Aaron Schmidt | SiC | LP-SIS | | | 41077-3 | | | EE new insulator Test | Monday, May 02, 2016, 16:01: Roughing.
Monday, May 02, 2016, 16:35: Turbos started -AM
Monday, May 02, 2016, 16:43: Turbos at speed. Vacuum at 1.6E-5 T - AM
Tuesday, May 03, 2016, 08:15: Opened water supply for heat shield. Vacuum stable at 2.5E-7 T. No response on RGA.
Tuesday, May 03, 2016, 08:33: Sources on
Tuesday, May 03, 2016, 08:37: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min
Tuesday, May 03, 2016, 08:44: Sources off Except TGHT/TBHT
Tuesday, May 03, 2016, 08:47:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
3.99 |
TBHT |
29.6 |
3.24 |
COIL + EE |
28.5 |
5.15 |
TGHT |
28.7 |
5.77 |
Tuesday, May 03, 2016, 12:42:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.06 |
TBHT |
29.6 |
3.17 |
COIL + EE |
28.7 |
5.16 |
TGHT |
29.8 |
5.78 |
Tuesday, May 03, 2016, 15:29;
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.02 |
TBHT |
30.4 |
3.26 |
COIL + EE |
29.0 |
5.16 |
TGHT |
30.0 |
5.77
|
Wednesday, May 04, 2016, 08:00:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
3.99 |
TBHT |
29.5 |
3.22 |
COIL + EE |
28.7 |
5.16 |
TGHT |
29.6 |
5.74
|
Wednesday, May 04, 2016, 12:53:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.06 |
TBHT |
29.6 |
3.19
|
COIL + EE |
28.7 |
5.19 |
TGHT |
29.6 |
5.72
|
Wednesday, May 04, 2016, 14:56: TSHWSW-1: 8 Psi , Gauge below: 106 Psi
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
29.8 |
3.19
|
COIL + EE |
28.8 |
5.21 |
TGHT |
29.8 |
5.80
|
Wednesday, May 04, 2016, 15:01: Begin auto-cooling @ 2A/min.
Thursday, May 05, 2016, 08:33: TBHT/TGHT off. Ion gauge off. Turbo pumps off.
Friday, May 06, 2016, 08:10: Water lines purged. Power supply off. Venting. |
Attachment 1: TS-2016-05-02_EE_insulator_test.rga
|
508
|
Friday, May 06, 2016, 10:18 |
Aaron Schmidt | SiC | LP-SIS | | | 41077-3 | | | EE new insulator Test (2) No PE | Friday, May 06, 2016, 10:18: Begin roughing
Venting: VCR on HS not closed
Friday, May 06, 2016, 12:58: Roughing
Friday, May 06, 2016, 13:22: Started turbos
Friday, May 06, 2016, 15:32: Vacuum at 1.2E-5 T
Monday, May 09, 2016, 09:07: Opened water supply for heat shield. Vacuum stable at 2.78E-7 T.
Monday, May 09, 2016, 09:16:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
4.06 |
TBHT |
30.8 |
3.33 |
COIL + EE |
28.5 |
5.24 |
TGHT |
28.7 |
5.80 |
Monday, May 09, 2016, 09:35: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.
Monday, May 09, 2016, 13:26:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
31.8 |
3.40
|
COIL + EE |
28.8 |
5.19 |
TGHT |
30.0 |
5.82 |
Tuesday, May 10, 2016, 08:18:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
30.3 |
3.27
|
COIL + EE |
28.8 |
5.19 |
TGHT |
29.8 |
5.77 |
Tuesday, May 10, 2016, 12:36:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.06 |
TBHT |
29.9 |
3.20
|
COIL + EE |
28.8 |
5.18 |
TGHT |
29.8 |
5.82 |
Tuesday, May 10, 2016, 15:21:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.02 |
TBHT |
29.4 |
3.15
|
COIL + EE |
28.8 |
5.16 |
TGHT |
30.0 |
5.73 |
Wednesday, May 11, 2016, 08:45:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.5 |
4.02 |
TBHT |
29.3 |
3.16
|
COIL + EE |
28.8 |
5.13 |
TGHT |
30.0 |
5.77 |
Wednesday, May 11, 2016, 14:13:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.06 |
TBHT |
29.6 |
3.16
|
COIL + EE |
29.0 |
5.19 |
TGHT |
30.0 |
5.78 |
Wednesday, May 11, 2016, 17:39: Ramping down TGHT/TBHT -AM
Thursday, May 12, 2016, 08:04: Ion gauge off. Turbo pumps off.
Thursday, May 12, 2016, 11:08: Water lines off/purged. Venting.
Thursday, May 12, 2016, 11:32: Source off, lock on. |
509
|
Thursday, May 12, 2016, 13:32 |
Aaron Schmidt | SiC | LP-SIS | | | 41077-3 | | | EE new insulator Test, No PE , Dirty EE. | Thursday, May 12, 2016, 13:00: Begin Roughing.
Thursday, May 12, 2016, 13:40: Turbo Pumps started
Thursday, May 12, 2016, 13:46: Ion gauge switched on.
Friday, May 13, 2016, 08:33: Opened water supply for heat shield. Vacuum stable at 3.70E-7 T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.9 |
4.06 |
TBHT |
29.0 |
3.20 |
COIL + EE |
28.5 |
5.24 |
TGHT |
28.5 |
5.72 |
Friday, May 13, 2016, 10:01: Auto ramping TGHT/TBHT to 420A/220A @ 2A/min.
Friday, May 13, 2016, 13:55
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
3.95 |
TBHT |
29.8 |
3.16 |
COIL + EE |
29.0 |
5.17 |
TGHT |
30.0 |
5.72 |
Monday, May 16, 2016, 11:29:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.7 |
4.06 |
TBHT |
29.4 |
3.18 |
COIL + EE |
28.7 |
5.18 |
TGHT |
29.8 |
5.77 |
Monday, May 16, 2016, 15:59:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.9 |
3.20 |
COIL + EE |
29.1 |
5.21 |
TGHT |
30.1 |
5.77 |
Note: RGA misread.
Tuesday, May 17, 2016, 15:15:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
30.6 |
3.29 |
COIL + EE |
29.0 |
5.16 |
TGHT |
30.1 |
5.74 |
Note: RGA Misread.
Wednesday, May 18, 2016, 14:30: IV4 open. FC0 open
Wednesday, May 18, 2016, 14:58: FC0 closed.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.3 |
3.15 |
COIL + EE |
29.0 |
5.14 |
TGHT |
30.0 |
5.72 |
Thursday, May 19, 2016, 16:26:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.06 |
TBHT |
29.3 |
3.15 |
COIL + EE |
28.8 |
5.17 |
TGHT |
30.0 |
5.77 |
Friday, May 20, 2016, 14:59:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.6 |
3.20 |
COIL + EE |
28.8 |
5.14 |
TGHT |
30.0 |
5.79 |
Tuesday, May 24, 2016, 15:31:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
29.9 |
3.18 |
COIL + EE |
29.0 |
5.15 |
TGHT |
30.1 |
5.72 |
Thursday, May 26, 2016, 15:18:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.0 |
4.02 |
TBHT |
30.6 |
3.28 |
COIL + EE |
29.0 |
5.14 |
TGHT |
30.0 |
5.75 |
Friday, May 27, 2016, 15:27: IV4 Closed
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.02 |
TBHT |
32.2 |
3.42 |
COIL + EE |
28.7 |
5.22 |
TGHT |
29.7 |
5.77 |
Monday, May 30, 2016, 08:35:
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
33.8 |
4.05 |
TBHT |
29.9 |
3.25 |
COIL + EE |
28.7 |
5.18 |
TGHT |
29.7 |
5.78 |
Monday, May 30, 2016, 08:54: Auto ramp down TGHT/TBHT @ 2A/1A per min to 0A.
Tuesday, May 31, 2016, 08:25: Ion gauge off. Turbo pumps off.
Wednesday, June 01, 2016, 09:10: Venting
Wednesday, June 01, 2016, 9:45: Water lines purged, power off. |
988
|
Tuesday, December 12, 2023, 16:11 |
Dave Neilson | Shunt #0 | | | | - | - | | P2N Thermal Test | Tuesday, December 12, 2023, 16:07 - Pumping down test stand overnight for testing tomorrow. vacuum good, turbos starting now. Four thermocouples attached inside. tc1: high on (+) TGHT leg, pins 1+2. tc2: at target terminal (+), pins 4+5. tc3: at target terminal (-), pins 6+7. tc4: low on (+) TGHT leg, pins 8+9.
Wednesday, December 13, 2023, 09:32 : Vacuum at 8.2e-7 T. Electrical team is finishing connecting the cables. Claim it will be complete at 11am.
Wednesday, December 13, 2023, 11:41Started both tc loggers at 11:40 - important for offset time. Beginning ramp as well on ATTS TGHT. set vacuum values high at 1e3 1e4 to bypass ATTS interlock, which does not apply here. ramping to 600A with step increment 10A and wait interval 10s.
ATTS TGHT claims ramping in progress, but increased voltage is reported only on the autoramp window, which reports increasing the target amperage by 10A each 10s. However, no increased voltage reading is reported there, nor is there any increased current. ATTS:TGHT:RDCUR and ATTS:TGHT:RDVOL are ~0 as well. No increased temperature on any of 6 tc channels.
Wednesday, December 13, 2023, 11:57 ATTS TGHT power supplies appear to be under local control. It also appears (low current right now) that the value reported in EPICS is 1/3 of the value reported on the master power supply. It may be that the epics value is per output of the individual 3 supplies, while the total output is reported on the PS display. Planning to now increase to 300A and reach steady state.
Wednesday, December 13, 2023, 12:13 : 1/3 ratio idea confirmed at 33A EPICS reading / 100A master reading and again at 100A EPICS reading / 300A master reading. 300A now reached. Waiting for 20min. Temps inside ~ 21°C. Temps on feed through terminals ~22°C
Wednesday, December 13, 2023, 12:26: 200epics 600A master. tc out: 23.0, 22.6. tc in: 21.4 21.7 22.0 20.8. waiting
Wednesday, December 13, 2023, 12:36 No temp change over 10 min. increasing to 900A
Wednesday, December 13, 2023, 12:47: 900A. outside tc 24.5 23.7°C. inside tc 21.7 23 23.6 21.0 °C.
Wednesday, December 13, 2023, 13:04: increasing to 1200A
Wednesday, December 13, 2023, 13:11 1200A. outside tc 27.1 25.4. inside tc 22.6 24.8 25.9 21.7 °C. Will wait to observe stability
Wednesday, December 13, 2023, 13:20 after ~10min. outsideTC: 27.6 25.9. insideTC: 22.5 25.2 26.1 21.8 °C. Temperatures appear stable. increasing to 1300A
Wednesday, December 13, 2023, 13:25 at 1300A. outsideTC: 28.3 26.5, insideTC: 22.8 25.7 26.8 21.8. waiting for stability
Wednesday, December 13, 2023, 13:38 after ~10min, outsideTC 29.1 27.1, insideTC 23.2, 26.2, 27.4, 21.9. stable. Increasing to 1400A
Wednesday, December 13, 2023, 13:41: 1400A. outsideTC 29.8, 27.6. insideTC 23.4 26.7 28.2 21.4
Wednesday, December 13, 2023, 13:50 temps look stable 30.1 27.9, 23.3 27.7 28.4 21.4 . going to increase to 1500A ---- turning off turbo pumps in case of failure at high current
Wednesday, December 13, 2023, 13:57 at 1500A. temps: 30.9 28.3. 23.6 27.2 28.9 21.8 .
Wednesday, December 13, 2023, 14:07 temps look stable: 31.5 28.8... 23.6 28.0 29.4 22.0 going to increase to 1600A
Wednesday, December 13, 2023, 14:10 at 1600A temps: 32.0 29.1..... 23.8 28.2 30.0 22.2
Wednesday, December 13, 2023, 14:20 temps stable: 32.8 29.7, 23.9 28.9 30.6 22.2,. increasing to 1700A
Wednesday, December 13, 2023, 14:24 at 1700A temps: 33.5 30.2 24.3 29.3 31.5 22.4
Wednesday, December 13, 2023, 14:35 temps stable : 34.2 31.0 24.3 30.0 32.0 22.6 increasing to 1800A
Wednesday, December 13, 2023, 14:38 at 1800A. temps: 35.0 31.3 24.6 30.3 32.7 22.8
Wednesday, December 13, 2023, 14:47 temps: 35.8 32.0 24.7 31.2 33.3 22.8
Wednesday, December 13, 2023, 14:58 temps stable. 36.0 32.2 24.7 31.2 33.3 23.1 turning down power supply
Wednesday, December 13, 2023, 15:23 power supply off. strip tool data dumped to test1.txt --- copy this elsewhere. TCs left to continue monitoring for any additional cooldown.
Wednesday, December 13, 2023, 16:13 tc recording stopped.
repeat test
Thursday, December 14, 2023, 15:18 tcs start time
Thursday, December 14, 2023, 15:20 increasing TGHT from ATTS directly to 1500A and waiting for steady state temperature. Aiming for similar ramp rate to previous ~1A/s, 60A/min. tcs at cold read 21.9 21.9... 21.1 20.9 20.9 20.7
Thursday, December 14, 2023, 15:39 at 1500A
Thursday, December 14, 2023, 15:50 after~10min, temps at 31.3 28.4... 23.6 27.6 29.1 22.3
Thursday, December 14, 2023, 15:59 after ~20min, temps at 31.5 28.6.... 23.5 27.5 28.8 22.5. stable. increasing to 1800A
Thursday, December 14, 2023, 16:03 at 1800A
Thursday, December 14, 2023, 16:14 after 10min - 35.8 31.8 24.7 30.8 32.6 23.1
Thursday, December 14, 2023, 16:25 after 20min - 36.3 32.2 24.7 30.9 32.6 23.4 stable. decreasing current.
Thursday, December 14, 2023, 16:42 0A... cooling for a while
Thursday, December 14, 2023, 16:56 22.8 22.8 21.1 21.0 21.2 20.8 |
241
|
Tuesday, December 04, 2012, 17:27 |
Anders Mjos | RFQ empty | | | | | | In progress | Pumping down | The RFQ heating test target was installed by Sebastian and Anders.
Tuesday, December 04, 2012, 17:26: roughing
Tuesday, December 04, 2012, 17:45: starting turbos
Tuesday, December 04, 2012, 17:55 : turbos at speed
Tuesday, December 04, 2012, 17:55 : vacuum at 3.3E-5 T |
245
|
Tuesday, December 11, 2012, 13:40 |
Sebastian Raeder | RFQ empty | | | | | | Done | Heating test for Ion guide Laser ion source | new ion guide laser ion source installed. Pure target container without targetmaterial and without surface ion source.
Heat up to 580A for heat test of all components. Distance between target and repeller < 1mm
13:15 start heating TGHT, 1A per 30sec vacuum below 2E-7T
14:50 reached 200A at TGHT (1.5V readback same as frontpanel), vacuum now 2.9E-7T, proceed on to 400A
16:10 TGHT 350 A (setpoint, readback stopped at 269A) and 3.4V readback, sudden increase in vacuum from 4E-7T to 5.5E-7T and larger fluctuations, give it 10min
16:22 vacuum back to 4.4E-7T but some occasional vacuum spikes , proceed to 400A
17:00 at 400A / 4.13V, vacuum hit 2E-6T in between which delayed the heating, now decreasing, will goto 410A for half an hour and then 385A over night
Dec 12th
8:30 3.3E-7T Vac at 385A, goto 420A
8:50 7.5E-7T Vac at 420A, goto 450A
9:20 1.7E-6T Vac at 450A, goto 470A
10:00 1.5E-6T Vac at 470A / 4.5V
11:30 1.1E-6T at 520A/4.56V
Wednesday, December 12, 2012, 11:46 1.7E-6T at 550A/4.58V
Wednesday, December 12, 2012, 14:31
580A reached, Vacuum dropped from 1.8E-6T to 5.8E-7T in 2h
voltage read back is wrong as well Panel readings are 572A/6.99V (read back values in EPICS are 248A/ 4.6V)
Wednesday, December 12, 2012, 14:47 6.5E-7T at 592A/ 7.31V (Panel readings)
Wednesday, December 12, 2012, 15:01 there is no contact of the target to HV GND (especially the repeller), the target can still be biased to 5V
Wednesday, December 12, 2012, 19:48 5.9E-7Tvacuum is slowly going down now
Thursday, December 13, 2012, 00:23 5.5E-7T, start cooling down
Short summary on results of first heating teest with the Ion Guide Ion source:
The Ion source is still in good shape, nothing was effected by the heat. Just some deposition in the repellers and the exit electrode
The capton wires used for wiring the electrodes had some problem with heat and went black and got brittle - for the next test we will ad a Ta schield at the side of the source to prevent radiation inside the source. |
Attachment 1: heatint_rfq_dec11_2012.PNG
|
|
Attachment 2: heatint_rfq_dec12_2012.PNG
|
|
246
|
Thursday, December 13, 2012, 08:40 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting | Thursday, December 13, 2012, 08:38: TBHT and TGHT off
Thursday, December 13, 2012, 08:38 : Vacuum at 1.8E-7 T
Thursday, December 13, 2012, 08:38 : Turbos off
Thursday, December 13, 2012, 11:19: Venting
Thursday, December 13, 2012, 11:30: Water lines purged
Thursday, December 13, 2012, 11:41: Target removed for inspection. |
248
|
Friday, December 14, 2012, 14:24 |
Sebastian Raeder | RFQ empty | | | | | | | Venting | Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target |
249
|
Friday, December 14, 2012, 15:28 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting |
Sebastian Raeder wrote: |
Friday, December 14, 2012, 14:24 Stop Turbopumps and prepare venting to insert RFQ target
|
Friday, December 14, 2012, 15:27 : Venting |
250
|
Friday, December 14, 2012, 20:34 |
Sebastian Raeder | RFQ empty | | | | | | Done | pumping down | Friday, December 14, 2012, ~ 17:00: start roughing pumps
Friday, December 14, 2012, 20:33: start turbo pumps
Friday, December 14, 2012, 20:42 : turbos at speed
Friday, December 14, 2012, 20:43 : vacuum at 7.32E-6T
Monday, December 17, 2012, 12:53 vacuum at 1.77E-7T |
251
|
Monday, December 17, 2012, 22:35 |
Sebastian Raeder | RFQ empty | | | | | | | wire connection for RFQ test | Overview over the connections of the new 9Pin connector inside the vacuum and in the HV cage
1&2 : RFQ rods in the vacuum, RFQ Driver in HV cage
4: Repeller electrode, grounded in HV cage
5: Exit electrode , grounded in HV cage
6&7: thermocouple at the center block, w/o HV to OMEGA thermocouple display, with HV should be connected to GND with 1k-10kOhm (to allow a shift of the target)
8&9: not connected, grounded in HV cage
View on top of the feedthrough and the connector on the source tray (male connectors)
__________________
\ 1 2 3 4 5 /
\ 6 7 8 9 /
----------------------
1to1 connection for pins 1,2,4-9
Pin 3 is NOT CONNECTED
The pin pairs 1&2, 4&5, 6&7, 8&9 each use a line of twisted pairs |
253
|
Tuesday, December 18, 2012, 16:00 |
Sebastian Raeder | RFQ empty | | | | | | Done | target heating | Tuesday, December 18, 2012, ~ 13:00 start ramping the TGHT current, vacuum at 1.7E-7T
Tuesday, December 18, 2012, 15:56: @ 250A, target is glowing, center block is cooler (can be inspected with a new hole in the heatshield lid), thermocouple is reading 224C, which is definitely colder than the temp from visual insepection, reading may be corrupted from contact to Heatschield
Tuesday, December 18, 2012, 23:11: target at 600A(593A/7.35V Panel reading), vacuum was up to 1.7E-6T, now 1.34E-6T. temperature reading was 405C which is quite away from glowing. Nevertheless, the center block of the target is visibly colder than the legs, while the center support is still way colder then the block. Thermocouple readback removed from HV cage. since the is a short cut the target (thermocouple?) the RFQ can be biased to 18V for suppression. everything locked up and stat HV test.
Wednesday, December 19, 2012, 00:14: target at 600A(593A/7.35V Panel reading), vacuum at 8.5E-7T, first HV test done, up to 30kV some occasional sparks. RFQ (1MHz , 40Vpp) without bias--> no signal, RFQ -9V biased --> 1.5E-11 on TMS:FC0
Wednesday, December 19, 2012, 01:17 : vacuum at7.7E-7T, start cooling down, was ~ 2.5h at max current. |
Attachment 1: heatint_rfq_dec18_2012.PNG
|
|
Attachment 2: heatint_rfq_dec18_2012_detail.PNG
|
|
261
|
Friday, January 04, 2013, 15:07 |
Anders Mjos | RFQ empty | | | | | | In progress | Pumping down | Friday, January 04, 2013, 15:04: Roughing
Friday, January 04, 2013, 15:24: Starting turbos
Friday, January 04, 2013, 15:33 : Turbos at speed
Friday, January 04, 2013, 15:34 : Vacuum at 1.7E-5 T |
262
|
Monday, January 07, 2013, 14:52 |
Sebastian Raeder | RFQ empty | | | | | | | heating target | heating target for RFQ tests. Now the wiring is insulated with alumina beats and tubing and the target has the standard Ta alkali element mixture
Unfortunately I deleted some entries, so here a short summary in combination with a screenshot of the striptool
heated to 580A, vacuum increased over time from 4.8 to 5.6E-7T
HV up to 30kV - current of 37 uA - seems fine
Mass scan not possible, ops found a water leak in the magnet PS, optics around the magnet are thereofre also not available and red in EPICS
NOTE: all FC values are in reversed bias!!
source +4.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 2E-9A at FC0
one spark observed
source -5.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 4E-11A at FC0
source -12V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 5E-11A at FC0
two sparks observed
source +4.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 3E-10A at FC0
source -5.5V, 2nd Rep 0V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up - done again since not sure if the restore of the tune was done properly for this
about 4E-11A at FC0
done, source +4.5V, 2nd Rep +12V: RFQ offs =0V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
about 3E-10A at FC0
1 spark during HV ramping
done, source +4.5V, 2nd Rep&exit +12V: RFQ offs =+12V, RFQ Ampl = 20V, 1 MHz (current 0.26A), locked up
there is something visible <~ 2E-12A at FC0
reduced current to 550A and leave it over night.
Short summary:
suppression possible but RFQ has to be shifted, the "only source shift" mode yielded a worse suppression than expected - unfortunately no mass scans have been possible, which would help to get some information on possible effects
|
Attachment 1: RFQ_with_signal_total.PNG
|
|
Attachment 2: RFQ_with_signal.PNG
|
|
263
|
Wednesday, January 09, 2013, 10:39 |
Anders Mjos | RFQ empty | | | | | | In progress | Venting | Wednesday, January 09, 2013, 10:38: Turbos off. Vacuum at 1.7 E-7 T
Wednesday, January 09, 2013, 13:24 : Venting with nitgogen
Wednesday, January 09, 2013, 14:12: Target removed |
266
|
Friday, January 11, 2013, 11:02 |
Anders Mjos | RFQ empty | | | | | | | Target installed, pumping down | Target installed with 120 in lbs torque on target legs and on central support.
Friday, January 11, 2013, 11:01: Roughing
Friday, January 11, 2013, 11:25: Start turbos - SR
Friday, January 11, 2013, 11:34: turbos at speed - SR
Friday, January 11, 2013, 11:35: vacuum at 1.2E-5T - SR
|
267
|
Monday, January 14, 2013, 13:51 |
Sebastian Raeder | RFQ empty | | | | | | In progress | heating | Started heating the target, now Silica sleevings are installed for wire insulation and the gap target -- repeller is now 0.6mm (was 0.25mm) |
269
|
Tuesday, January 15, 2013, 15:12 |
Sebastian Raeder | RFQ empty | | | | | | | Start cooling | Start cooling of Target RFQ empty |
270
|
Tuesday, January 15, 2013, 16:10 |
Anders Mjos | RFQ empty | | | | | | | Turbos off |
Sebastian Raeder wrote: |
Start cooling of Target RFQ empty
|
Tuesday, January 15, 2013, 16:09: Turbos off
Tuesday, January 15, 2013, 21:15: Start venting with nitrogen- SR |
271
|
Wednesday, January 16, 2013, 01:06 |
Sebastian Raeder | RFQ empty | | | | | | | Target installed - pumping down | RFQ empty target installed
Wednesday, January 16, 2013, 01:05: roughing started
Wednesday, January 16, 2013, 01:34: turbos started
Wednesday, January 16, 2013, 01:43: turbos at speed
Wednesday, January 16, 2013, 01:44: vacuum at 1.7E-5T |
|