Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 7 of 8  Not logged in ELOG logo
ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  16   Tuesday, September 27, 2011, 10:36 Anders MjosTaC#1LP-SISITETM138634-636833-6Problems/SolutionsMaterial deposited on Extraction Electrode after Test Stand

    

       
            
 Deposited_material.pdf 
  24   Wednesday, July 04, 2012, 11:32 Anders MjosUO2/Nb #1LP-FEBIADITETM438481-939069-3Spenttarget assembled

    

       
            
 UO2#3_Anode_End_Cap.xlsx 
  30   Tuesday, December 11, 2012, 15:44 Anders MjosSiCHP-FEBIADITWTM4nana (old style fittings)ReadyTest target for the Conditioning Station The target has been used for operator
training previously at the ISAC Test Stand.

    9-pin connector was completed
  
  77   Thursday, July 06, 2017, 15:36 Anders MjosTa#55LP-SIS  42218-11 ReadyTa#55 target descriptionTarget loaded by Matt yesterday
320 foils = 33.7832 g
4 x 20 packs = 9.1170 g
  
  82   Thursday, June 21, 2018, 11:34 Aaron SchmidtTa#56HP-SIS  42218-9 ReadyTa#56 target description Thursday, June 21, 2018, 11:33:
Ta#56 HP-SIS target
 Ta#56_Loading_Data.pdf 
  87   Monday, October 15, 2018, 07:36 Aaron SchmidtTa#57 ITETM441177-3  Ta#57 Target Description.(Laura Lambert: Evap 2 Elog ID: 404) Tuesday,
April 17, 2018, 10:20
  
  89   Friday, May 31, 2019, 16:11 Aaron SchmidtTa#58LP-SISITETM243044-442972-7ReadyTa#58 Target desription Ta#58 LP-SIS  Ta#58_Loading_data.pdf 
  92   Tuesday, September 17, 2019, 08:47 Aaron SchmidtTa#59LP-SIS TM244062-5 In progressTa#59 Target descriptionTuesday, September 17, 2019, 08:44: 
T
 Ta#59_Loading_Data.pdf 
  98   Thursday, February 20, 2020, 08:11 Aaron SchmidtTa#60LP-SIS  44139-13 ReadyTa#60 Target Description Thursday, February 20, 2020, 08:07: 
Ta#60 LP-SIS target description:
 Ta#60_Loading_Data.pdf 
  102   Tuesday, October 06, 2020, 14:25 Aaron SchmidtTa#61LP-SISITETM444508-1 In progressTa#61 Target Description Ta#61 LP-SIS target
description:
  
  103   Tuesday, October 27, 2020, 12:53 Aaron SchmidtNb#9LP-SISITETM444508-2 ReadyNb#9 LP-SIS target description Nb#9 LP-SIS target description:
 Nb#9_Target_Loading_data.pdf 
  106   Thursday, April 08, 2021, 09:54 Aaron SchmidtTa#62LP-SIS  44139-10 ReadyTa#62 target descriptionTa#62 LP-SIS target description:
  
  108   Wednesday, June 23, 2021, 18:13 Aaron SchmidtTa#62LP-SISITETM444691-4 In progressTa#62 Target Description (2) Ta#62 LP-SIS target
description: (REPLACEMENT FOR 44139-10)
  
  114   Wednesday, November 10, 2021, 18:09 Aaron SchmidtTa#63LP-SISITETM444691-11 In progressTa#63  Ta#63 LP-SIS target
description: 
 Ta#63_Target_Loading_Data.pdf 
  116   Thursday, June 02, 2022, 16:55 Aaron SchmidtTa#64LP-SISITETM444691-12 In progressTa#64 Target DescriptionThursday, June 02, 2022, 16:54: 
Ta#64 LP-SIS target
 Ta#64_Target_Loading_Data.pdf 
  127   Monday, March 06, 2023, 13:38 Aaron SchmidtTa#65LP-SIS  45220-7 ReadyTa#65 Target Description. Monday, March 06, 2023, 13:38:
Ta#65 LP-SIS target description: 
  
  128   Friday, March 10, 2023, 07:21 Aaron Schmidt      ReadyTarget Material Batch - Ta Tantalum - Standard foils.
MTR PO: TR-2022-03028
Average foil thickness: 0.0013"
 Ta_2023_-_01.pdf 
  132   Friday, June 23, 2023, 09:02 Aaron SchmidtNb#10LP-IG-LISITWTM245447-7  Nb#10 target description. Nb#10 LP-IG-LIS target
description:
  
  135   Thursday, August 24, 2023, 14:16 Aaron SchmidtNb#11LP-IG-LISITWTM245447-9 In progressNb#11 Target descriptionNb#11 LP-IG-LIS target description:
 Nb#11_Target_Loading_Data.pdf 
  136   Wednesday, September 20, 2023, 14:25 Aaron SchmidtTa#66LP-SISITWTM245220-5 In progressTa#66 Target description.Ta#66 LP-SIS target description: 
 Ta#66_Target_Loading_Data.pdf 
ELOG V2.9.2-2455