Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 6 of 8  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject
  57   Thursday, September 24, 2015, 13:42 Laura LambertSiC#32HP-FEBIAD  39530-5 ReadySiC#32 target description

 Thursday, September 24, 2015, 11:46

See attachment for target description.


 

  80   Wednesday, September 27, 2017, 09:14 Laura LambertSiC#37HP-FEBIADITETM439530-10 ReadySiC#37 target description

 Wednesday, September 27, 2017, 09:13

See attachment for target description.


 

  42   Friday, June 06, 2014, 14:09 John WongUCx#9LP-SIS  39165-9 ReadyUCx#9 - Target description

 Friday, June 06, 2014, 14:08

See attachment for the target description


 

  32   Thursday, April 11, 2013, 14:30 John WongTa#39LP-SISITWTM139165-7 SpentTa#39 target description

Ta#38 LP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 16.69 g/cm3

Target length = 4.1cm

Total Mass (400 foils + Ta wire) = 43.15g

Disc area = 2.12 cm2

Ta thickness = 20.354g/cm2

See link for more details:

http://documents.triumf.ca/docushare/dsweb/View/Collection-9934


 

  28   Wednesday, September 12, 2012, 01:53 John WongNb#7LP-SIS  39165-6 SpentNb#7 target description

 Wednesday, September 12, 2012, 02:10

Nb#7 target description: 

Total Nb foils = 400 discs

Total Nb mass (Nb foils + Ta wires) = 26.529g 

Total length (after filled) = 4.6cm 

(see attachment #1) 

  33   Thursday, May 30, 2013, 16:58 John WongUCx#6LP-SIS TM139165-639230-8SpentUCx#6 - target description

 Thursday, May 30, 2013, 16:57

UCx#6 target specification, see attachment #1. 

The target is currently undergoing the final conditioning in the Evaporator#1.


 Wednesday, June 12, 2013, 17:10

Target is assembled and stored in the Ar glove box.

It's ready to go into the Hotcell.


 

  27   Wednesday, August 29, 2012, 14:52 John WongUCx#5LP-SISITWTM439165-5 FailedUCx#5 target description

Wednesday, August 29, 2012, 14:50

UCx#5 target description, see attachment#1

The target is currently undergoing the final conditioning in the Evaporator #1. 


 Wednesday, December 05, 2012, 15:46

This target was broken right before the end of the final run.  The target was inspected today inside the Hotcell and the pictures can be found here: http://documents.triumf.ca/docushare/dsweb/View/Collection-9357

Looks like the protective layer (TaC coating) was worn out over the course of the run time. 

We need to improve the target coating so this can be prevented in the future.

More info about this later...


 

  22   Friday, June 01, 2012, 11:43 John WongTa#38LP-SISITWTM139165-238633-2SpentTa#38 target description

Ta#38 LP-SIS target description:

Total Ta foils = 400

Foil thickness = 0.025mm

Target density = 16.69 g/cm3

Target area = 2.12cm2

Target length = 4.3cm

Total Mass (400 foils + Ta wire) = 42.8013g

See the link for more details: http://documents.triumf.ca/docushare/dsweb/View/Collection-8541


Friday, June 01, 2012, 11:36

The target is now in the test-stand, and by next week Tuesday, it should go in the Hotcell.

 


 Monday, June 04, 2012, 16:56

The target was tested in the Test-stand.  The EE was inspected and a small amount of deposit was discovered after the test (the same stuff was found on Ta#36),  see attachment #1.  The samples were collected and will be analyzed through SEM/EDX/XRD.

The EE and the common plate were cleaned with methanol and were assembled back.

The target is ready to go in the Hotcell tomorrow, June 05.


 Monday, November 05, 2012, 16:42

The deposits on the EE and CC were analyzed using XRD

On the EE, it was mainly copper hydroxide nitrate, Cu2(OH)3(NO3). (see attachment #2)

On the CE, it was mainly tantalum, Ta. (see attachment #3)


 

  44   Tuesday, July 15, 2014, 11:01 Laura LambertUCx # 10LP-SISITETM439165-10 ReadyUCx#10 Target Description

Tuesday, July 15, 2014, 10:58

See attachment for target description 

  47   Thursday, September 25, 2014, 16:01 Laura LambertTa#44HP-SISITETM438817-940316-11ReadyTa#44 target description

Thursday, September 25, 2014, 15:59

Ta#44 HP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 16.69 g/cm3

Target length = 4.5cm

Total Mass (400 foils + Ta wire) = 47.49g


 

  40   Monday, March 31, 2014, 15:02 John WongTiC#4HP-SIS  38817-839956-10SpentTarget Description

 Monday, March 31, 2014, 15:00

Target consists of 360 discs of TiC + graphite foils. 

Total length = 11.7cm 

Total green mass = 40.945g

(see attachment for more details) 


 

 

  51   Wednesday, April 29, 2015, 15:39 Laura LambertSiC#31HP-SIS  38817-7 ReadySiC#31 Target description

 Wednesday, April 29, 2015, 15:30

SiC#31 HP-SIS target description: 

Total SiC foils = 520 discs 

Total mass SiC + C_grv foils = 60.2441 g (before sintering, expecting ~13% loss of organic mass after burnt off) 

Average mass SiC/disc (without C_grv) = 0.0853g

Average thickness SiC (without C_grv) = 0.2093mm 

Total packed length = 17cm

See attachment #1 for the density measurement.  


 

  49   Wednesday, April 01, 2015, 11:27 Laura LambertTa # 45HP-SIS  38817-5 In UseTa#45 target description

 Wednesday, April 01, 2015, 11:25

Ta#45 HP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 13.48 g/cm3

Target length = 3.4cm

Total Mass (400 foils + Ta wire) = 45.8181g


 
  21   Thursday, May 24, 2012, 11:04 John WongSiC#27HP-SISITETM438817-339069-2SpentHP-SIS SiC27 target description

 Thursday, May 24, 2012, 10:34

SiC#27- HPSIS target description: 

Total SiC foils = 240 discs

Total SiC+ C-grv = 27.79g

Total length = 8.3cm 

Average mass of SiC/disc (without C-grv) = 0.085g 

Average thickness of SiC (without C-grv) = 0.24mm  

No Rh foil added

Salt added = 10uL Li, 10uL Na 

see attachment#1: SiC#27_density measurements

see link for more details: http://documents.triumf.ca/docushare/dsweb/View/Collection-8530


 

  11   Wednesday, July 06, 2011, 14:29 John WongNb/SpareHP-SIS  38817-2 In progressTarget ready for Assembly

Target oven w.o# 38817-2:

inner diameter: left = 18.29mm, right = 18.16mm.

Filled with 400 foils Nb (16pk, 5 foils/pk).  

Discs spec: 18.65mm/14.65mm, thickness = 0.022mm  

Total mass + Ta-wire = 22.66g

total length = 4.5cm

Rn foil inserted for ionization.  (0.1mm, 0.004", 1cm x 1cm)  

 

 

  37   Friday, October 25, 2013, 17:35 John WongTa#41HP-SISITWTM438817-10 SpentTa#41 target description

Friday, October 25, 2013, 17:35

Ta#41 HP-SIS target description:

Total Ta foils = 400

Foil Thickness = 0.025mm

Target density = 16.69g/cm3

Target length = 4.0cm

Total Mass (400 foils + Ta wire) = 42.19g


 

  8   Thursday, June 16, 2011, 17:26 John WongNbHP-SIS  38817-1 SpentTarget is ready and stored in cabinet

 Thu Jun 16 17:21:10 2011

Two targets of Nb-HP-SIS are complete and ready to be installed in the heat shields:

-----------------------------------------------------------------------------------

Target oven w.o# 38817-1:

inner diameter: left = 18.27mm, right = 18.25mm.

Filled with 400 foils Nb (16pk, 5 foils/pk).  

Discs spec: 18.65mm/14.65mm, thickness = 0.022mm  

Total mass + Ta-wire = 22.74g

Total length = 4.5cm

Rn foil inserted for ionization.  (0.1mm, 0.004", 1cm x 1cm)  

 

------------------------------------------------------------------------------------

Wednesday, July 06, 2011, 14:35: Salts were added and tested in test-stand last 2 weeks.

 

  25   Friday, July 20, 2012, 11:39 John WongUCx#4LP-SISITWTM138634-936833-4SpentUCx#4 target description

Friday, July 20, 2012, 11:35

UCx#4 target description, see attachment#1

The target is assembled and stored in the Ar-glove box.  It will be transported to the South Hotcell on July 31, 2012.


 

  13   Tuesday, August 09, 2011, 14:31 John WongUCx#2LP-SISITWTM138634-838633-5SpentUCx#2 run is finished.

UCx#2 Spec:

Target wrapped with 3 Ta-heat shields

Target length = 11.2cm

Total UC2/C foils = 245 discs

Total U/cm2 = 15.27g

Standard salts = 10uL Na, 10uL Li


Tuesday, August 09, 2011, 14:27: 

Target came out from the glovebox and transported to the cold lab for assembly.  During the assembly, one of the screw-heads for the heat-shield broke (see attachment#1: broken_screwhead). 

The target was leak checked and fine. 

Target is going back to the glovebox to be kept under Ar until RH is ready (see attachment #2: UCx#2).


 Tuesday, October 04, 2011, 10:21

UCx#2 run was finished last week.  

Target was moved from ITW to south hot cell, and stored in a bucket under argon feed. 


 

  35   Friday, August 30, 2013, 12:08 John WongUCx#7LP-SISITWTM138634-739230-4SpentUCx#7 - target description

Friday, August 30, 2013, 12:06

UCx#7 target specification, see attachment #1.

The target is assembled and going online soon.


ELOG V2.9.2-2455