Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 5 of 8  Not logged in ELOG logo
Entry  Tuesday, May 16, 2017, 13:18, Laura Lambert, UCx#20, LP-IG-LIS, ITE, TM4, 42218-1, , Ready, UCx#20 Target Description target_description.JPG
 Tuesday, May 16, 2017, 13:13
Attached please find the UCx#20 target description.

 
Entry  Thursday, November 29, 2018, 14:23, Marla Cervantes, UCx#26, LP-IG-LIS, , , 42281-3, , Ready, UCx#26 Target description UCx_26-description.JPG
Thursday, November 29, 2018, 14:20
Attached please find the UCx#26 target description. 

 
Entry  Wednesday, September 29, 2021, 10:37, Darwin Ortiz Rosales, UCx#35, LP-IG-LIS, , , 42218-5, , Ready, UCx#35-Target_description UCx#35_Target_Description_.png
 

      
Entry  Tuesday, August 09, 2022, 11:02, Darwin Ortiz Rosales, UCx#39, LP-IG-LIS, , , 42218-4, , Ready, UCx#39_Target_Description UCx#39_Description.png
 
Entry  Friday, June 23, 2023, 09:02, Aaron Schmidt, Nb#10, LP-IG-LIS, ITW, TM2, 45447-7, , , Nb#10 target description. 
 Nb#10 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Entry  Thursday, August 24, 2023, 14:16, Aaron Schmidt, Nb#11, LP-IG-LIS, ITW, TM2, 45447-9, , In progress, Nb#11 Target description Nb#11_Target_Loading_Data.pdf
Nb#11 LP-IG-LIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm (0.001")
Entry  Tuesday, November 12, 2024, 12:49, Darwin Ortiz Rosales, UCx#46, LP-IG-LIS, , , 42218-2, , Ready, UCx#46_Description UCx#46_Description.png
 
Entry  Friday, July 13, 2018, 14:41, John Wong, UCx#23, LP-FEBIAD-CTL, , , , , Ready, UCx#23 target description UCx_23-target_description.JPG
Friday, July 13, 2018, 14:40
Target is ready for installation. 
See attachment for description
Entry  Monday, February 20, 2012, 16:39, John Wong, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, , Spent, target ready for assembly 
 Monday, February 20, 2012, 16:25
Mass of empty target oven used = 461.55g
Target oven filled with 402 discs of UO2/Nb, 5.0cm in length, and tot mass (before sintered) was 61.49g (UO2+Nb+org). 
    Reply  Wednesday, July 04, 2012, 11:32, Anders Mjos, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, 39069-3, Spent, target assembled UO2#3_Anode_End_Cap.xlsx


    
        
            John Wong wrote:
        
        
            
             Monday, February 20, 2012, 16:25
Entry  Wednesday, August 01, 2012, 09:37, Pierre Bricault, ITE-TM4-UO#3, LP-FEBIAD, ITE, TM4, , , Problems/Solutions, Short has developed while lowering the cathode heater 
 On tuesday July we lower the cathode heater to swap the anode-cathode bias. While lowering the cathode heater a short on the anode developed. 
The polarity swap was not possible because the target/tube assembly has also a short to common. 
We return the configuration has it was and we added two 100 Ohms: 5 W resistor between the common and the heaters to prevent current to flow back
Entry  Monday, May 01, 2023, 14:59, Darwin Ortiz Rosales, TiC #5, LP-FEBIAD, , , 44692-5, , Ready, Target TiC #5 Description TiC#5.png
 
Entry  Tuesday, October 24, 2023, 11:30, Darwin Ortiz Rosales, UCx#44, LP-FEBIAD, , , 41790-7, , Ready, UCx#44_Description UCx#44_Description.png
Three Ta heatshields left installed on container.
Entry  Tuesday, March 29, 2011, 14:14, John Wong, Ta#35, HP-SIS, ITE, TM4, 38481-3, 38303-4, Spent, ITE-TM4-Ta#35-Hp-SIS  Ta-HPSIS.jpg
ITE-TM4-Ta#35-Hp-SIS
Thu Apr  7 15:32:32 2011:
Target oven - w.o#38481-3.
Entry  Thursday, March 31, 2011, 15:38, John Wong, SiC#25, HP-SIS, ITE, TM4, 38481-1, 38307-?, Spent, ITE-TM4-SiC#25-Hp-SIS  big_mass_scan.jpg
Thu Mar 31 15:19:51 2011:  SiC#25 was made sometime in December of 2010.  It is now in the target module and ready to be conditioned. 
Mon Apr 18 18:17:05 2011: It was found later that no salt was added to this target after it came out from the test stand.  However, 
there were enough 40Ca and 39K  for tuning (See attachment#1 for the big mass scan).  Once the P+ is back, the yields will be measured.
Entry  Thursday, June 16, 2011, 17:26, John Wong, Nb, HP-SIS, , , 38817-1, , Spent, Target is ready and stored in cabinet  
 Thu Jun 16 17:21:10 2011
Two targets of Nb-HP-SIS are complete and ready to be installed in the heat shields:
-----------------------------------------------------------------------------------
Entry  Wednesday, July 06, 2011, 14:13, John Wong, Ta#40, HP-SIS, , , 38295-4, , Spent, Target description  
Details about Ta Hp surface, w.o#38295-4 (spare): 
This target was built as a spare.
 
Entry  Wednesday, July 06, 2011, 14:29, John Wong, Nb/Spare, HP-SIS, , , 38817-2, , In progress, Target ready for Assembly 
Target oven w.o# 38817-2:
inner diameter: left = 18.29mm, right = 18.16mm.
Filled with 400 foils Nb (16pk, 5 foils/pk).  
Entry  Thursday, May 24, 2012, 11:04, John Wong, SiC#27, HP-SIS, ITE, TM4, 38817-3, 39069-2, Spent, HP-SIS SiC27 target description SiC#27_specification.png
 Thursday, May 24, 2012, 10:34
SiC#27- HPSIS target description: 
Total SiC foils = 240 discs
Entry  Friday, October 25, 2013, 17:35, John Wong, Ta#41, HP-SIS, ITW, TM4, 38817-10, , Spent, Ta#41 target description 
Friday, October 25, 2013, 17:35
Ta#41 HP-SIS target description:
Total Ta foils = 400
ELOG V2.9.2-2455