Aaron Schmidt | | | | TM4 | 395530-3 | 42752-5 | Done | TMS:TP6 Turbo pump issue. (Ok now) | Monday, June 03, 2019, 14:09:
Turbo pump TMS:TP6 was making a loud hum / buzz sound. The vacuum pressure is steadily increasing on IG6. Edi Contacted. Turbo pump likely failing.
The sound tapered off.
Monday, June 03, 2019, 14:32: Sound was the turbo pump spinning down. Edi restarted & reset the main controller. It was knocked out by one of the morning sparks.
|
731
|
Tuesday, June 11, 2019, 14:33 |
Aaron Schmidt | Test FEBIAD | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | ISAC Source tray re-installed w/ optics tray. | Tuesday, June 11, 2019, 14:33: Roughing.
Wednesday, June 12, 2019, 08:18: Venting to install FEBIAD.
Wednesday, June 12, 2019, 09:13: LP-FEBIAD installed. Roughing.
Wednesday, June 12, 2019, 11:13: Turbo pumps on.
Wednesday, June 12, 2019, 11:21: Ion gauge on.
Wednesday, June 12, 2019, 11:48: RGA re-connected & switched on.
Thursday, June 13, 2019, 10:27:
He Leak TEST:
Vacuum Group Leak detector LD#4.
Thursday, June 13, 2019, 10:28: Vacuum @ 1.60e-06T
LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec
Thursday, June 13, 2019, 10:35: LD baseline after opening valve to turbo pumps: 1.2e-09 atm-cc/sec
Full open base:
Vacuum @ 1.60e-06T. RGA status:
Water: 2.20e-006
He: 4.55e-010
LD: 1.2e-09 atm-cc/sec
Thursday, June 13, 2019, 10:35:
Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 10:40 Vacuum @ 1.54e-06T . RGA status:
Water: 2.20e-006
He: 4.20e-010
LD: 0.1e-09 atm-cc/sec. Purge and close FS#2.
Thursday, June 13, 2019, 10:45: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 10:50: Vacuum @ 1.52e-06T. RGA status:
Water: 2.18e-006
He: 3.68e-010
LD: 0.7e-09 atm-cc/sec. Purge and close FS#3.
Thursday, June 13, 2019, 10:50: Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 10:55: Vacuum @ 1.54e-06T. RGA status:
Water: 2.16e-006
He: 9.24e-011
*LD: 3.7e-09 atm-cc/sec. Run for another 5 minutes.
Thursday, June 13, 2019, 11:00: Vacuum @ 1.52e-06T. RGA status:
Water: 2.15e-006
He: 2.06e-010
*LD: 0.7e-08 atm-cc/sec. Potential He escaping through o-rings*
Purge and close FS#4.
Thursday, June 13, 2019, 11:01: Open line FS#5 . Pressurize to 30 PSI. Record after 5 minutes
Thursday, June 13, 2019, 11:06: Vacuum @ 1.52e-06T. RGA status:
Water: 2.13e-006
He: 2.75e-010
LD: 1.7e-08 atm-cc/sec. Purge and close FS#5
Thursday, June 13, 2019, 11:07: Depressurize lines. Connect HPA & Purge all lines.
Thursday, June 13, 2019, 11:12: Vacuum @ 1.54e-06T . RGA status:
Water: 2.12e-006
He: 6.21e-010
LD: 3.3e-08 atm-cc/sec
Close Valve & disconnect LD. HE LEAK TEST COMPLETE
Thursday, June 13, 2019, 11:20: Vacuum @1.52e-06T :Begin gradually opening the waterlines.
Thursday, June 13, 2019, 11:22: Open FS#2. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:23: Open FS#3. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:23: Open FS#4. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:24: Open FS#5. Vacuum @ 1.52e-06T. No Response on RGA.
Thursday, June 13, 2019, 11:28: Power sources: Tested. TGHT PS is still a no go. Power switched off, lock out.
Thursday, June 13, 2019, 14:03: New TGHT PS installed.
Thursday, June 13, 2019, 14:06: Power / sources on.
Thursday, June 13, 2019, 14:20: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :)
Thursday, June 13, 2019, 14:21: Spark*
Thursday, June 13, 2019, 14:29: Sources to 0 kV. FS#8 needs re-connection.
Thursday, June 13, 2019, 14:43: FS#8 connected. Vacuum ok @ 1.52e-06T. No response on RGA.
Thursday, June 13, 2019, 14:45: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Friday, June 14, 2019, 06:52: Restart RGA.
Friday, June 14, 2019, 08:37: Run mini pump to prep gas-lines.
Friday, June 14, 2019, 08:44: Close SV1, manual valve & turn off mini pump. Gradually open gas lines.
Friday, June 14, 2019, 08:48: Gas lines fully opened.
Friday, June 14, 2019, 08:49: Auto-ramping TGHT / TBHT to 570 / 270 A @ 2 A per min.
Friday, June 14, 2019, 08:52: HV sources ready.
FM
Friday, June 14, 2019, 11:11: Anode current @ 0V 7.326mA. Setting Anode to 150 V.
AS
Friday, June 14, 2019, 11:16: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Friday, June 14, 2019, 11:18: Optics set.
Friday, June 14, 2019, 11:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.
Friday, June 14, 2019, 14:39: Multiple wire scans attempted since 1pm. Controls & Diagnostics contacted. Ongoing troubleshooting.
Monday, June 17, 2019, 08:34: TMS:MB1 - Reset.
Monday, June 17, 2019, 09:18: Auto-ramping TBHT to 310 A @ 2 A per min.
FM
Monday, June 17, 2019, 10:30: TBHT manually tapped to 320 A ~2A/min
Tuesday, June 18, 2019, 18:42 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.
Tuesday, June 18, 2019, 18:43: Begin auto-cooling @ 2A per min.
AS
Wednesday, June 19, 2019, 07:10: IV4 Closed.
Wednesday, June 19, 2019, 07:12: Gas lines & Sources / power off.
Wednesday, June 19, 2019, 07:15: RGA off.
Wednesday, June 19, 2019, 07:16: IG1 & Turbo pumps off.
Wednesday, June 19, 2019, 08:35: Purging / venting. |
543
|
Friday, September 30, 2016, 11:11 |
Aaron Schmidt | SiC#35 | HP-FEBIAD | ITW | TM2 | 39530-9 | 41120-8 | Done | Conditioning SiC#35 | Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01: Roughing stopped. RP1 failure. Breaker tripped.
Friday, September 30, 2016, 11:49: Roughing continued.
Friday, September 30, 2016, 12:37: Turbos started -AM
Monday, October 03, 2016, 09:00: RGA on.
Monday, October 03, 2016, 09:05: Waterline opened. No response on RGA. Vacuum stable @1.70E-7T.
Monday, October 03, 2016, 09:20: Power/Sources on. Gas sources opened/closed.
Monday, October 03, 2016, 09:39: Optics switched on. Monitor TMS:SX2
Monday, October 03, 2016, 09:47: Anode on @ 200 V
Monday, October 03, 2016, 09:49: Coil on @ 50A
Monday, October 03, 2016, 09:50: IV4 opened.
Monday, October 03, 2016, 09:58: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, October 03, 2016, 10:08: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Monday, October 03, 2016, 10:12
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.0 |
3.99 |
TBHT |
27.5 |
3.21 |
COIL + EE |
26.8 |
5.26 |
TGHT |
26.9 |
5.78 |
Monday, October 03, 2016, 11:09: TMS:SX2 Fixed. No optics or sources affected.
Monday, October 03, 2016, 11:38: BIAS @ 30 kV. (Was actually set to 20 kV before). Ramping progress ok.
Monday, October 03, 2016, 15:56: TGHT / TBHT @ 580 / 290 A. RGA restarted.
Wednesday, October 05, 2016, 08:29: Optics found to be tripped : TMS:OCT4 , TMS:Q4 ,TMS:OCT3 ,TMS:SX3 ,TMS:Q3 ,TMS:SX2. Restarted
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.3 |
3.99 |
TBHT |
29.9 |
3.14 |
COIL + EE |
28.8 |
5.07 |
TGHT |
30.8 |
5.72 |
Wednesday, October 05, 2016, 09:20: Wire scanners reset. Emittance rig not reading properly.
Wednesday, October 05, 2016, 09:22: Auto ramping TBHT to 300 A @ 2A per min.
Thursday, October 06, 2016, 15:58: Auto-cooling TGHT / TBHT @ 2A per min.
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.4 |
3.95 |
TBHT |
29.4 |
3.09 |
COIL + EE |
28.8 |
5.05 |
TGHT |
30.8 |
5.70 |
Friday, October 07, 2016, 08:12: Source off - AM
Tuesday, October 11, 2016, 08:28: Turbos off. RGA off -AM
Tuesday, October 11, 2016, 13:38: Venting -AM |
330
|
Friday, August 30, 2013, 15:09 |
Anders Mjos | NiO#2 | HP-FEBIAD | ITE | TM3 | 39530-6 | 39069-4 | Done | Conditioning of NiO#2 | Friday, August 30, 2013, 15:09 : Turbos stopped in preparation for installation.
Friday, August 30, 2013, 16:22: Venting
Friday, August 30, 2013, 17:08: Roughing with NiO#2
Friday, August 30, 2013, 17:27: Starting turbos
Friday, August 30, 2013, 17:35: Turbos at speed
Friday, August 30, 2013, 17:37: Vacuum at 1.9 E-7 T
Monday, September 09, 2013, 14:04: Opened up water. Vacuum stable at 1.5E-7 T
Tuesday, September 10, 2013, 08:59: Pumping out the gas lines.
Tuesday, September 10, 2013, 09:10: Gas lines evacuated.
Tuesday, September 10, 2013, 09:23: TPS:IV4 opened
Tuesday, September 10, 2013, 10:06: TGHT PS was off. Debiased to access el cage.
Tuesday, September 10, 2013, 10:07: EZL/EE/BIAS: 15/2/30 kV 61/674/55 uA
Tuesday, September 10, 2013, 10:08: COIL/ANODE: 50A/200V
Tuesday, September 10, 2013, 10:09: Started target heat to TGHT/TBHT 250/230A
Tuesday, September 10, 2013, 15:12: Started target heat to TGHT 350A (TBHT remains at 230A)
Wednesday, September 11, 2013, 13:06: Heating TGHT to 500A
Thursday, September 12, 2013, 08:44: Heating TGHT to 580A
Thursday, September 12, 2013, 09:39: Heating TBHT to 260A
Thursday, September 12, 2013, 10:06: BIAS sparking occurred at 9:48 TBHT:RDCUR at 256A. Gradually reduced TBHT:RDCUR to 254A. Sparking stopped after ~20 min. ANODE:RDCUR, EE:RDCUR and IG1:RDVAC showed correlated sparking responses. ANODE:RDCUR went to 0 mA and back up after sparking had stopped.
Thursday, September 12, 2013, 10:30: Manually increased TBHT:RDCUR to 260A.
Thursday, September 12, 2013, 11:06: A jump in TBHT:RDVOLT and TBHT:RDCUR at 10:44. Reduced TBHT:RDCUR to 255A
Thursday, September 12, 2013, 12:10: TPS:Q4 was taken out by a spark. Restarted.
Thursday, September 12, 2013, 12:19: EZL to 13 kV
Thursday, September 12, 2013, 13:14: TBHT:RDCUR to 260A
Thursday, September 12, 2013, 13:31: TBHT:RDCUR to 265A. Sparking returns. Lower to 260A
Friday, September 13, 2013, 10:51: Increased TBHT:RDCUR to 265A
Friday, September 13, 2013, 10:58 : Increased TBHT:RDCUR to 270A
Friday, September 13, 2013, 11:05: Some sparking. Lowered EE to 1kV
Friday, September 13, 2013, 11:07 : Increased TBHT:RDCUR to 275A
Friday, September 13, 2013, 11:15 : Increased TBHT:RDCUR to 280A
Friday, September 13, 2013, 11:24 : Increased TBHT:RDCUR to 290A. ANODE:RDCUR 8.5mA. FC0 1.3E-6 A
Friday, September 13, 2013, 11:53: SV5 and SV2 gas lines opened.
Friday, September 13, 2013, 12:05: A spark took out Q4. Restarted.
Friday, September 13, 2013, 12:07: Lowered TBHT:RDCUR to 285A
Friday, September 13, 2013, 13:03: Started mass scan.
Friday, September 13, 2013, 14:27: Lowered TBHT:RDCUR to 280A
Friday, September 13, 2013, 15:01 : Lowered TBHT:RDCUR to 270A
Monday, September 16, 2013, 08:00: Mass scan started.
Monday, September 16, 2013, 09:00: Starting heater ramp down. 2A/min. Gas lines closed.
Monday, September 16, 2013, 13:30: Source off. Target debiased.
Monday, September 16, 2013, 13:56: Turbos stopped
Monday, September 16, 2013, 14:50: Venting. |
333
|
Monday, September 16, 2013, 17:07 |
Anders Mjos | NiO#2 | HP-FEBIAD | ITE | TM3 | 39530-6 | 39069-4 | Done | Conditioning NiO#2 take 2 | The GE on the Source tray and EE on the target was cleaned. The target will be conditioned again to verify if sparking has been reduced. Torque 120 in lbs
Monday, September 16, 2013, 17:05: Roughing. The roughing pump is somewhat noisy.
Monday, September 16, 2013, 17:26: Starting turbos.
Monday, September 16, 2013, 17:34: Turbos at speed
Monday, September 16, 2013, 17:36: Vacuum at 3.8E-5 T.
Tuesday, September 17, 2013, 08:10: Opened cooling water. Vacuum stable at 6.5E-7. EE flow 4.8 l/min 27.9 C
Tuesday, September 17, 2013, 08:20: Target biased: 30kV, 15kV, -1kV.
Tuesday, September 17, 2013, 08:25: Opening gas line SV5 and Ne SV3 evacuated
Tuesday, September 17, 2013, 08:32: Started auto-ramping to 580A/230A
Tuesday, September 17, 2013, 08:34: Coil to 50A, Anode to 200V (0mA)
Tuesday, September 17, 2013, 08:36: Opened IV4
Tuesday, September 17, 2013, 10:39: EE flow 4.9 l/min 28.5 C
Tuesday, September 17, 2013, 13:05: EE flow 4.9 l/min 28.8 C
Tuesday, September 17, 2013, 15:03: EE flow 4.9 l/min 28.8 C
Tuesday, September 17, 2013, 15:04 :TGHT at 580A, TBHT at 280A.
Tuesday, September 17, 2013, 15:30: TBHT:RDCUR to 290A
Wednesday, September 18, 2013, 08:07: Stared mass scan.
Wednesday, September 18, 2013, 08:08:EE flow 4.9 l/min 28.8 C
Wednesday, September 18, 2013, 09:14: EE to 2kV. Current at 676 uA
Wednesday, September 18, 2013, 09:23: Opened He gas to 6.0. It was later found the SV2 was closed. I.e. no He was supplied to the target.
Wednesday, September 18, 2013, 09:26: Tuning source. EE 0.8kV, EZL 1.3kV
Wednesday, September 18, 2013, 09:32: Started mass scan.
Wednesday, September 18, 2013, 09:55: A jump in BIAS current from 42 to 61 uA. Came down towards 42 after 30 min
Wednesday, September 18, 2013, 10:22: Ramping down heaters at 2A and 2.5A /min
Wednesday, September 18, 2013, 10:23: He and Ne off.
Wednesday, September 18, 2013, 10:48: Gas lines closed.
Wednesday, September 18, 2013, 10:53: EE flow 4.9 l/min 28.5 C
Wednesday, September 18, 2013, 10:55: IV4 closed.
Wednesday, September 18, 2013, 10:59: Target de-biased.
Wednesday, September 18, 2013, 12:18: Heaters off.
Wednesday, September 18, 2013, 12:18: Stopped turbos.
Wednesday, September 18, 2013, 12:56: Started wenting.
Wednesday, September 18, 2013, 13:02: EE flow 4.9 l/min 28.2 C
Wednesday, September 18, 2013, 13:20 : Chamber vented. |
559
|
Wednesday, January 18, 2017, 09:23 |
Aaron Schmidt | Ta Test | LP-FEBIAD | | | 39530-3 | | In progress | Tri-Coil FEBIAD for testing | Wednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41: Turbo pumps started.
Wednesday, January 18, 2017, 11:01: Ion gauge on.
Thursday, January 19, 2017, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.70e-07T.
Thursday, January 19, 2017, 08:55: Power/Sources on. BIAS/EZL/EE @ 30/15/1.5 kV . Coil @ 50 A . Anode @ 200 V.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.9 |
3.99 |
TBHT |
24.8 |
3.15 |
COIL + EE |
24.7 |
5.16 |
TGHT |
24.7 |
5.05 |
Thursday, January 19, 2017, 08:59: IV4 opened. Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, January 20, 2017, 08:25: TSG : TP1A and TSG : BV1A were noticed to be tripped around 6am.
Friday, January 20, 2017, 08:42: Bypass to restart TSG : TP1A and TSG : BV1A. TP1A is at speed.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.1 |
3.99 |
TBHT |
25.0 |
3.19 |
COIL + EE |
24.7 |
5.19 |
TGHT |
26.5 |
5.05 |
Friday, January 20, 2017, 11:48: Auto ramping TBHT to 320 A @ 2A per min.
Friday, January 20, 2017, 15:51: Coil @ 100A
Saturday, January 21, 2017, 11:00: Increased TB HT voltage limit to 2.75 V. TBHT current went back up from 313 to 319 A. -AM
Monday, January 23, 2017, 10:08: Argon Valve closed.
Monday, January 23, 2017, 10:33: Neon Valve closed.
Monday, January 23, 2017, 11:00: Auto-cooling @ 4A per min. Coil reduced from 100 A to 50 A
Monday, January 23, 2017, 13:32: Power/sources off.
Monday, January 23, 2017, 13:35: RGA off. IV4 closed. Ion gauge off. Turbo pumps off.
Monday, January 23, 2017, 14:45: Venting |
607
|
Friday, October 06, 2017, 12:14 |
Aaron Schmidt | SiC#37 | HP-FEBIAD | ITE | TM4 | 39530-10 | 41751-4 | In progress | Conditioning SiC#37 | NOTE* : The right coil terminal terminates into the heat shield. DO NOT TURN ON COIL.
Friday, October 06, 2017, 12:12: Roughing. * Note on installation. Middle TBHT prong 'stuck' to insulator slightly and was moved to fit. Fit ok in Jig.
Friday, October 06, 2017, 13:53: Turbo pumps on.
Friday, October 06, 2017, 14:00: Ion gauge, RGA on.
Tuesday, October 10, 2017, 07:45: Waterlines opened. No response on RGA. Vacuum ok @ 1.35e-07T.
Tuesday, October 10, 2017, 07:49: RGA Fatal communications error. Restart RGA.
Tuesday, October 10, 2017, 07:57: Power/sources on.
Tuesday, October 10, 2017, 08:17: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Tuesday, October 10, 2017, 08:57: BIAS / EZL / EE @ 0 kV. Power/sources off. Locked out*
Tuesday, October 10, 2017, 09:30: Install/swap gas bottles. Elog.
Tuesday, October 10, 2017, 10:36: Power on. Gas bottles opened. Await vacuum stabilization.
Tuesday, October 10, 2017, 10:40: Sources on.
Tuesday, October 10, 2017, 10:50: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Unable to bring Anode to voltage. Power supply was changed and does not 'Float'. Test TGHT & TBHT. Then switch from Cathode Negative Bias to Anode positive*.
Tuesday, October 10, 2017, 11:37: Auto ramping TGHT / TBHT to 20 / 20 A @ 4A per min. (TEST then cool)
Tuesday, October 10, 2017, 11:45: Auto-cooling
Tuesday, October 10, 2017, 11:57: Sources off / BIAS / EZL / EE @ 0 kV.
Wednesday, October 11, 2017, 10:25: Anode & PS switched*. Power/Sources on.
Wednesday, October 11, 2017, 10:38: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.
Wednesday, October 11, 2017, 10:40: Coil @ 0 A. Anode 200 V / 7.326mA.
Wednesday, October 11, 2017, 10:45: Gas bottles opened. Await vacuum stabilization.
Wednesday, October 11, 2017, 10:47: IV4 Opened. Vacuum @ 2.43e-07T
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.6 |
3.78 |
TBHT |
24.6 |
2.75 |
COIL + EE |
24.4 |
4.84 |
TGHT |
24.6 |
5.44 |
Wednesday, October 11, 2017, 10:50: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Wednesday, October 11, 2017, 14:21: Check. Vacuum @ 2.99e-06T. Outgassing.
Wednesday, October 11, 2017, 14:42: Note* Slight discrepancy on the TBHT. Direct read out off the PS @ 296A. Source page: TBHT set to 290.0A, shows 302.2A
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
31.4 |
3.84 |
TBHT |
25.4 |
2.98 |
COIL + EE |
25.0 |
4.86 |
TGHT |
27.1 |
5.45 |
Thursday, October 12, 2017, 09:00. Mass scans ok. Spark @ 8:57.
Thursday, October 12, 2017, 10:48: Auto ramping TBHT to 310 A @ 2A per min.
Friday, October 13, 2017, 07:15: Anode short determined. Plotted. Occurred around 18:00 (6pm) yesterday.
Friday, October 13, 2017, 07:20: Auto-cooling @ 4A per min
Friday, October 13, 2017, 10:03: Sources off. Gas lines closed.
Friday, October 13, 2017, 10:06: RGA off. IV4 Closed. Reset IV4
Friday, October 13, 2017, 10:08: Ion gauge off. Turbos off.
Friday, October 13, 2017, 11:10: Venting.
Friday, October 13, 2017, 11:45: power off. Waterlines purged.
Friday, October 13, 2017, 11:49: Doors open, |
610
|
Friday, October 13, 2017, 15:53 |
Aaron Schmidt | SiC#37 | HP-FEBIAD | ITE | TM4 | 39530-10 | 41751-4 | In progress | Conditioning SiC#37 (ii) | Previous short fixed. Grid clamp removed. Grid tack welded.
Friday, October 13, 2017, 15:49: Roughing.
By Anders
Friday, October 13, 2017, 16:10: TPs started
Friday, October 13, 2017, 16:20: Vacuum at 2.7E-7 T
Saturday, October 14, 2017, 06:37: Opened water supply to HS. 95/10 psi. Vacuum stable at 5.7E-7 T
Saturday, October 14, 2017, 06:42: Opened gas lines.
Saturday, October 14, 2017, 06:43: Started heater ramping to 580 / 290 A
Saturday, October 14, 2017, 06:45: BIAS/EZL/EE to 30 / 13.5 / 1.5 kV. EE current somewhat unstable around 500 uA - seems related to elevated BIAS current. Improving as BIAS current is gradually coming down.
Saturday, October 14, 2017, 15:19: TBHT to 310 A. Local readback 316 A
Sunday, October 15, 2017, 17:36 : Ramping down heaters.
Monday, October 16, 2017, 09:10: Sources off.
Monday, October 16, 2017, 09:13; IV4 Closed & Reset. FEBIAD Gas lines closed.
Monday, October 16, 2017, 09:15: RGA, Ion gauge, turbos off.
Monday, October 16, 2017, 10:40: Power off. Waterlines purged.
Monday, October 16, 2017, 10:43: Venting. |
497
|
Friday, March 04, 2016, 14:23 |
Anders Mjos | Target tube only | LP-SIS | ITW | TM2 | 39459-2 | 41120-10 | In progress | Conditiong Heat Shield for UC#15 | Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos started
Friday, March 04, 2016, 15:11: Turbos at speed. Vacuum at 3.5E-5 T.
Monday, March 07, 2016, 08:34: Opened water. Vacuum stable at 6.7E-7 T. No response on RGA
Monday, March 07, 2016, 08:46: Started auto-ramping TGHT to 420 A at 2 A/min. EE to 1500 V
Tuesday, March 08, 2016, 08:26: Continued auto-ramping TGHT to 500 A.
Wednesday, March 09, 2016, 09:25: TGHT voltage limited at 488 A. Increased voltage limit from 6 to 6.5 V. Resumed auto-ramping to 500 A
Thursday, March 10, 2016, 08:19: Begin cool down @ 2 A/min ; Vacuum @ 7.1E-7 T
Thursday, March 10, 2016, 13:20: TGHT to 0 A. Switched off RGA.
Thursday, March 10, 2016, 14:04 : Source off. Stopped Turbo pumps.
Friday, March 11, 2016, 08:15: Begin venting.
Friday, March 11, 2016, 08:28: Heat shield water circuit has been purged.
|
499
|
Wednesday, March 16, 2016, 09:59 |
Anders Mjos | Target tube only | | | TM1 | 39459-2 | 40898-2 | In progress | Conditiong Heat Shield for UC#15 | Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58: Roughing
Wednesday, March 16, 2016, 12:54: Started Turbo pumps
Wednesday, March 16, 2016, 13:02: Turbos at speed, Vacuum at 7.16E-06T
Thursday, March 17, 2016, 08:30: Opened water on heat shield circuit. Vacuum stable at 3.0E-07T. No response on RGA.
Thursday, March 17, 2016, 08:37: Auto-Ramping started. TGHT to 500A @ 2A/min. EE to 1500V.
Thursday, March 17, 2016, 15:40 @ 500A and 6.76E-07T
Friday, March 18, 2016, 08:35: Auto-cooling. Vacuum @5.87E-07T.
Friday, March 18, 2016, 14:13: Source off. Stopped turbo pumps.
Tuesday, March 29, 2016, 13:22: venting |
337
|
Friday, September 27, 2013, 11:41 |
Anders Mjos | Ta#41 | HP-SIS | ITW | TM4 | 39069-5 | 38817-10 | Done | Ta#41 Conditioning | Friday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08: Turbos started
Friday, September 27, 2013, 12:16: Turbos at speed.
Friday, September 27, 2013, 12:18: Vacuum at 1.5E-5 T
Monday, September 30, 2013, 08:41: Opened water supply. Vacuum stable at 1.5E-7 T
TGHT Q=5.5 T=28.0
TBHT Q=5.8 T=28.0
Monday, September 30, 2013, 15:19: Flow sensor moved from TBHT to HS
TGHT Q=5.5 T=27.9
HS Q=3.6 T=27.8
Tuesday, October 01, 2013, 12:08: Taget Biased to 30kV.
Wednesday, October 02, 2013, 08:50: Started autoramping to 580A/230A
Wednesday, October 02, 2013, 08:50: Opened IV4
Wednesday, October 02, 2013, 10:51 TGHT/TBHT 250A / 239A
TGHT Q=5.5 T=28.5
HS Q=3.6 T=29.2
SUPPLY (ext) 27.3
RETURN (ext) 27.8
Wednesday, October 02, 2013, 13:28 TGHT/TBHT 250A / 570A
TGHT Q=5.5 T=30.4
HS Q=3.6 T=33.4
SUPPLY (ext) 27.4
RETURN (ext) 29.3
Wednesday, October 02, 2013, 13:30: TBHT was starting to limit on voltage. Increased voltage limit to 2.4V.
Thursday, October 03, 2013, 08:21: TMS:TP2 timed out over night.
Magnet PS breaker tripped during a mass scan yesterday. Reset breaker and cleared interlocks.
TGHT Q=5.5 T=30.4
HS Q=3.6 T=34.0
SUPPLY (ext) 27.3
RETURN (ext) 29.3
Thursday, October 03, 2013, 08:28: Started mass scan 200 -> 0 m/q. FC0 7.5E-8 A
Thursday, October 03, 2013, 14:29
TGHT Q=5.5 T=30.6
HS Q=3.6 T=33.9
SUPPLY (ext) 27.4
RETURN (ext) 29.6
Thursday, October 03, 2013, 15:14: Lowered TBHT:RDCUR to 230A.
Thursday, October 03, 2013, 15:37: Increased EE to -2000 V
Thursday, October 03, 2013, 16:22
TGHT Q=5.5 T=30.6
HS Q=3.6 T=33.9
SUPPLY (ext) 27.5
RETURN (ext) 29.6
Friday, October 04, 2013, 08:08
TGHT Q=5.5 T=30.6
HS Q=3.5 T=33.9
SUPPLY (ext) 27.5
RETURN (ext) 29.3
Mass scan started.
Friday, October 04, 2013, 08:46: Cool down started.
Friday, October 04, 2013, 13:35: TPS:IV4 closed
Friday, October 04, 2013, 13:41: Source debiased.
Tuesday, October 15, 2013, 09:56: Turbos stopped. Vacuum at 1.15 E-7 T
Tuesday, October 15, 2013, 12:44: Venting
After the conditioning, some oxidation (?) from the standards (?) were found on the Plasma Electrode and around the Target Tube. See attachment |
402
|
Friday, August 29, 2014, 14:52 |
Anders Mjos | Ta#44 | HP-SIS | ITE | TM4 | 38817-9 | 40316-11 | Done | Conditioning Ta#44 | Friday, August 29, 2014, 14:51: Roughing
Friday, August 29, 2014, 15:11: Starting turbos.
Friday, August 29, 2014, 15:19: Turbos at speed
Friday, August 29, 2014, 15:21: Vacuum at 1.6E-5 T
Tuesday, September 02, 2014, 08:36: HS cooling water supply opened. Vacuum stable at 1.4E-7 T
Tuesday, September 02, 2014, 08:50 : BIAS/ EZL / EE to 30 / 14 / -1.5 kV. Started auto ramping to 500 / 150 (180) A
Tuesday, September 02, 2014, 09:23
Supply ~97psi, Return ~7psi
Device
|
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.9 |
28.0 |
TBHT |
6.5 |
27.6 |
COIL + EE |
5.4 |
28.6 |
TGHT |
5.8 |
27.8 |
SUPPLY |
|
28.2 |
Thursday, September 04, 2014, 12:38 : Starting cool-down
Thursday, September 04, 2014, 15:20: Closed IV4
Thursday, September 04, 2014, 15:37 : BIAS / EZL / EE to 0
Friday, September 05, 2014
Target cooled down. Power supplies switched off.
Monday, September 08, 2014, 14:07: Turbos stopped.
Monday, September 08, 2014, 15:15: Venting. HS cooling water lines purged.
Monday, September 08, 2014, 16:00: Target removed. |
446
|
Monday, May 25, 2015, 14:40 |
Anders Mjos | SiC#31 | HP-SIS | ITW | TM4 | 38817-7 | | In progress | SiC#31 Conditioning | Monday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos started.
Monday, May 25, 2015, 15:15: Turbos at speed. Vacuum at 2.4E-5 T
Tuesday, May 26, 2015, 07:45: Opened water circuit for HS line. Vacuum stable at 6.3E-7 T. No response on RGA
Tuesday, May 26, 2015, 07:50: Autoramping to 500/200 A at 2/1 A/min. Good vacuum 2E-6, bad vacuum 4E-6 T
Tuesday, May 26, 2015, 07:52: IV4 open
Tuesday, May 26, 2015, 13:15: Continue auto-ramping to 580 A
Tuesday, May 26, 2015, 13:48: BIAS/EZL/EE 30 / 15 / 1.5 kV
Tuesday, May 26, 2015, 17:29: ~6 sparks/hour
Wednesday, May 27, 2015, 08:14: A couple of sparks over night.
Wednesday, May 27, 2015, 09:23: Autoramping TBHT to 220 A
Wednesday, May 27, 2015, 09:41: Found FC0 and FC6 bias to be off
Wednesday, May 27, 2015, 09:42: Autoramping TBHT to 230 A
Wednesday, May 27, 2015, 10:30: EE to 2 kV
Wednesday, May 27, 2015, 10:37: Starting cool down at 4/2 A/min
Wednesday, May 27, 2015, 10:40: EE to 1.5 kV
Wednesday, May 27, 2015, 12:37 : BIAS/EZL/EE OFF
Wednesday, May 27, 2015, 12:37 : IV4 closed
Wednesday, May 27, 2015, 13:02: Stopped turbos
Wednesday, May 27, 2015, 13:41: Venting |
431
|
Monday, March 16, 2015, 18:53 |
Anders Mjos | Ta#45 | HP-SIS | ITE | TM4 | 38817-5 | | In progress | Conditioning Ta#45 | Monday, March 16, 2015, 18:53: Started turbos
Monday, March 16, 2015, 19:00: Turbos at speed. Vacuum at 1.3E-5 T
Tuesday, March 17, 2015, 09:03: Opened cooling water. Vacuum stable at 1.9E-7 T
Tuesday, March 17, 2015, 09:12: Opened IV4. BIAS/EZL/EE to 30/14/1.5 kV
Tuesday, March 17, 2015, 09:20: Started heating TGHT/TBHT to 400/150 A at 2/1 A/min
Wednesday, March 18, 2015, 08:41: Continued heating TGHT/TBHT to 580/170 A at 2/1 A/min
Wednesday, March 18, 2015, 09:33: MB1 found tripped on water flow. Water pressure is low this morning as cyclotron main magnet was switched on, but not all water pumps. Expected to be resolved soon..
Some emittance scans at 170, 180, 190, 200 A TBHT were done
Thursday, March 19, 2015, 08:47: Heating TBHT to 220 A
Thursday, March 19, 2015, 08:56: Heating TBHT to 230 A
Thursday, March 19, 2015, 10:50: EE at -2000 V for 10 min
Thursday, March 19, 2015, 10:52: EE back at -1.5 kV
Thursday, March 19, 2015, 17:54: Started cool down of target
Friday, March 20, 2015, 08:47: Closed IV4
Friday, March 20, 2015, 08:47: RGA off.
Friday, March 20, 2015, 08:50: Stopped turbos
Friday, March 20, 2015, 10:24: Venting
Friday, March 20, 2015, 11:45: Target removed. |
98
|
Thursday, May 17, 2012, 13:24 |
John Wong | SiC#27 | HP-SIS | ITE | TM4 | 38817-3 | | Problems/Solutions | Solid residues found on EE | Thursday, May 17, 2012, 13:15
After the test-stand, the EE was removed for inspection. It was discovered that there were some solid residues coated on the extraction electrode and the common plate, but the ionizer tube was clean (see attachment#1). Some samples were collected and will try to do some analysis. This problem has been seen before but it's still not clear why the solid residues form after the test-stand.
The EE & the common plate were cleaned with acetone and re-assembled back to the target.
|
649
|
Friday, March 16, 2018, 08:15 |
Aaron Schmidt | Nb#8 | HP-SIS | ITW | TM2 | 38817-2 | 42738-12 | In progress | Conditioning Nb#08 | Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo pumps started.
Friday, March 16, 2018, 10:40: Ion gauge on.
Friday, March 16, 2018, 10:45: RGA on.
Friday, March 16, 2018, 13:10: Check. Vacuum @ 7.37e-7T
Monday, March 19, 2018, 06:44: Waterlines opened: Vacuum stable @ 2.16e-07T
Monday, March 19, 2018, 06:46: Power/sources on.
Monday, March 19, 2018, 06:49: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
21.6 |
3.68 |
TBHT |
22.2 |
2.97 |
COIL + EE |
21.4 |
4.73 |
TGHT |
21.5 |
5.39 |
Monday, March 19, 2018, 06:51: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Monday, March 19, 2018, 06:57: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, March 19, 2018, 07:02: Optics on & reset.
Monday, March 19, 2018, 10:53: Drops in BIAS voltage from 30kV to below 22.5 kV and spikes to the BIAS current (282 uA) observed. Unstable.
Monday, March 19, 2018, 12:56: Communications issue noted with the mass separator magnet. Increase in Amp achieves no change in Gauss. Kyle L notified.
TMS:HALLMB1:RDFIELD Communication error.
Monday, March 19, 2018, 14:00: MB1 Communication error fixed. However the negative voltage on Q2 & Q5 in unavailable.
Monday, March 19, 2018, 15:07: Auto cooling TGHT / TBHT to 500 / 150 A @ 6A/4A per min.
Monday, March 19, 2018, 15:17: Auto cooling halted. TGHT / TBHT @ 501 / 152 A. Manually put to 500 / 150 A.
Controller for TMS:Q5 & TMS:Q2 off for repair.
Tuesday, March 20, 2018, 09:09: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, March 20, 2018, 12:58: The controller was fixed. Nb#08 conditioning continues with tests.
Wednesday, March 21, 2018, 06:24: Auto-cooling @ 2A per min.
Wednesday, March 21, 2018, 11:23: Sources at 0. Off.
Wednesday, March 21, 2018, 11:29: Power off. Waterlines purged.
Wednesday, March 21, 2018, 11:32: RGA off. IV4 closed/reset.
Wednesday, March 21, 2018, 11:33: Ion gauge off. Turbos off.
Wednesday, March 21, 2018, 13:15: Venting. |
3
|
Wednesday, September 14, 2011, 15:40 |
Anders Mjos | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | TaC#1 installed and pumping down. | Wednesday, September 14, 2011, 15:39: Vacuum at 1.3e-5 torr
Thursday, September 15, 2011, 08:59: Vacuum at 2.9e-7 torr. Water flowing and vacuum stable. |
6
|
Friday, September 16, 2011, 12:39 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | HV conditioning | Started the HV conditioning: TSG:BIAS=30kV and TSH:EE=-700V. |
7
|
Monday, September 19, 2011, 09:11 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | In progress | Started target and tube heaters. | Heaters conditioning went fine: 580A and 230A.
Did a mass scan:
Plotdump-local-clean.txt Sept19 11 12-45-22.txt
Set for Li-7 for over the night on TMS:FC6. |
8
|
Tuesday, September 20, 2011, 19:00 |
Aurelia Laxdal | TaC#1 | LP-SIS | ITE | TM1 | 38634-6 | 36833-6 | Done | Finished testing TaC#1 | Tuesday, September 20, 2011:
Did another mass scan today at 5:40. Saved as: plotdump-local-clean.txt Sept 20 11 11-51-20.txt
Started target cool-down. Tomorrow the target would be ready to be removed from the Test Stand.
Wednesday, September 21, 2011:
Turned off the HV & optics.
Target is ready to be removed. Currently, it's under vacuum and the water is still on.
|
|