Tuesday, September 20, 2011, 19:00, Aurelia Laxdal, TaC#1, LP-SIS, ITE, TM1, 38634-6, 36833-6, Done, Finished testing TaC#1
|
Tuesday, September 20, 2011:
Did another mass scan today at 5:40. Saved as: plotdump-local-clean.txt Sept 20 11 11-51-20.txt
Started target cool-down. Tomorrow the target would be ready to be removed from the Test Stand. |
Tuesday, December 12, 2023, 16:11, Dave Neilson, Shunt #0, , , , -, -, , P2N Thermal Test
|
Tuesday, December 12, 2023, 16:07 - Pumping down test stand overnight for testing tomorrow. vacuum good, turbos starting now. Four thermocouples
attached inside. tc1: high on (+) TGHT leg, pins 1+2. tc2: at target terminal (+), pins 4+5. tc3: at target terminal (-), pins 6+7. tc4: low on (+) TGHT
leg, pins 8+9. |
Thursday, February 04, 2021, 18:48, Fernando Maldonado, , LP-SIS, , , 44139-10, 44378-2 , Problems/Solutions, Energy spread calibration with SIS 6x
|
The system was vented to make clearance on the waterlines as a very small continuous discharge was observed.
The inspection revealed some marks on the HS water line (sideview photo). From the the bottom and from real close (zoom and backview photo) the
marks are quite noticeable with shinny copper in the middle and dark circles around. |
Friday, November 01, 2019, 16:01, Fernando Maldonado, , LP-SIS, , , 41790-9, 43515-9 , In progress, Peek seal tests on UCx#30 HS   
|
Friday, November 01, 2019, 15:47: A symbiotic peek seal assembly was installed on the manipulator grip to verify the temperature at high
voltage and high current.
Friday, November 01, 2019, 15:48: Three thermocouples added for temperature readings. |
Wednesday, October 09, 2024, 13:29, Dave Neilson, , , , , 44691-8 , 45235-26 , , Retainer tests - with mass marker target
|
Wednesday, October 09, 2024, 11:28 Target loaded, remote power supply added for mass marker, negative channel on pin 5, positive channel
on pin 7.
Wednesday, October 09, 2024, 11:50 roughing |
Wednesday, June 29, 2011, 15:30, John Wong, , , , , , , , Testing Yield station elog
|
ABC 123 blah blah blah... |
Thursday, September 15, 2011, 09:20, Anders Mjos, , , , , , , , ISAC TestStand old e-log
|
link to old e-log |
Thursday, September 15, 2011, 13:46, Anders Mjos, FEBIAD Test, HP-FEBIAD, , , , , Failed, FEBIAD Broken Tube
|
See attached file for photos of the broken tube |
Friday, September 23, 2011, 15:38, Rick Maharaj, , , , , , , , test stand vented
|
Test stand vented |
Friday, September 23, 2011, 16:40, Anders Mjos, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray
|
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn marks from the previous FEBIAD tests. Corresponding
mark was found on the connector on the target side. Because of this the upper and lower 9-pin connectors were swapped to have a clean connector for the
next FEBIAD target. |
Monday, September 26, 2011, 14:56, John Wong, , , , , , , Problems/Solutions, 9-pin connectors swapped on source tray
|
Anders Mjos wrote:
Friday, September 23, 2011, 16:3: The connection on the 9-pin connector for FEBIAD targets showed burn |
Monday, September 26, 2011, 16:14, Anders Mjos, , , , , , , Problems/Solutions, Fixed leak on water line for HS, added Kapton insulation 
|
While testing SiC#26 a leak was discovered on the water line to the heat shield. The leak was in the right joint (see attachment). The heat
shield water lines were removed from the test stand and repaired in the Machine Shop.
Kapton was added to the FEBIAD coil line to prevent
it from shorting to the target heater line (see attachment).
|
Wednesday, September 28, 2011, 14:11, Friedhelm Ames, SiC#26, , ITE, TM4, , , , gas system checked and pumped
|
The gas system has been checked. The variable valve opens at about 7.55 very fast. Please be careful when using it. Stepsize for opening around this
value should be 0.01. Gas lines have been pumped with pump in the high voltage rack. Ne leak was opened to release pressure. |
Thursday, October 13, 2011, 12:33, Rick Maharaj, Training , , , , , , , Test stand vented
|
test stand vented |
Thursday, October 13, 2011, 15:42, Anders Mjos, Training , HP-FEBIAD, , , , , Problems/Solutions, Target ready to be heated
|
Rick Maharaj wrote:
test stand vented |
Monday, October 17, 2011, 10:22, Anders Mjos, FEBIAD, , , , , , Problems/Solutions, Variable leak valve replaced
|
Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems described previously by Fridhelm Ames. |
Monday, November 14, 2011, 15:40, Anders Mjos, , , , , , , Problems/Solutions, Variable leak valve repaired
|
Anders Mjos wrote:
Variable leak valve with serial number F3-592 has been replaced by F3-649 due to regulating problems |
Tuesday, December 13, 2011, 14:10, Aurelia Laxdal, , , , , , , , Test Stand IOC reboot
|
Evgeniy rebooted the ISAC Test Stand IOC. Re-started EPICS at the Test Stand.
Found all 4 turbo pumps off and their backing valves closed. Re-started the pumps. |
Monday, December 19, 2011, 13:09, Aurelia Laxdal, , , , , , , , Test Stand updates
|
In January Controls will install a new firewall for ISAC Test Stand. Until then ISAC Test Stand can be used, but it may require an IOC reboot once in
while. |
Tuesday, December 20, 2011, 16:09, Anders Mjos, , , , , , , Problems/Solutions, Variable leak valve repaired
|
Anders Mjos wrote:
|
|