  272   Thursday, January 17, 2013, 08:16 Sebastian RaederRFQ empty     In progressheatingThursday, January 17, 2013, 08:16: started
heating of the target, vacuum at 2.6E-7T
 Thursday, January 17, 2013,
  
  273   Friday, January 18, 2013, 11:28 Sebastian RaederRFQ empty      stop turbosFriday, January 18, 2013, 11:28: turbos
stopped
  
  276   Friday, January 18, 2013, 16:17 Anders MjosRFQ empty     In progressheating 

    
 Test_Stand_cooling_temp_data_2013-01-16.pdfTest_Stand_strip_tool_TGHT_CUR_2013-01-16.PNG 
  872   Wednesday, April 28, 2021, 22:34 Luca EgoritiP2N test - Apr 2021P2N-SISITETM4  In progressP2N heating test Wednesday, April 28, 2021, 22:30
First P2N heating test ongoing.
At P2NHT ~ 570 A and TBHT ~ 100 A
 Target_580A_100A_glowing.jpgInitial_rampup.PNG 
  734   Friday, June 21, 2019, 15:12 Aaron SchmidtP2N - 1      P2N - 1 - 2019Friday, June 21, 2019, 14:48: Roughing.
Friday, June 21, 2019, 15:18: Turbo
pumps on.
  
  742   Thursday, July 04, 2019, 15:15 Aaron SchmidtP2N - 1      P2N - 1 - 2 - 2019Screws instead of rivets on target leg.
Insulator changed.
Thursday, July 04, 2019, 15:14: Roughing
  
  748   Sunday, July 28, 2019, 14:22 Luca EgoritiP2N - 1HP-FEBIADITETM2p2n - test1p2n - test1Problems/Solutionsp2n heating test 3Friday. July 26th 2019 
A new electrical configuration of
the test stand was decided and installed.
 20190728_-_p2n_heating_3.PNG 
  749   Tuesday, July 30, 2019, 12:19 Luca EgoritiP2N - 1HP-FEBIADITETM2  Problems/Solutionsp2n heating test - target inspectionThe p2n target was taken out of the test
stand for inspection. Comments and measurements
on the container below:
 IMG_20190730_110927.jpgIMG_20190730_113437.jpgIMG_20190730_105629.jpg 
  750   Friday, August 02, 2019, 13:16 Aaron SchmidtP2N - 1     In progressp2n heating test 4Friday, August 02, 2019: p2n target installed
in the test stand, the ion source was fully
removed to avoid any risk of shorting. The
  
  751   Wednesday, August 07, 2019, 08:18 Luca EgoritiP2N - 1 ITETM2  Problems/Solutionsp2n heating test 4Tuesday, August 06, 2019, 16:00
Start ramp up to 300+300 = 600 A
 
 IMG_20190806_182939.jpgIMG_20190806_182953.jpg 
  745   Monday, July 15, 2019, 15:59 Fernando MaldonadoP2N     DoneRe-wiring on service cap.Monday, July 15, 2019, 15:54 : TBHT high
current cables moved to Coil feedthroughs.
Coil high current cables moved to
  
  746   Tuesday, July 16, 2019, 10:28 Fernando MaldonadoP2N      P2N 1200 A testTuesday, July 16, 2019, 10:27: The idea
of this run is to have the full 600 A from
TGHT and the full 600 A from TBHT.
  
  76   Wednesday, April 18, 2012, 13:10 Anders MjosNo target     In progressPumping down empty vacuum chamberWednesday, April 18, 2012, 13:10: Roughing
the vacuum chamber.
Wednesday, April 18, 2012, 13:34
  
  330   Friday, August 30, 2013, 15:09 Anders MjosNiO#2HP-FEBIADITETM339530-639069-4DoneConditioning of NiO#2Friday, August 30, 2013, 15:09 : Turbos
stopped in preparation for installation. 
Friday, August 30, 2013, 16:22: Venting
 2013-09-12_NiO#2_TBHT_jump.PNG 
  333   Monday, September 16, 2013, 17:07 Anders MjosNiO#2HP-FEBIADITETM339530-639069-4DoneConditioning NiO#2 take 2The GE on the Source tray and EE on the
target was cleaned. The target will be conditioned
again to verify if sparking has been reduced.
  
  180   Thursday, August 23, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  In progressNiO#1 installedThursday, August 23, 2012, 11:38: NiO#1
installed.
Thursday, August 23, 2012, 11:38:
  
  182   Friday, August 24, 2012, 08:28 Anders MjosNiO#1HP-FEBIADITETM4  DoneNiO#1 installed

    

       
            
  
  183   Monday, August 27, 2012, 13:21 Aurelia LaxdalNiO#1HP-FEBIADITETM4  In progressHV conditioning at Test Stand Did HV conditioning up to TSG:BIAS=30kV,
TSH=EE=-600V
Turned off the HV for Kazuya to check
  
  191   Friday, August 31, 2012, 11:39 Anders MjosNiO#1HP-FEBIADITETM4  DoneVenting vacuum chamber - source changeFriday, August 31, 2012, 11:39: Stopped
turbos.
Friday, August 31, 2012, 13:06: Venting.
  
  817   Tuesday, October 27, 2020, 08:54 Aaron SchmidtNb#9 LP-SISITWTM244508-243515-4In progressNb#9 ConditioningTuesday, October 27, 2020, 08:40: Roughing.
Tuesday, October 27, 2020, 09:13:
TP1B on.
 Nb#9_Conditioning.docxER-580-230-30kV-M133.txtER-580-230-30kV-M23.txt 