Entry  Friday, August 10, 2012, 11:29, Pierre Bricault, NA, , , , N A, NA, In progress, Test FEBIAD 

The helium bottle was found empty.

Rick will refill it and hook the leak detector on the system to find out

if we have a leak on the line.

 

Entry  Monday, August 13, 2012, 10:59, Pierre Bricault, , , , , , , Problems/Solutions, Test FEBIAD 

This morning I try to contact PS group no one answer. Dan Louie is in vacation.

I went into the can diagnostics panel and reconfigure MB1 power supply.

This worked.

 

Entry  Friday, October 31, 2014, 14:57, Anders Mjos, , LP-FEBIAD, , , Tube only, 38307-9, In progress, Test test20141103.pngtest20141103-2.png

Friday, October 31, 2014, 14:47: Starting turbos

Friday, October 31, 2014, 14:57: Turbos at speed. Vacuum at 2.9E-5 T


Monday, November 03, 2014, 10:08 : Opened HS water circuit. Vacuum stable at 1.7E-7 T

Monday, November 03, 2014, 10:22: Starting auto ramping to 228A on TBHT at 1 A/min

Monday, November 03, 2014, 13:44: Target at temperature. Opening IV4.

Monday, November 03, 2014, 14:45: IV4 closed

Monday, November 03, 2014, 15:00: Starting cool down. 1 A/min 

Entry  Monday, March 01, 2021, 16:13, Fernando Maldonado, , , , , , , Done, Temporary RGA installation EXTorr.PNG

 Monday, March 01, 2021, 16:03: An ExTorr RGA has been installed in the ISAC test stand.

The original SRS 100 is still broken ( e-log 778)

The SRS 100 from the conditioning station will not be available this week.

Entry  Tuesday, May 15, 2012, 16:18, Aurelia Laxdal, SiC#27, HP-SIS, ITE, TM4, , , In progress, Target/Ion source conditioning 

Did the HV conditioning up to 30kV and started to ramp up the heaters to 580A and 230A.

Entry  Tuesday, February 03, 2015, 14:33, Anders Mjos, Empty, LP-SIS, , , , , In progress, Target with new center block and new EE insulator 2015-02-04-1530trace.pngLP-SIS-newCenterBlock_Feb_05_2015.zip

Also with newly installed RGA

Tuesday, February 03, 2015, 14:33: Roughing

Tuesday, February 03, 2015, 15:05: Turbos started

 Tuesday, February 03, 2015, 15:15: Turbos at speed. Vacuum at 3.3E-5 T


Wednesday, February 04, 2015, 13:56: Cooling water on HS circuit on. No response on IG1 or on the RGA (water)


Thursday, February 05, 2015, 09:00: RGA started. Scan 1-100 every 5 min

Thursday, February 05, 2015, 09:02: Opened IV4

Thursday, February 05, 2015, 09:16: Started target heating to 500 / 150 A at 2 / 1 A/min

Thursday, February 05, 2015, 09:24: Opened electrical cage to switch on TGHT PS

Thursday, February 05, 2015, 09:26 : Started target heating to 500 / 150 A at 2 / 1 A/min

Thursday, February 05, 2015, 09:28: BIAS/EZL/EE on and at HV

Thursday, February 05, 2015, 13:21: TGHT voltage limited. Voltage limit increased to 7 V

Thursday, February 05, 2015, 13:53: Continue to 580 A

Thursday, February 05, 2015, 14:25: RGA stopped around 13:34. Started scanning again

Thursday, February 05, 2015, 15:08: Heating to 200 A on TBHT


Friday, February 06, 2015, 10:34: Heating TBHT to 220 A

Friday, February 06, 2015, 11:07: TBHT at 230 A. TGHT at 580 A

Friday, February 06, 2015, 11:50: Cooling down target

Friday, February 06, 2015, 11:56: RGA  off

Friday, February 06, 2015, 11:5: BIAS/EZL/EE off


Tuesday, February 10, 2015, 11:34: BIAS/EZL/EE on. Started heating to 580 / 230 A at 4 / 2 A/min. RGA on


Monday, February 16, 2015, 08:46: BIAS/EZL/EE on

Monday, February 16, 2015, 09:13 : Started heating to 580 / 230 A at 4 / 2 A/min. RGA on

Monday, February 16, 2015, 10:10: Opened isolation valve

Monday, February 16, 2015, 14:23: TGHT was found voltage limiting at 7 V. Increased voltage limit to 7.2 V

Temperature read with digital optical pyrometer. Inside target 1800 - 1900 deg C. Outside 1900 - 2000 deg C

Monday, February 16, 2015, 15:50: Starting cool down


Tuesday, February 17, 2015, 08:30: RGA off

Tuesday, February 17, 2015, 08:32: BIAS/EZL/EE off. Isolation valve closed.

Tuesday, February 17, 2015, 08:34: Turbos off

Tuesday, February 17, 2015, 13:58: Venting

    Reply  Monday, October 03, 2011, 14:46, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target stored under vacuum 

Anders Mjos wrote:

Aurelia Laxdal wrote:

Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.

 Monday, October 03, 2011, 13:45: Venting.

 Monday, October 03, 2011, 14:45

  • Target was visually  inspected and found to be ready to go online.
  • No burn marks found on the 9-pin connectors.
  • Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected
    Reply  Wednesday, October 12, 2011, 13:14, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target removed 

Anders Mjos wrote:

Anders Mjos wrote:

Aurelia Laxdal wrote:

Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.

 Monday, October 03, 2011, 13:45: Venting.

 Monday, October 03, 2011, 14:45

  • Target was visually  inspected and found to be ready to go online.
  • No burn marks found on the 9-pin connectors.
  • Pumping down. Target will be stored under vacuum for now. Target is scheduled to go to Hot Cell on Oct. 20th. Electrical connections (target/tube heater + coil) are not connected

 Wednesday, October 12, 2011, 13:15: Venting

Wednesday, October 12, 2011, 14:15: Target brought back to lab for inspection and final check.

    Reply  Thursday, May 17, 2012, 08:36, Anders Mjos, SiC#27, HP-SIS, ITE, TM4, , , Done, Target removed 

Thursday, May 17, 2012, 08:36: Turbo pumps switched off in preparation of target removal.

Thursday, May 17, 2012, 08:51: Purging cooling lines.

Thursday, May 17, 2012, 08:55: Venting.

Thursday, May 17, 2012, 09:21: Target removed

Entry  Friday, September 23, 2011, 16:42, Anders Mjos, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, In progress, Target ready to be heated 

Friday, September 23, 2011, 16:4: Target installed and roughing started.

Friday, September 23, 2011, 17:12: Started turbo pumps. 

Monday, September 26, 2011, 09:00: Opened up water flow. Vacuum rose from 3e-6 to 3e-5 torr in 30 s. Closed water flow.

Monday, September 26, 2011, 09:00: Venting for leak check.

Monday, September 26, 2011, 10:20: Pressurized water lines with 120 PSI He. Leak detected on right water line connection to heat shield.

Monday, September 26, 2011, 12:00: Leak repaired. Pumping down. Kapton added on target  heater cooling line to prevent short with cooling line for FEBIAD coil.

Monday, September 26, 2011, 12:47: Started turbo pumps. 

Monday, September 26, 2011, 15:45: Opened up water flow. Vacuum stable at 3.5e-6 torr.Target ready to be heated.

    Reply  Thursday, October 13, 2011, 15:42, Anders Mjos, Training , HP-FEBIAD, , , , , Problems/Solutions, Target ready to be heated 

Rick Maharaj wrote:

test stand vented

 Thursday, October 13, 2011, 15:40: Pumping down

Friday, October 14, 2011, 10:00: Cooling water is on. Pressure increase from 8e-7 to 3e-6 torr. Venting.

Friday, October 14, 2011, 11:10: Replaced seals on cooling lines with new silver plated SS seals. Pumping down.

Friday, October 14, 2011, 13:25: Cooling water is on. Vacuum at 1.35e-6 torr.

Monday, October 17, 2011, 09:00: Vacuum at 5.4e-7 torr. target ready to be heated.

Entry  Thursday, May 31, 2012, 15:43, Anders Mjos, Ta#38, LP-SIS, ITW, TM1, , , In progress, Target ready to be heated 

Thursday, May 31, 2012, 15:42: Roughing

Thursday, May 31, 2012, 16:01 : Starting turbos

Thursday, May 31, 2012, 16:08 : Turbos at speed. Vacuum 1.7 E-5

Friday, June 01, 2012, 08:08: Cooling water opened. Vacuum stable at 5.7E-7. Target ready to be heated and biased.

    Reply  Friday, October 26, 2012, 08:29, Anders Mjos, TiC#3, LP-SIS, ITW, TM1, , , Done, Target ready for conditioning 

Anders Mjos wrote:

Thursday, October 25, 2012, 13:00: Roughing

Thursday, October 25, 2012, 13:19 : Turbos on

Thursday, October 25, 2012, 13:28 : Turbos at speed

Thursday, October 25, 2012, 13:29 : Vacuum at 1.6E-5 T

 Friday, October 26, 2012, 08:29: Opened water. Vacuum stable at 1.8E-7 T

Entry  Monday, October 03, 2011, 10:53, Aurelia Laxdal, SiC#26, HP-FEBIAD, ITE, TM4, 38295-9, 38307-8, Done, Target is ready to be removed.  

Turned off the HV and locked up the transformer. Isolated the ion source box. The target is under vacuum and the water is still on.

Entry  Friday, January 11, 2013, 11:02, Anders Mjos, RFQ empty, , , , , , , Target installed, pumping down 

Target installed with 120 in lbs torque on target legs and on central support.

Friday, January 11, 2013, 11:01: Roughing

Friday, January 11, 2013, 11:25: Start turbos - SR

Friday, January 11, 2013, 11:34: turbos at speed - SR

Friday, January 11, 2013, 11:35: vacuum at 1.2E-5T - SR

 

Entry  Wednesday, January 16, 2013, 01:06, Sebastian Raeder, RFQ empty, , , , , , , Target installed - pumping down 

RFQ empty target installed

Wednesday, January 16, 2013, 01:05: roughing started

Wednesday, January 16, 2013, 01:34: turbos started

Wednesday, January 16, 2013, 01:43: turbos at speed

Wednesday, January 16, 2013, 01:44: vacuum at 1.7E-5T

Entry  Thursday, August 16, 2012, 16:56, Anders Mjos, , , , , , , Problems/Solutions, Target heater PS disconnected from controls. 

As per Ray Dube for the FEBIAD anode bias test. The PS will need to be reconnected before a target is run.

Entry  Wednesday, January 25, 2017, 14:57, Aaron Schmidt, , , , , 42218-11, 41751-6, Done, Target cleaning test LP-SIS Full Clean LP-SIS_Full_Clean.docxOMEGA_OM-DAQPRO-5300_15-Feb-17_13.30.42.dlpTS-2017-02-09-10-40.rga

Target Test (Fully Cleaned vs Crystal Clean only).

For all tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.

-Start Roughing by 10:10am +/- 1 minute.

-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A

ALL START TIMES MUST BE CONSISTENT.


***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.


HP-SIS Target # 42218-11: Full Clean. Crystal Clear, Acetone, & Methanol used.


Thursday, February 09, 2017, 09:44: HS removed from test stand. Exchange target.

Thursday, February 09, 2017, 10:04: Target # 42218-11 placed into test stand. Door open for 20 minutes.

Thursday, February 09, 2017, 10:10: Roughing.

 Thursday, February 09, 2017, 10:10: Doors sealed for roughing.

Thursday, February 09, 2017, 10:11: BV1B OPEN. Opened @ 428T.

Thursday, February 09, 2017, 10:29: Both Turbo pumps started.

Thursday, February 09, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.

Thursday, February 09, 2017, 10:37: TP1A @ speed 38 KRPM.

Thursday, February 09, 2017, 10:40: RGA on. Vacuum @ 1.45E-05T.

Thursday, February 09, 2017, 10:47: Strip tool Vacuum.Current restarted.

Thursday, February 09, 2017, 15:34: Check. Vacuum @ 3.97E-07T.

***NOTE: Small water anomaly on RGA affecting Vacuum***


***NOTE: Small water anomaly on RGA affecting Vacuum*** Continues. Monitor through heating.

Friday, February 10, 2017, 08:06: Water lines opened. No response on RGA. Vacuum stable @ 3.24E-07T.

Friday, February 10, 2017, 08:08: Power/Sources on.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.4 4.02
 TBHT 24.2 3.22
 COIL + EE 24.2 5.26
 TGHT  24.4 5.90

08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

10:00: Check. Vacuum @ 3.68-4.87E-07T. (Anomaly variant)

11:40: Check. Vacuum @ XE-07T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 34.6 4.12
 TBHT 25.5  3.21
 COIL + EE  25.5 5.29
 TGHT

 27.3

 5.88

Check. Vacuum @ 4.41E-07T.

 Auto-cooling started @ 2A per min. Vacuum @ 4.25E-07T.


Tuesday, February 14, 2017, 08:22: Power/sources off.

Tuesday, February 14, 2017, 08:23: Water lines purged.

Tuesday, February 14, 2017, 08:26: RGA off. Ion Gauge off. Turbo pumps off.

Entry  Wednesday, January 25, 2017, 14:56, Aaron Schmidt, , , , , 42218-14, 41751-6, Done, Target cleaning test LP-SIS CC Clean LP-SIS_CC_Clean.docxTS-2017-02-07-10-40.rgaOMEGA_OM-DAQPRO-5300_09-Feb-17_10.49.31.dlp

Target Test (Fully Cleaned vs Crystal Clean only).

For all tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.

-Start Roughing by 10:10am +/- 1 minute.

-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A

ALL START TIMES MUST BE CONSISTENT.


***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.


LP-SIS Target # 42218-14: Crystal Clean only.


Tuesday, February 07, 2017, 09:48: HS removed from test stand. Exchange target.

Tuesday, February 07, 2017, 10:07: Target # 42218-14 placed into test stand. Door open for 19 minutes.

Tuesday, February 07, 2017, 10:10: Roughing.

Tuesday, February 07, 2017, 10:10: Doors sealed for roughing.

Tuesday, February 07, 2017, 10:11: BV1B OPEN. Opened @ 430T.

Tuesday, February 07, 2017, 10:29: Both Turbo pumps started.

Tuesday, February 07, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.

Tuesday, February 07, 2017, 10:37: TP1A @ speed 38 KRPM.

Tuesday, February 07, 2017, 10:39: RGA on. Vacuum @ 1.49E-05T.

Tuesday, February 07, 2017, 15:30: Check. Vacuum @ 3.26E-07T.


Wednesday, February 08, 2017, 08:12: Water lines opened. No response on RGA. Vacuum stable @ 1.29E-07T.

Wednesday, February 08, 2017, 08:14 : Power/Sources on.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 20.8 4.06
 TBHT 20.5 3.17
 COIL + EE 20.6 5.27
 TGHT  20.7 5.88

Wednesday, February 08, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.

Wednesday, February 08, 2017, 10:00: Check. Vacuum @ 3.33E-07T.

Wednesday, February 08, 2017, 11:40: Check. Vacuum @ 1.70E-07T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 30.2 4.06
 TBHT 21.0  3.17
 COIL + EE  21.1 5.22
 TGHT

 21.3

 5.82

Wednesday, February 08, 2017, 13:30: Check. Vacuum @ 3.53E-07T.

Wednesday, February 08, 2017, 15:30: Auto-cooling started @ 2A per min. Vacuum @ 3.88E-07T.

***NOTE: Small water anomaly on RGA affecting Vacuum***


***NOTE: Small water anomaly on RGA affecting Vacuum continues***

Thursday, February 09, 2017, 08:08: Sources/power off.

Thursday, February 09, 2017, 08:10: Water lines purged.

Thursday, February 09, 2017, 08:11: RGA off.

Thursday, February 09, 2017, 09:00: Venting

Entry  Monday, July 17, 2017, 10:04, Aaron Schmidt, , HP-SIS, , , 42218-10, 42738-1, , Target cleaning test HP-SIS Full Clean  HP-SIS_Full_Clean_(Short).docxTS-2017-07-27-10-40.rga

 Target Test (Fully Cleaned vs Crystal Clean only).

For all tests:

-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.

- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.

-Start Roughing by 10:10am +/- 1 minute.

-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A

ALL START TIMES MUST BE CONSISTENT.


***Pre-outgassed*** Heat Shield W.O# 42738-1: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.


HP-SIS Target # 42218-10: Full Clean. Crystal Clear, Acetone, & Methanol used.


Thursday, July 27, 2017, 09:49: HS removed from test stand. Exchange target.

Thursday, July 27, 2017, 10:07: Target # 42218-10 placed into test stand. Door open for 20 minutes.

Thursday, July 27, 2017, 10:10: Roughing.

Thursday, July 27, 2017, 10:10: Doors sealed for roughing.

Thursday, July 27, 2017, 10:13 BV1B OPEN. Opened @ 230T.

Thursday, July 27, 2017, 10:29: Both Turbo pumps started.

Thursday, July 27, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.

Thursday, July 27, 2017, 10:37: TP1A @ speed 38 KRPM.

Thursday, July 27, 2017, 10:40: RGA on. Vacuum @ 1.42T.

Thursday, July 27, 2017,15:00: Check. Vacuum @ 5.51e-07T.

Thursday, July 27, 2017, 15:02: Waterlines opened. No response on RGA. Vacuum @ 5.42e-07T

Thursday, July 27, 2017, 15:05: Power on.


Friday, July 28, 2017, 08:30: Ramping started


Monday, July 31, 2017, 07:56: Ramping down

Monday, July 31, 2017, 14:25: Power supplies off. RGA off.


Tuesday, August 15, 2017, 06:48: Ion gauge, Turbo pumps off.

Tuesday, August 15, 2017, 06:50: power off. Waterlines purged.

Tuesday, August 15, 2017, 07:55: Venting.