665
|
Monday, June 04, 2018, 16:02 |
Anders Mjos | | | | | | | Problems/Solutions | MB1 timeout | Mass separator magnet timed out. Tried
reconfigure. Called Kyle from controls who
power cycled the CANbus card. This resolved |
|
|
666
|
Wednesday, June 06, 2018, 14:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | Emittance scanner (E-rig) communication issues. | Wednesday, June 06, 2018, 13:50:
It was noted yesterday during the
TM2 Source HV tests that the E-rig was not |
|
|
667
|
Thursday, June 07, 2018, 09:21 |
Aaron Schmidt | | | | | | | Problems/Solutions | Pump down empty chamber. Anode check | TM2 Source tray still in.
Thursday, June 07, 2018, 09:20: Roughing.
Thursday, June 07, 2018, 12:42: Turbo |
|
|
677
|
Friday, August 10, 2018, 10:56 |
Aaron Schmidt | | | | | | | Problems/Solutions | New PS installation and Cathode BIAS set | Friday, August 10, 2018, 10:25: Remove
TBHT 500 PS and replace with TBHT 600 PS.
Friday, August 10, 2018, 10:50: Switch |
|
|
679
|
Tuesday, August 21, 2018, 12:54 |
Anders Mjos | | | | | | | Problems/Solutions | 9-pin connection configuration | Pin configuration between top 9-pin connector
on Source Tray and terminal in high voltage
rack. Measured 2018-08-21 by Aaron and Anders |
|
|
682
|
Friday, August 31, 2018, 10:16 |
Aaron Schmidt | | | | | | | Problems/Solutions | RGA connection loss. | Friday, August 31, 2018, 10:10: The RGA
will not re-connect to the computer. Manually
turned it off while under vacuum to protect |
|
|
689
|
Monday, October 15, 2018, 14:38 |
Aaron Schmidt | | | | | | | Problems/Solutions | Anode / Cathode PS to Negative | Monday, October 15, 2018, 13:00-14:00 Anode
/ Cathode BIAS PS polarity reversed by John
Chow. |
|
|
692
|
Monday, October 29, 2018, 10:56 |
Aaron Schmidt | | LP-FEBIAD | | | 41790-9 | 42752-5 | Problems/Solutions | TS communications issues. | Sometime around 00:30 Sunday, October 28,
2018, the ISAC test stand lost communication
to the PLC and shut down abruptly. |
|
|
697
|
Monday, November 19, 2018, 14:22 |
Aaron Schmidt | | | | | | | Problems/Solutions | Vacuum issues. |
Normal
0
|
|
|
698
|
Wednesday, December 05, 2018, 10:22 |
Aaron Schmidt | | | | | | | Problems/Solutions | RGA Filament & Ionizer replacement | RGA Ionizer & Filament replaced as
per SRS RGA manual.
The ionizer was found to be dirty |
12x |
|
699
|
Thursday, December 06, 2018, 11:02 |
Aaron Schmidt | | | | | | | Problems/Solutions | FC0 Bellows Replacement. | Thursday, December 06, 2018, 11:02: Turbo
pumps (TP6 & TP2) off on beamline side.
IG6 off. |
|
|
711
|
Thursday, March 07, 2019, 07:55 |
Aaron Schmidt | | LP-FEBIAD | | | | | Problems/Solutions | TS restart - Troubleshoot BIAS spark | Thursday, March 07, 2019, 07:48: IV4 reset,
BV6 & TMS TP6 reset.
Turbo pump restarted. |
|
|
714
|
Tuesday, March 26, 2019, 10:44 |
Aaron Schmidt | | | | | | | Problems/Solutions | EZL PS replaced. Test | EZL checked. OK @ 5kV
BIAS PS issues.
2.3kV on screen. Read back on PS |
|
|
715
|
Wednesday, March 27, 2019, 11:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | BIAS PS replaced. Test | Wednesday, March 27, 2019, 10:25: BIAS
@ 1 kV
952V - 548uA on controls readback |
|
|
726
|
Monday, June 03, 2019, 11:35 |
Aaron Schmidt | | LP-SIS | | TM4 | 395530-3 | 42752-5 | Problems/Solutions | TGHT PS Failed. | Monday, June 03, 2019, 10:36: BIAS Near
55 kV, brought back down to 50 kV. Multiple
sparks. Optics tripped, wire scanners & |
|
|
736
|
Monday, June 24, 2019, 15:41 |
Fernando Maldonado | | | | | | | Problems/Solutions | TMS:Q3 polarity | Monday, June 24, 2019, 15:25: Current quadrupole
polarities:
|
|
|
737
|
Tuesday, June 25, 2019, 17:19 |
Fernando Maldonado | | | | | | | Problems/Solutions | Burnt cables on top of the test stand | Tuesday, June 25, 2019, 16:15: While inspecting
the 9-pin connection with Ferran, it was
noticed how two braided cables were burnt |
|
|
739
|
Wednesday, June 26, 2019, 14:41 |
Carla Babcock | none | | | | | | Problems/Solutions | Issues with test stand wiring in service cap area | The wiring on the top of the test stand
was burned, see entry 737.
Probable cause of this is as follows: |
|
|
740
|
Thursday, June 27, 2019, 09:51 |
Fernando Maldonado | | | | | | | Problems/Solutions | Melted cables changed | See elog 737
|
|
|
743
|
Thursday, July 04, 2019, 15:16 |
Aaron Schmidt | | | | | | | Problems/Solutions | TBHT insulator changed | Thursday, July 04, 2019, 15:00: TBHT insulator
was swapped out on the source tray side.
|
|