Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 6 of 8  Not logged in ELOG logo
ID Date Author Target/No.#down Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  58   Wednesday, September 30, 2015, 17:08 John WongTa # 46HP-SIS  41369-3 ReadyTa#46 target description

Laura Lambert wrote:

 Thursday, September 10, 2015, 13:31

Ta#46 HP-SIS target description:

Total Ta foils = 505

Foil Thickness = 0.025mm

Target density = 16.69 g/cm3

Target length = 3.4cm

Total Mass = 75.2772g


 

 Wednesday, September 30, 2015, 17:01

The average mass per disc = 0.105g

Total mass (505 discs + some Ta wire for packing) = 53.876g  ( Not 75.277g as mentioned above.  See Target Logbook 2015 Dropbox for more details)


 

  49   Wednesday, April 01, 2015, 11:27 Laura LambertTa # 45HP-SIS  38817-5 In UseTa#45 target description

 Wednesday, April 01, 2015, 11:25

Ta#45 HP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 13.48 g/cm3

Target length = 3.4cm

Total Mass (400 foils + Ta wire) = 45.8181g


 
  43   Tuesday, July 15, 2014, 10:54 Laura LambertTa # 43LP-SISITWTM140282-2 ReadyTa # 43 Target Description

 Tuesday, July 15, 2014, 9:45

Ta#42 LP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 16.69 g/cm3

Target length = 4.9cm

Total Mass (400 foils + Ta wire) = 45.920g

 

 

 

 

 

 

  139   Tuesday, March 05, 2024, 10:15 Aaron SchmidtTaLP-SIS  45447-15 ReadyTa# (March stock) Target Description.

Tuesday, March 05, 2024, 10:12: Ta# (Stock - Loaded today) LP-SIS target description: 

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.033mm (0.0013") avg Measured. 

Target material batch: Ta 2023-1  Mt'l PO# TR-2022-03028

Target density = 18.2 g/cm3

Target length = 3.4 cm

Total Mass = 61.9 g [Incl foils + Ta wire on 6 packs]

Total mass w/ Target oven =  459.6 g (w/ end caps)

Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack

Dimpling direction on foils/ Packs.                                                               --> Center <--

End caps installed (Not expanded). No Ta foil heat shield added.

  141   Friday, June 14, 2024, 14:12 Darwin Ortiz RosalesSiC#46HP-SIS  44692-245235-6ReadySiC#46_description
Attachment 1: SiC#46.png
SiC#46.png
  131   Friday, May 26, 2023, 11:53 Darwin Ortiz RosalesSiC#45HP-SIS  44692-3 Ready 
Attachment 1: SiC#45.png
SiC#45.png
  121   Tuesday, August 16, 2022, 09:48 Darwin Ortiz RosalesSiC#44HP-FEBIAD  37978-1 ReadyTarget SiC#44 Description

Tuesday, August 16, 2022, 09:47

  117   Monday, June 20, 2022, 10:35 Darwin Ortiz RosalesSiC#43HP-FEBIAD  42464-1 ReadyTarget SiC#43 Description

Monday, June 20, 2022, 10:33

  118   Tuesday, June 21, 2022, 15:34 Matthew GareauSiC#42, SiC#43  TM2  Problems/SolutionsMultipin guide pin issues

 While removing the SiC#42 it became apparent that the multipin guide pin had become loose again and was not allowing the target to dismount from the module.

The multipin shoulder bolts were removed and then the multipin was able to be pried off.

However the NHC manipulator were not able to reach the guide pin to remove it, which would be required before the SiC#43 could be installed.

The target module was then moved to the SHC where the guide pin could be removed and the installation of SiC#43 took place, along with the transfer of the parasitic attachment onto the SiC#43.

This problem seems to suggest that the multipin could use some redesign to ensure smoother target exchanges.

  115   Wednesday, May 25, 2022, 10:15 Darwin Ortiz RosalesSiC#42HP-FEBIAD  44692-9 ReadyTarget SiC#42 Description

Wednesday, May 25, 2022, 10:15

Attachment 1: Description-SiC#42.png
Description-SiC#42.png
  110   Monday, September 13, 2021, 14:53 Darwin Ortiz RosalesSiC#41HP-SIS  42218-7 ReadyTarget SiC#41 Description

Monday, September 13, 2021, 14:52

Attachment 1: Screenshot_2021-09-13_144830.png
Screenshot_2021-09-13_144830.png
  99   Wednesday, April 15, 2020, 08:10 Darwin Ortiz RosalesSiC#40HP-SIS  42218-8 ReadyTarget SiC#40 Description

Wednesday, April 15, 2020, 07:51

See attached picture for description 

Attachment 1: Annotation_2020-04-15_080836.png
Annotation_2020-04-15_080836.png
  97   Friday, November 29, 2019, 10:53 Darwin Ortiz RosalesSiC#39HP-FEBIAD TM242464-3 ReadyTarget SiC#39 Description

Friday, December 06, 2019, 15:34

Added SEM images (see attachment#2) - JW


 

Attachment 1: SiC#39_description.PNG
SiC#39_description.PNG
Attachment 2: SiC39_SEM.pdf
SiC39_SEM.pdf SiC39_SEM.pdf SiC39_SEM.pdf SiC39_SEM.pdf
  94   Friday, October 11, 2019, 09:26 Darwin Ortiz RosalesSiC#38HP-FEBIAD TM242464-4 ReadyTarget SiC#38 Description

Friday, October 11, 2019, 09:25

See attached picture for description.

 

Attachment 1: SiC#38.PNG
SiC#38.PNG
  80   Wednesday, September 27, 2017, 09:14 Laura LambertSiC#37HP-FEBIADITETM439530-10 ReadySiC#37 target description

 Wednesday, September 27, 2017, 09:13

See attachment for target description.


 

Attachment 1: Target_Description.JPG
Target_Description.JPG
  74   Tuesday, May 30, 2017, 15:15 Laura LambertSiC#36HP-FEBIAD-CTL TM241369-10 ReadySiC#36 target description

 Tuesday, May 30, 2017, 15:12

See attachment for target description.


 

Attachment 1: SiC#36_Target_Description.JPG
SiC#36_Target_Description.JPG
  68   Friday, October 07, 2016, 16:27 John WongSiC#35HP-FEBIAD  39530-9 ReadySiC35 Target description

Friday, October 07, 2016, 16:28

See attachment for the target description


 

Attachment 1: SiC35_target_description.JPG
SiC35_target_description.JPG
  67   Friday, September 02, 2016, 14:45 John WongSiC#34LP-IG-LIS  39814-V2-1 ReadySiC#34 Target Description

 Friday, September 02, 2016, 14:43

See attachment for target description 


 

Attachment 1: SiC34_target_description.JPG
SiC34_target_description.JPG
  57   Thursday, September 24, 2015, 13:42 Laura LambertSiC#32HP-FEBIAD  39530-5 ReadySiC#32 target description

 Thursday, September 24, 2015, 11:46

See attachment for target description.


 

Attachment 1: elog_snapshot.JPG
elog_snapshot.JPG
  51   Wednesday, April 29, 2015, 15:39 Laura LambertSiC#31HP-SIS  38817-7 ReadySiC#31 Target description

 Wednesday, April 29, 2015, 15:30

SiC#31 HP-SIS target description: 

Total SiC foils = 520 discs 

Total mass SiC + C_grv foils = 60.2441 g (before sintering, expecting ~13% loss of organic mass after burnt off) 

Average mass SiC/disc (without C_grv) = 0.0853g

Average thickness SiC (without C_grv) = 0.2093mm 

Total packed length = 17cm

See attachment #1 for the density measurement.  


 

Attachment 1: final_density_measurements.JPG
final_density_measurements.JPG
Attachment 2: density_measurements.xlsx
Attachment 3: SiC_density_Jan_10_'14_cast_-_Copy.xlsx
Attachment 4: SiC_density_Oct_31_'14_cast.xlsx
ELOG V2.9.2-2455