ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
769
|
Friday, November 01, 2019, 16:01 |
Fernando Maldonado | | LP-SIS | | | 41790-9 | 43515-9 | In progress | Peek seal tests on UCx#30 HS | Friday, November 01, 2019, 15:47: A symbiotic
peek seal assembly was installed on
the manipulator grip to verify the temperature |
|
1025
|
Wednesday, October 09, 2024, 13:29 |
Dave Neilson | | | | | 44691-8 | 45235-26 | | Retainer tests - with mass marker target | Wednesday, October 09, 2024, 11:28
Target loaded, remote power supply
added for mass marker, negative channel on |
|
1
|
Wednesday, June 29, 2011, 15:30 |
John Wong | | | | | | | | Testing Yield station elog | ABC 123 blah blah blah... |
|
4
|
Thursday, September 15, 2011, 09:20 |
Anders Mjos | | | | | | | | ISAC TestStand old e-log | link
to old e-log |
|
5
|
Thursday, September 15, 2011, 13:46 |
Anders Mjos | FEBIAD Test | HP-FEBIAD | | | | | Failed | FEBIAD Broken Tube | See attached file for photos of the broken
tube |
|
9
|
Friday, September 23, 2011, 15:38 |
Rick Maharaj | | | | | | | | test stand vented | Test stand vented |
|
10
|
Friday, September 23, 2011, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray | Friday, September 23, 2011, 16:3: The connection
on the 9-pin connector for FEBIAD targets
showed burn marks from the previous FEBIAD |
|
12
|
Monday, September 26, 2011, 14:56 |
John Wong | | | | | | | Problems/Solutions | 9-pin connectors swapped on source tray |
|
|
13
|
Monday, September 26, 2011, 16:14 |
Anders Mjos | | | | | | | Problems/Solutions | Fixed leak on water line for HS, added Kapton insulation |
While testing SiC#26 a leak
was discovered on the water line to the heat
shield. The leak was in the right joint (see |
|
14
|
Wednesday, September 28, 2011, 14:11 |
Friedhelm Ames | SiC#26 | | ITE | TM4 | | | | gas system checked and pumped | The gas system has been checked. The variable
valve opens at about 7.55 very fast. Please
be careful when using it. Stepsize for opening |
|
22
|
Thursday, October 13, 2011, 12:33 |
Rick Maharaj | Training | | | | | | | Test stand vented | test stand vented |
|
23
|
Thursday, October 13, 2011, 15:42 |
Anders Mjos | Training | HP-FEBIAD | | | | | Problems/Solutions | Target ready to be heated |
|
|
24
|
Monday, October 17, 2011, 10:22 |
Anders Mjos | FEBIAD | | | | | | Problems/Solutions | Variable leak valve replaced | Variable leak valve with serial number
F3-592 has been replaced by F3-649 due
to regulating problems described previously |
|
25
|
Monday, November 14, 2011, 15:40 |
Anders Mjos | | | | | | | Problems/Solutions | Variable leak valve repaired |
|
|
26
|
Tuesday, December 13, 2011, 14:10 |
Aurelia Laxdal | | | | | | | | Test Stand IOC reboot | Evgeniy rebooted the ISAC Test Stand IOC.
Re-started EPICS at the Test Stand.
Found all 4 turbo pumps off and their |
|
27
|
Monday, December 19, 2011, 13:09 |
Aurelia Laxdal | | | | | | | | Test Stand updates | In January Controls will install a new
firewall for ISAC Test Stand. Until then
ISAC Test Stand can be used, but it may require |
|
28
|
Tuesday, December 20, 2011, 16:09 |
Anders Mjos | | | | | | | Problems/Solutions | Variable leak valve repaired |
|
|
29
|
Friday, January 20, 2012, 10:37 |
Friedhelm Ames | | | | | | | | vacuum pumps shut off | turbo pumps shut off due to work on
cooling water system |
|
30
|
Tuesday, January 24, 2012, 09:44 |
Friedhelm Ames | | | | | | | | turbo pumps restarted | All turbo pumps have been restarted after
cooling water is back and running.
|
|
31
|
Wednesday, February 08, 2012, 17:39 |
Friedhelm Ames | | | | | | | Failed | TSG:TP1B failure | Both turbo pumps at the source box were
found off. TSG:TP1A has been started normally.
TSG:TP1B does not spin up above 3KRPM even |
|