Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 13 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  330   Friday, August 30, 2013, 15:09 Anders MjosNiO#2HP-FEBIADITETM339530-639069-4DoneConditioning of NiO#2Friday, August 30, 2013, 15:09 : Turbos
stopped in preparation for installation. 
Friday, August 30, 2013, 16:22: Venting
 2013-09-12_NiO#2_TBHT_jump.PNG 
  333   Monday, September 16, 2013, 17:07 Anders MjosNiO#2HP-FEBIADITETM339530-639069-4DoneConditioning NiO#2 take 2The GE on the Source tray and EE on the
target was cleaned. The target will be conditioned
again to verify if sparking has been reduced.
  
  337   Friday, September 27, 2013, 11:41 Anders MjosTa#41HP-SISITWTM439069-538817-10DoneTa#41 ConditioningFriday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08:
Turbos started
 Ta#41_EE_After_Test_Stand.pdf 
  296   Thursday, April 25, 2013, 13:32 Anders MjosEmptyLP-FEBIAD  Tube Only38307-9 In progressFEBIAD Coil testSame target as in e-log entry https://elog.triumf.ca/TIS/Test-Stand/106
Thursday, April 25, 2013, 13:54:
Roughing
 2014-04-30_FEBIAD_COIL_AWG18.PNG2014-05-01_FEBIAD_COIL_AWG18.PNGTarget_Assembly.pdf 
  106   Tuesday, June 26, 2012, 18:04 Anders MjosFEBIAD anode end cap test   Tube only38307-9In progressFEBIAD anode end cap test - readyTesting FEBIAD anode end cap as per dwg
ITD0304 REV C
Target with TUBE ONLY. Do not use
  
  323   Friday, July 19, 2013, 14:14 Anders Mjos    Tube only38307-9In progressFEBIAD Coil TestFriday, July 19, 2013, 14:14 : Stopping
Turbos. Vacuum at 1.3E-7 T 
Friday, July 19, 2013, 15:14: 
  
  325   Tuesday, August 20, 2013, 08:24 Anders Mjos    Tube only38307-9In progressFEBIAD Coil TestTuesday, August 20, 2013, 08:13: Roughing
gas lines
Tuesday, August 20, 2013, 08:22:
  
  336   Wednesday, September 18, 2013, 16:18 Anders Mjos HP-FEBIAD  Tube only38307-9DoneTest Target - FEBIAD COILWednesday, September 18, 2013, 16:18: Starting
turbos
Wednesday, September 18, 2013, 16:26
  
  408   Friday, October 31, 2014, 14:57 Anders Mjos LP-FEBIAD  Tube only38307-9In progressTestFriday, October 31, 2014, 14:47: Starting
turbos
Friday, October 31, 2014, 14:57:
 test20141103.pngtest20141103-2.png 
  11   Friday, September 23, 2011, 16:42 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8In progressTarget ready to be heatedFriday, September 23, 2011, 16:4: Target
installed and roughing started.
Friday, September 23, 2011, 17:12:
  
  15   Wednesday, September 28, 2011, 16:33 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8In progressHV conditioningStarted the HV conditioning: TSG:BIAS=30kV   
  16   Thursday, September 29, 2011, 09:27 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8In progressHeaters conditioningStarted the heaters conditioning: TGHT
up to 580A and TBHT up to 230A.
  
  17   Friday, September 30, 2011, 18:03 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8DoneFinished testing SiC#26 at the Test StandToday, did a did a mass scan: plotdump-local-clean.txt
Sep30 11 12-20-08.txt
Optimized a bit the tune with Friedhelm,
  
  18   Monday, October 03, 2011, 10:53 Aurelia LaxdalSiC#26HP-FEBIADITETM438295-938307-8DoneTarget is ready to be removed. Turned off the HV and locked up the transformer.
Isolated the ion source box. The target is
under vacuum and the water is still on.
  
  19   Monday, October 03, 2011, 13:56 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneVenting

    

       
            
  
  20   Monday, October 03, 2011, 14:46 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget stored under vacuum

    

       
            
  
  21   Wednesday, October 12, 2011, 13:14 Anders MjosSiC#26HP-FEBIADITETM438295-938307-8DoneTarget removed

    

       
            
  
  3   Wednesday, September 14, 2011, 15:40 Anders MjosTaC#1LP-SISITETM138634-636833-6In progressTaC#1 installed and pumping down.Wednesday, September 14, 2011, 15:39: Vacuum
at 1.3e-5 torr 
Thursday, September 15, 2011, 08:59:
  
  6   Friday, September 16, 2011, 12:39 Aurelia LaxdalTaC#1LP-SISITETM138634-636833-6In progressHV conditioningStarted the HV conditioning: TSG:BIAS=30kV
and TSH:EE=-700V.
  
  7   Monday, September 19, 2011, 09:11 Aurelia LaxdalTaC#1LP-SISITETM138634-636833-6In progressStarted target and tube heaters. Heaters conditioning went fine: 580A and
230A.
Did a mass scan:
  
ELOG V2.9.2-2455