54
|
Tuesday, March 06, 2012, 15:17 |
Pierre Bricault | | | | | | | | ISAC test stand |
Start turbo pumps at 1514H |
55
|
Tuesday, March 06, 2012, 15:25 |
Pierre Bricault | | | | | | | | ISAC test stand |
Turbos at full speed. P = 1.5E-05 T |
56
|
Tuesday, March 06, 2012, 15:51 |
Friedhelm Ames | | | | | | | | turbopumps in mass separator section started |
|
57
|
Wednesday, March 07, 2012, 09:27 |
Friedhelm Ames | Nb#6 | | | | | | Done | water cooling started |
water cooling line valves opened. No response on vacuum TSG:IG1 3.5e-7 T |
58
|
Wednesday, March 07, 2012, 10:36 |
Paul Mocock | | | | | | | | HV conditioning begins. |
HV conditioning has begins. Vacuum chamber pressure is currently 3.2e-07 Torr on TSG:IG1. |
59
|
Wednesday, March 07, 2012, 13:48 |
Friedhelm Ames | Nb#6 | | | | | | | high voltage conditioning |
High voltage conditioning has been started by ISAC ops. Einzel lens is unstable below 5 kV., o.k. above this. |
60
|
Wednesday, March 07, 2012, 17:44 |
Friedhelm Ames | Nb#6 | | | | | | | ramping up heaters |
ramping up heaters has been started by ISAC ops. |
61
|
Thursday, March 08, 2012, 09:14 |
Friedhelm Ames | Nb#6 | | | | | | | continue target heating |
continue target heating up to 580 A. Strip tool for the heating up to 300A from yesyerday see below |
62
|
Thursday, March 08, 2012, 14:08 |
Friedhelm Ames | Nb#6 | | | | | | | heater ramped up |
heaters have reached final values TGHT 580 A, TBHT 230 A, some sparking during ramp up. see strip tool image attached |
63
|
Thursday, March 08, 2012, 17:16 |
Friedhelm Ames | Nb#6 | | | | | | | mass scan started |
|
64
|
Thursday, March 08, 2012, 17:39 |
Friedhelm Ames | | | | | | | Problems/Solutions | TPS:Q2 amd TMS:MB1 failed |
TPS:Q2 and TMS:MB1 failed during the scan. -> restarted. |
65
|
Thursday, March 08, 2012, 18:32 |
Friedhelm Ames | | | | | | | | mass scan crashed due to a network error |
mass scan crashed due to a network error will be restarted tomorrow |
66
|
Friday, March 09, 2012, 08:53 |
Friedhelm Ames | Nb#6 | | | | | | In progress | mass scan started |
mass scan started again. Total current 3.2e-8 A |
67
|
Friday, March 09, 2012, 10:56 |
Friedhelm Ames | Nb#6 | | | | | | | scan finished |
mass scan is finished and saved see attached. |
68
|
Friday, March 09, 2012, 13:30 |
Friedhelm Ames | NB#6 | | | | | | | heater ramping down |
Fc0 23 nA
IG1 9.9e-7 T
start automatic heater ramping down |
69
|
Friday, March 09, 2012, 17:25 |
Friedhelm Ames | | | | | | | | heaters and HV power supplies off |
heaters and HV power supplies have been switched off
IG1 5.1e-9 T. |
70
|
Wednesday, April 11, 2012, 09:30 |
Friedhelm Ames | | | | | | | Failed | TSGRP1 poor vacuum |
The backing pressure at TSGRP1 does not go below 578 mT. Fault report to vacuum. |
71
|
Wednesday, April 11, 2012, 09:34 |
Friedhelm Ames | | | | | | | | turbopumps in mass separator section started |
turbopumps in mass separator section started after power outages |
72
|
Monday, April 16, 2012, 11:16 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines |
Venting chamber and purging cooling lines in preparation for target removal |
73
|
Monday, April 16, 2012, 11:56 |
Anders Mjos | Nb#6 | LP-SIS | ITW | TM1 | | | In progress | Venting, purging cooling lines |
Anders Mjos wrote: |
Venting chamber and purging cooling lines in preparation for target removal
|
Monday, April 16, 2012, 11:55: Target removed. Cooling lines must be blanked off before pumping down. |