Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 10 of 53  Not logged in ELOG logo
  ID Date Author Target/No.#down Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  507   Monday, May 02, 2016, 16:03 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator TestMonday, May 02, 2016, 16:01: Roughing.
Monday, May 02, 2016, 16:35: Turbos
started -AM
 TS-2016-05-02_EE_insulator_test.rga 
  508   Friday, May 06, 2016, 10:18 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator Test (2) No PEFriday, May 06, 2016, 10:18: Begin roughing
Venting: VCR on HS not closed
Friday, May 06, 2016, 12:58: Roughing
  
  509   Thursday, May 12, 2016, 13:32 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator Test, No PE , Dirty EE.Thursday, May 12, 2016, 13:00: Begin Roughing.
Thursday, May 12, 2016, 13:40: Turbo
Pumps started
  
  988   Tuesday, December 12, 2023, 16:11 Dave NeilsonShunt #0   -- P2N Thermal TestTuesday, December 12, 2023, 16:07 
- Pumping down test stand overnight for testing
tomorrow. vacuum good, turbos starting now.
  
  241   Tuesday, December 04, 2012, 17:27 Anders MjosRFQ empty     In progressPumping downThe RFQ heating test target was installed
by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26:
  
  245   Tuesday, December 11, 2012, 13:40 Sebastian RaederRFQ empty     DoneHeating test for Ion guide Laser ion sourcenew ion guide laser ion source installed.
Pure target container without targetmaterial
and without surface ion source.
 heatint_rfq_dec11_2012.PNGheatint_rfq_dec12_2012.PNG 
  246   Thursday, December 13, 2012, 08:40 Anders MjosRFQ empty     In progressVentingThursday, December 13, 2012, 08:38: TBHT
and TGHT off
Thursday, December 13, 2012, 08:38 :
  
  248   Friday, December 14, 2012, 14:24 Sebastian RaederRFQ empty      VentingFriday, December 14, 2012, 14:24 Stop Turbopumps
and prepare venting to insert RFQ target
  
  249   Friday, December 14, 2012, 15:28 Anders MjosRFQ empty     In progressVenting

    

       
            
  
  250   Friday, December 14, 2012, 20:34 Sebastian RaederRFQ empty     Donepumping downFriday, December 14, 2012, ~ 17:00: start
roughing pumps
Friday, December 14, 2012, 20:33:
  
  251   Monday, December 17, 2012, 22:35 Sebastian RaederRFQ empty      wire connection for RFQ testOverview over the connections of the new
9Pin connector inside the vacuum and in the
HV cage
  
  253   Tuesday, December 18, 2012, 16:00 Sebastian RaederRFQ empty     Donetarget heatingTuesday, December 18, 2012, ~ 13:00 start
ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56:
 heatint_rfq_dec18_2012.PNGheatint_rfq_dec18_2012_detail.PNG 
  261   Friday, January 04, 2013, 15:07 Anders MjosRFQ empty     In progressPumping downFriday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24:
Starting turbos
  
  262   Monday, January 07, 2013, 14:52 Sebastian RaederRFQ empty      heating targetheating target for RFQ tests. Now the wiring
is insulated with alumina beats and tubing
and the target has the standard Ta alkali
 RFQ_with_signal_total.PNGRFQ_with_signal.PNG 
  263   Wednesday, January 09, 2013, 10:39 Anders MjosRFQ empty     In progressVenting Wednesday, January 09, 2013, 10:38:
Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24
  
  266   Friday, January 11, 2013, 11:02 Anders MjosRFQ empty      Target installed, pumping downTarget installed with 120 in lbs torque
on target legs and on central support.
Friday, January 11, 2013, 11:01:
  
  267   Monday, January 14, 2013, 13:51 Sebastian RaederRFQ empty     In progressheatingStarted heating the target, now Silica
sleevings are installed for wire insulation
and the gap target -- repeller is now 0.6mm
  
  269   Tuesday, January 15, 2013, 15:12 Sebastian RaederRFQ empty      Start coolingStart cooling of Target RFQ empty   
  270   Tuesday, January 15, 2013, 16:10 Anders MjosRFQ empty      Turbos off

    

       
            
  
  271   Wednesday, January 16, 2013, 01:06 Sebastian RaederRFQ empty      Target installed - pumping downRFQ empty target installed
Wednesday, January 16, 2013, 01:05:
roughing started
  