ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
 |
27
|
Monday, December 19, 2011, 13:09 |
Aurelia Laxdal | | | | | | | | Test Stand updates | In January Controls will install a new
firewall for ISAC Test Stand. Until then
ISAC Test Stand can be used, but it may require |
|
34
|
Friday, February 17, 2012, 10:27 |
Aurelia Laxdal | | | | | | | Done | Started the Archivers | Started both ISACT and SOURCES Archivers. |
|
83
|
Monday, May 14, 2012, 15:36 |
Aurelia Laxdal | | | | | | | | Test Stand - IOC reboot | Did a local IOC reboot to cure to white-out.
The test stand is now operational. |
|
84
|
Monday, May 14, 2012, 16:57 |
Aurelia Laxdal | | | ITE | TM4 | | | | SiC#27-HP-SIS installed in the Test Stand | Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012
in the Test Stand. Pumping down. |
|
92
|
Tuesday, May 15, 2012, 16:18 |
Aurelia Laxdal | SiC#27 | HP-SIS | ITE | TM4 | | | In progress | Target/Ion source conditioning | Did the HV conditioning up to 30kV and
started to ramp up the heaters to 580A and
230A. |
|
94
|
Wednesday, May 16, 2012, 18:10 |
Aurelia Laxdal | | | ITE | TM4 | | | | SiC#27 cooling down | Today: did a mass scan at 580A on TGHT
and 230A on TBHT at 30kV. Found some A/q
units discrepancies on the mass scan page. |
|
102
|
Friday, June 01, 2012, 12:23 |
Aurelia Laxdal | Ta#38 | LP-SIS | ITW | TM1 | | | In progress | HV & Heaters conditioning. | Did the HV conditioning.
Heaters conditioning in progress.
The Hall probe is not working: couldn't |
|
113
|
Thursday, June 28, 2012, 15:14 |
Aurelia Laxdal | | LP-FEBIAD | | | | | | Quick check | Just a quick check at the Test Stand:
1. The system operational (
white out not present ) with TSH:TBHT heating |
|
136
|
Monday, July 09, 2012, 11:14 |
Aurelia Laxdal | | | | | | | | Test Stand status | Restarted the PC at the Test Stand.
Restarted the Archivers; currently
pumping down the separator area. |
|
183
|
Monday, August 27, 2012, 13:21 |
Aurelia Laxdal | NiO#1 | HP-FEBIAD | ITE | TM4 | | | In progress | HV conditioning at Test Stand | Did HV conditioning up to TSG:BIAS=30kV,
TSH=EE=-600V
Turned off the HV for Kazuya to check |
|
184
|
Monday, August 27, 2012, 15:21 |
Aurelia Laxdal | | | | | | | In progress | Xantrex PS 10-600 for TSH:TGHT is not working | When turned ON it was not going higher
than 3.6A (EPICS/front panel). Kazuya checked
the connections at the back and also the |
|
185
|
Tuesday, August 28, 2012, 16:57 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | Updates for NiO#1 at Test Stand | Tested the power supplies and locked up
the HV cage.
Turned on the HV: 30kV. |
|
186
|
Wednesday, August 29, 2012, 11:34 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 heating startup & few checks | Friedhelm checked the voltage across R4
from ISK4563D-rev2.pdf. It shows 50 kOhms
with the power supplies off and everything |
|
187
|
Thursday, August 30, 2012, 14:34 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 updates |
Normal
0
false
false
false
|
|
188
|
Thursday, August 30, 2012, 16:51 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | In progress | NiO#1 cooldown started | Started the cooldown. |
|
190
|
Friday, August 31, 2012, 11:12 |
Aurelia Laxdal | | HP-FEBIAD | ITE | TM4 | | | Done | Finished testing NiO#1 | Turned off the HV and the optics in the
first section. Couldn't turn off the optics
in the second section: left a message for |
|
215
|
Tuesday, September 25, 2012, 16:10 |
Aurelia Laxdal | | | | | | | | Conditioning - SiC-HP-FEBIAD for operator training | Did the HV conditioning up to 30kV.
Started the heaters conditioning:
for TSH:TGHT up to 580A |
|
216
|
Thursday, September 27, 2012, 12:27 |
Aurelia Laxdal | | | | | | | In progress | SiC-HP-FEBIAD for operator training | The source was used yesterday for operator
training.
Today, I found the source off: the |
|
217
|
Friday, September 28, 2012, 09:59 |
Aurelia Laxdal | | | | | | | In progress | SiC-HP-FEBIAD for operator training - Source Off | Checked with ISAC Ops this morning and
they are not available for FEBIAD training.
Turned off the source until next week. |
|
218
|
Monday, October 01, 2012, 10:41 |
Aurelia Laxdal | | HP-FEBIAD | | | | | In progress | SiC-HP-FEBIAD for operator training - Source ON | Turned the source back ON. Heaters are
ramping up. |
|