positive |
Negative |
TMS Q5 |
Negative |
Positive |
TMS Q6 |
Positive
|
Negative |
Monday, June 24, 2019, 15:35 : The polarity on TMS:Q3 is reversed. The top and bottom poles should be at a positive voltage similar to TMS:Q4, however a negative tagged cable is connected to it.
Monday, June 24, 2019, 15:39 : Swapping the cables on TMS:Q3.
|
Top/Bottom |
North/South |
TSP Q1 |
Positive |
Negative |
TSP Q2 |
Negative |
Positive |
TSP Q3 |
Positive |
Negative |
TSP Q4 |
Negative |
Positive |
TMS Q1 |
Positive |
Negative |
TMS Q2 |
Negative |
Positive |
TMS Q3 |
Positive |
Negative |
TMS Q4 |
Positive |
Negative |
TMS Q5 |
Negative |
Positive |
TMS Q6 |
Positive
|
Negative |
|
Saturday, June 22, 2019, 17:05, Luca Egoriti, p2n, , , , , , Done, Test stand installation
|
I opened the test stand because I forgot to install tantalum heat shields around the target. Everything was reinstalled as before (with heat shields). I could turn on the TSGTP1B but TSGTP1A does not turn on for some reason. I tried multiple times opening/closing its valve (BV1A) but the pump never starts.
Will keep pumping over the weekend with TP1B only. |
Friday, June 21, 2019, 15:12, Aaron Schmidt, P2N - 1, , , , , , , P2N - 1 - 2019
|
Friday, June 21, 2019, 14:48: Roughing.
Friday, June 21, 2019, 15:18: Turbo pumps on.
Friday, June 21, 2019, 15:31: IG1 on.
Friday, June 21, 2019, 15:42: Vacuum@9.31e-5 T
Friday, June 21, 2019, 15:51: RGA switched on.
Friday, June 21, 2019, 16:30: Luca wants to put heat shields on his target. Aborting pumping.
Friday, June 21, 2019, 16:57: IG1 off
Friday, June 21, 2019, 16:57: Turbo pumps off.
Friday, June 21, 2019, 16:57: RGA switched off
AS
Monday, June 24, 2019, 07:18: Restart TP1A (Timeout) Global Reset. Restart again.
Monday, June 24, 2019, 07:29: TP1A to speed. Monitor. Vacuum @ 4.31e-06T
Monday, June 24, 2019, 07:31: Restart RGA.
Monday, June 24, 2019, 08:57: Waterlines opened. No response on RGA. Vacuum @ 3.23e-06T.
Monday, June 24, 2019, 09:03: Power / sources on. (No HV)
Monday, June 24, 2019, 09:04: TGHT / TBHT / Coil PS ready. Vacuum @ 3.23e-06T.
Monday, June 24, 2019, 10:09: Auto-ramping TGHT / TBHT to 150 / 75 A @ 2 A per min.
Monday, June 24, 2019, 10:57: Auto-ramping was halted @ 35 A. Coil increased. TGHT, TBHT, Coil brought back to 0 A
Monday, June 24, 2019, 10:58:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.27 |
5.47 |
TBHT |
26.11 |
8.20
|
COIL + EE |
26.03 |
2.36 |
TGHT |
26.12 |
6.33 |
Monday, June 24, 2019, 11:01: Auto-ramping TGHT / TBHT to 150 / 75 A @ 2 A per min. Manually ramp coil to 150 A @ approx the same rate.
Monday, June 24, 2019, 12:20: Halt at 140A TGHT / Coil. Vacuum limit?
Monday, June 24, 2019, 13:23: Increasing good vac limit. From 3e-6 to 4.5e-6 T
Monday, June 24, 2019, 13:29: Auto-ramping TGHT / TBHT to 300 / 120 A @ 2 A per min. Manually ramp coil from 140 to 150 A @ approx the same rate.
Monday, June 24, 2019, 13:37
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
26.97 |
5.95 |
TBHT |
26.82 |
8.62
|
COIL + EE |
26.70 |
2.60 |
TGHT |
26.80 |
6.54 |
Monday, June 24, 2019, 14:4: TGHT @ 270 A. Vacuum limits reached 3.05e-06T. Gradual out-gassing w/ cont'd auto ramp.
Tuesday, June 25, 2019, 07:53: Auto-ramping TGHT / TBHT to 550 / 120 A @ 2 A per min.
Tuesday, June 25, 2019, 08:34:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
25.30 |
5.75 |
TBHT |
25.08 |
8.40
|
COIL + EE |
24.96 |
2.47 |
TGHT |
25.08 |
6.55 |
Tuesday, June 25, 2019, 10:09: At approx 9:45am a vacuum spike tripped the test stand. All heaters at 0 A. Power supplies checked.
Tuesday, June 25, 2019, 10:11: TGHT / TBHT / Coil @ 6 A. Bumped up manually.
Tuesday, June 25, 2019, 10:12: Auto-ramping TGHT / TBHT to 300 / 100 A @ 2 A per min. Manually ramp coil to 150 A.
Tuesday, June 25, 2019, 11:01: One sheet on the target leg is shining red.
Tuesday, June 25, 2019, 11:01: Aborting the ramping.
Tuesday, June 25, 2019, 11:08 :
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.50 |
6.29 |
TBHT |
27.28 |
8.88
|
COIL + EE |
27.20 |
2.74 |
TGHT |
27.30 |
6.73 |
Tuesday, June 25, 2019, 11:18: Continue auto ramping
Tuesday, June 25, 2019, 11:37: Auto-cooling @ 12 A per min. Coil tapped down manually.
Tuesday, June 25, 2019, 11:58: Sources off. RGA off. Power off.
Tuesday, June 25, 2019, 11:59: IG1 off. Turbos off. |
Wednesday, June 19, 2019, 17:25, Fernando Maldonado, , , , , , , Done, Thermocouple connection
|
Wednesday, June 19, 2019, 17:13 Ferran and Fernando tested the 9-pin connector to have a reading on a thermocouple following the connections used by Aurelia (see elog 721).
Wednesday, June 19, 2019, 17:24: Test succesful!
|
Thursday, June 13, 2019, 14:05, Aaron Schmidt, , , , , , , Done, Spare TGHT PS installed.
|
Thursday, June 13, 2019, 14:04: Spare TGHT PS installed / tested. The old one is to be sent out for repair.
|
Tuesday, June 11, 2019, 14:33, Aaron Schmidt, Test FEBIAD, LP-FEBIAD, , , 395530-3, 42752-5, In progress, ISAC Source tray re-installed w/ optics tray.
|
Tuesday, June 11, 2019, 14:33: Roughing.
Wednesday, June 12, 2019, 08:18: Venting to install FEBIAD.
Wednesday, June 12, 2019, 09:13: LP-FEBIAD installed. Roughing.
Wednesday, June 12, 2019, 11:13: Turbo pumps on.
Wednesday, June 12, 2019, 11:21: Ion gauge on.
Wednesday, June 12, 2019, 11:48: RGA re-connected & switched on.
Thursday, June 13, 2019, 10:27:
He Leak TEST:
Vacuum Group Leak detector LD#4.
Thursday, June 13, 2019, 10:28: Vacuum @ 1.60e-06T
LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec
Thursday, June 13, 2019, 10:35: LD baseline after opening valve to turbo pumps: 1.2e-09 atm-cc/sec
Full open base:
Vacuum @ 1.60e-06T. RGA status:
Water: 2.20e-006
He: 4.55e-010
LD: 1.2e-09 atm-cc/sec
Thursday, June 13, 2019, 10:35:
Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 10:40 Vacuum @ 1.54e-06T . RGA status:
Water: 2.20e-006
He: 4.20e-010
LD: 0.1e-09 atm-cc/sec. Purge and close FS#2.
Thursday, June 13, 2019, 10:45: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 10:50: Vacuum @ 1.52e-06T. RGA status:
Water: 2.18e-006
He: 3.68e-010
LD: 0.7e-09 atm-cc/sec. Purge and close FS#3.
Thursday, June 13, 2019, 10:50: Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 10:55: Vacuum @ 1.54e-06T. RGA status:
Water: 2.16e-006
He: 9.24e-011
*LD: 3.7e-09 atm-cc/sec. Run for another 5 minutes.
Thursday, June 13, 2019, 11:00: Vacuum @ 1.52e-06T. RGA status:
Water: 2.15e-006
He: 2.06e-010
*LD: 0.7e-08 atm-cc/sec. Potential He escaping through o-rings*
Purge and close FS#4.
Thursday, June 13, 2019, 11:01: Open line FS#5 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 11:06: Vacuum @ 1.52e-06T. RGA status:
Water: 2.13e-006
He: 2.75e-010
LD: 1.7e-08 atm-cc/sec. Purge and close FS#5
Thursday, June 13, 2019, 11:07: Depressurize lines. Connect HPA & Purge all lines.
Thursday, June 13, 2019, 11:12: Vacuum @ 1.54e-06T . RGA status:
Water: 2.12e-006
He: 6.21e-010
LD: 3.3e-08 atm-cc/sec
Close Valve & disconnect LD. HE LEAK TEST COMPLETE
Thursday, June 13, 2019, 11:20: Vacuum @1.52e-06T :Begin gradually opening the waterlines.
Thursday, June 13, 2019, 11:22: Open FS#2. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:23: Open FS#3. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:23: Open FS#4. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:24: Open FS#5. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:28: Power sources: Tested. TGHT PS is still a no go. Power switched off, lock out.
Thursday, June 13, 2019, 14:03: New TGHT PS installed.
Thursday, June 13, 2019, 14:06: Power / sources on.
Thursday, June 13, 2019, 14:20: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :)
Thursday, June 13, 2019, 14:21: Spark*
Thursday, June 13, 2019, 14:29: Sources to 0 kV. FS#8 needs re-connection.
Thursday, June 13, 2019, 14:43: FS#8 connected. Vacuum ok @ 1.52e-06T. No response on RGA.
Thursday, June 13, 2019, 14:45: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Friday, June 14, 2019, 06:52: Restart RGA.
Friday, June 14, 2019, 08:37: Run mini pump to prep gas-lines.
Friday, June 14, 2019, 08:44: Close SV1, manual valve & turn off mini pump. Gradually open gas lines.
Friday, June 14, 2019, 08:48: Gas lines fully opened.
Friday, June 14, 2019, 08:49: Auto-ramping TGHT / TBHT to 570 / 270 A @ 2 A per min.
Friday, June 14, 2019, 08:52: HV sources ready.
FM
Friday, June 14, 2019, 11:11: Anode current @ 0V 7.326mA. Setting Anode to 150 V.
AS
Friday, June 14, 2019, 11:16: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Friday, June 14, 2019, 11:18: Optics set.
Friday, June 14, 2019, 11:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.
Friday, June 14, 2019, 14:39: Multiple wire scans attempted since 1pm. Controls & Diagnostics contacted. Ongoing troubleshooting.
Monday, June 17, 2019, 08:34: TMS:MB1 - Reset.
Monday, June 17, 2019, 09:18: Auto-ramping TBHT to 310 A @ 2 A per min.
FM
Monday, June 17, 2019, 10:30: TBHT manually tapped to 320 A ~2A/min
Tuesday, June 18, 2019, 18:42 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.
Tuesday, June 18, 2019, 18:43: Begin auto-cooling @ 2A per min.
AS
Wednesday, June 19, 2019, 07:10: IV4 Closed.
Wednesday, June 19, 2019, 07:12: Gas lines & Sources / power off.
Wednesday, June 19, 2019, 07:15: RGA off.
Wednesday, June 19, 2019, 07:16: IG1 & Turbo pumps off.
Wednesday, June 19, 2019, 08:35: Purging / venting. |
Monday, June 10, 2019, 14:35, Aaron Schmidt, , , , , , , Done, Optics Tray / EZL inspection.   
|
Monday, June 10, 2019, 13:00: Optics Tray removed.
Megger'd @ 1000V on EZL and Collimator. Passed. Open it.
Monday, June 10, 2019, 14:34: 3 cracked insulators found. 1 quite broken on the threads (see attached pictures). Replaced insulators & re-assembled optics tray.
Megger'd @ 1000V on EZL and Collimator. Passed.
Thursday, June 13, 2019, 14:23: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :) |
Monday, June 10, 2019, 14:34, Aaron Schmidt, , , , , , , Done, Removed TM4 Source Tray
|
Monday, June 10, 2019, 09:30: TM4 Source Tray removed - To HC area. |
Friday, June 07, 2019, 16:56, Carla Babcock, , , , , , , , TM4 source tray state
|
TM4 source tray left in test stand over weekend, just the rouging pumps on. Ready to be removed Monday morning.
Monday, June 10, 2019, 06:35: Venting - Aaron S. |
Monday, June 03, 2019, 14:13, Aaron Schmidt, , , , TM4, 395530-3, 42752-5, Done, TMS:TP6 Turbo pump issue. (Ok now)
|
Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud hum / buzz sound. The vacuum pressure is steadily increasing on IG6. Edi Contacted. Turbo pump likely failing.
The sound tapered off.

Monday, June 03, 2019, 14:32: Sound was the turbo pump spinning down. Edi restarted & reset the main controller. It was knocked out by one of the morning sparks.

|
Monday, June 03, 2019, 11:35, Aaron Schmidt, , LP-SIS, , TM4, 395530-3, 42752-5, Problems/Solutions, TGHT PS Failed.
|
Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to 50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began running independently. Anode current dropped from 7.328 mA to 6.105 mA. Knocked out the TGHT
The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive.
Monday, June 03, 2019, 10:46: TGHT Still non-responsive. Bump down HV to open the cage & cycle the PS.
PS model: Xantrex XPR 10-600
Message lights on the front of the power supply:
OTP - INT - OVP - SNS Triggered.
Front Panel Display, Status Annunciators
1. AC: The AC input is out of range and has
caused the output of
the supply to be
shut down (red)
2. OTP: The internal Over Temperature
Protection threshold has been exceeded,
disabling the supply output until the sensor
s cool to within the normal operating
temperature range (red)
3. INT: The external shutdo
wn line has been asserted, disabling the output of the
supply (green)
4. OVP: The output Over Voltage Prot
ection threshold have been exceeded,
latching the supply output off (red)
5. SNS: The remote sense line protection
circuit has been activated, latching the
supply output off (red)
6. ON: The supply output
is enabled (green)
7. OFF: The supply output
has been disabled (green)
8. LCL: The supply is in
Local control mode (green)
9. RMT: The supply is in Remote program mode (green)
10. CV: The supply is operating in
Constant Voltage mode (green)
11. CC: The supply is operating in
Constant Current mode (green)
Thursday, June 13, 2019, 14:05: ELOG 732 - PS replaced. |
|