64
|
Thursday, March 08, 2012, 17:39 |
Friedhelm Ames | | | | | | | Problems/Solutions | TPS:Q2 amd TMS:MB1 failed | TPS:Q2 and TMS:MB1 failed during the scan.
-> restarted. |
|
63
|
Thursday, March 08, 2012, 17:16 |
Friedhelm Ames | Nb#6 | | | | | | | mass scan started | |
|
62
|
Thursday, March 08, 2012, 14:08 |
Friedhelm Ames | Nb#6 | | | | | | | heater ramped up | heaters have reached final values TGHT
580 A, TBHT 230 A, some sparking during ramp
up. see strip tool image attached |
|
61
|
Thursday, March 08, 2012, 09:14 |
Friedhelm Ames | Nb#6 | | | | | | | continue target heating | continue target heating up to 580 A. Strip
tool for the heating up to 300A from yesyerday
see below |
|
60
|
Wednesday, March 07, 2012, 17:44 |
Friedhelm Ames | Nb#6 | | | | | | | ramping up heaters | ramping up heaters has been started by
ISAC ops. |
|
59
|
Wednesday, March 07, 2012, 13:48 |
Friedhelm Ames | Nb#6 | | | | | | | high voltage conditioning | High voltage conditioning has been started
by ISAC ops. Einzel lens is unstable below
5 kV., o.k. above this. |
|
58
|
Wednesday, March 07, 2012, 10:36 |
Paul Mocock | | | | | | | | HV conditioning begins. | HV conditioning has begins. Vacuum chamber
pressure is currently 3.2e-07 Torr on TSG:IG1. |
|
57
|
Wednesday, March 07, 2012, 09:27 |
Friedhelm Ames | Nb#6 | | | | | | Done | water cooling started | water cooling line valves opened. No response
on vacuum TSG:IG1 3.5e-7 T |
|
56
|
Tuesday, March 06, 2012, 15:51 |
Friedhelm Ames | | | | | | | | turbopumps in mass separator section started | |
|
55
|
Tuesday, March 06, 2012, 15:25 |
Pierre Bricault | | | | | | | | ISAC test stand | Turbos at full speed. P = 1.5E-05 T |
|
54
|
Tuesday, March 06, 2012, 15:17 |
Pierre Bricault | | | | | | | | ISAC test stand | Start turbo pumps at 1514H |
|
53
|
Tuesday, March 06, 2012, 15:15 |
Pierre Bricault | | HP-SIS | | | | | | ISAC test stand two turbos replaced | Vac group has replaced the two turbo pumps. |
|
52
|
Monday, March 05, 2012, 19:31 |
Friedhelm Ames | | | | | | | Failed | turbo pumps failed | Both turbo pumps at the source box cannot
be started. A fault report has been issued. |
|
51
|
Monday, March 05, 2012, 14:41 |
Friedhelm Ames | | | | | | | | vacuum and optics switched off | vacuum and optics at teststand switched
off to allow work on the water cooling system. |
|
50
|
Friday, March 02, 2012, 13:28 |
Anders Mjos | FEBIAD test | | | | | | | Venting test stand | Venting for target exchange |
|
49
|
Friday, March 02, 2012, 08:53 |
Anders Mjos | FEBIAD test | | | | | | Problems/Solutions | Tube heater insulator glowing | The insulator for the tube
heater was observed to be glowing with a
blue shine when the target was on high voltage. |
|
48
|
Thursday, March 01, 2012, 17:10 |
Friedhelm Ames | | | | | | | | start ramping down of heaters | |
|
47
|
Thursday, March 01, 2012, 17:09 |
Friedhelm Ames | | | | | | | | new mass scan |
|
|
46
|
Thursday, March 01, 2012, 17:05 |
Friedhelm Ames | | | | | | | | start heater ramping down | |
|
45
|
Thursday, March 01, 2012, 17:04 |
Friedhelm Ames | | | | | | | | new mass scan | bigger mass scan after separator optimization
and with finer step size
|
|