Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 3 of 8  Not logged in ELOG logo
Entry  Wednesday, April 30, 2014, 16:36, John Wong, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, , Spent, SiC#30 Target description  SiC#30_density_measurements.xlsx
Wednesday, April 30, 2014, 15:16
Note:
This target was built in 2011.  The endcaps were replaced after they got vaporized in Evap#1 during the sintering process, and the target
Entry  Tuesday, July 15, 2014, 11:01, Laura Lambert, UCx # 10, LP-SIS, ITE, TM4, 39165-10, , Ready, UCx#10 Target Description UCx_10_target_description.PNG
Tuesday, July 15, 2014, 10:58
See attachment for target description 
Entry  Thursday, September 25, 2014, 16:01, Laura Lambert, Ta#44, HP-SIS, ITE, TM4, 38817-9, 40316-11, Ready, Ta#44 target description 
Thursday, September 25, 2014, 15:59
Ta#44 HP-SIS target description:
Total Ta foils = 400
Entry  Thursday, November 06, 2014, 13:35, Laura Lambert, UCx # 11, LP-SIS, ITE, TM4, 40282-5, , Ready, UCx#11 Target Description UCx_11_target_description.PNG
 Thursday, November 06, 2014, 13:29
See attachment for target description

 
Entry  Friday, July 10, 2015, 11:23, John Wong, UCx#13, LP-IG-LIS, ITE, TM4, 40860-1, , Ready, UCx#13 Target description UCx_13_target_description.PNG
 Friday, July 10, 2015, 11:15
Attached please find the UCx#13 target description.   
Note:  Target container was coated/sintered with TaC twice.  Would like to see if this will improve the life-span of the target.  
Entry  Friday, March 11, 2016, 10:18, Laura Lambert, Ta # 47, , ITE, TM4, , , Spent, Ta # 47 target desscription 
Friday, March 11, 2016, 10:13 
Ta#47 LP-SIS [new small center block] target description:
Total Ta foils = 470
Entry  Tuesday, May 16, 2017, 13:18, Laura Lambert, UCx#20, LP-IG-LIS, ITE, TM4, 42218-1, , Ready, UCx#20 Target Description target_description.JPG
 Tuesday, May 16, 2017, 13:13
Attached please find the UCx#20 target description.

 
Entry  Wednesday, September 27, 2017, 09:14, Laura Lambert, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, , Ready, SiC#37 target description Target_Description.JPG
 Wednesday, September 27, 2017, 09:13
See attachment for target description.

 
Entry  Monday, October 15, 2018, 07:36, Aaron Schmidt, Ta#57, , ITE, TM4, 41177-3, , , Ta#57 Target Description. 
(Laura Lambert: Evap 2 Elog ID: 404) Tuesday, April 17, 2018, 10:20
Target consists of 470 discs.
Total packed length 3.4cm [exactly 7.8cm space on both sides]
Entry  Friday, May 31, 2019, 16:11, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, 42972-7, Ready, Ta#58 Target desription Ta#58_Loading_data.pdf
 Ta#58 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Tuesday, July 30, 2019, 15:52, Darwin Ortiz Rosales, ZrC#8, LP-SIS, ITE, TM2, 43044-5, , Ready, Target description ZrC8.pngZrC_8_SEM.pdf
 
Tuesday, July 30, 2019, 15:50
See attachment for details
Entry  Tuesday, October 06, 2020, 14:25, Aaron Schmidt, Ta#61, LP-SIS, ITE, TM4, 44508-1, , In progress, Ta#61 Target Description 
 Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Tuesday, October 27, 2020, 12:53, Aaron Schmidt, Nb#9, LP-SIS, ITE, TM4, 44508-2, , Ready, Nb#9 LP-SIS target description Nb#9_Target_Loading_data.pdf
 Nb#9 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Thursday, November 12, 2020, 11:32, Darwin Ortiz Rosales, UCx#31, HP-SIS, ITE, TM4, 44160, 43822, Ready, UCx#31-Target_description UCx31-target_description.png
 Target full name ITE-TM4-UC#
Entry  Tuesday, March 16, 2021, 17:05, Luca Egoriti, ITE-TM4-UC#32-P2N-SIS, HP-SIS, ITE, TM4, -, -, In progress, UO2 discs cutting UC32-P2N_material_info.jpgFume_hood.jpg
This afternoon, Darwin prepared in the hot lab fume hood the two UO2 slurries to be cut into P2N target discs. Later, I took over cutting both slurries.
A total of 49 annular discs were cut and loaded into the P2N graphite container.
The discs thickness was measured by stacking 5 discs on each other, and measuring their thickness in two points.
Entry  Wednesday, June 23, 2021, 18:13, Aaron Schmidt, Ta#62, LP-SIS, ITE, TM4, 44691-4, , In progress, Ta#62 Target Description (2) 
 Ta#62 LP-SIS target description: (REPLACEMENT FOR 44139-10)
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Wednesday, November 10, 2021, 18:09, Aaron Schmidt, Ta#63, LP-SIS, ITE, TM4, 44691-11, , In progress, Ta#63 Ta#63_Target_Loading_Data.pdf
  Ta#63 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Thursday, June 02, 2022, 16:55, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, , In progress, Ta#64 Target Description Ta#64_Target_Loading_Data.pdf
Thursday, June 02, 2022, 16:54: 
Ta#64 LP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Tuesday, August 13, 2024, 10:08, Aaron Schmidt, Ta#67 Thin Foil Target, LP-SIS, ITE, TM2, 45447-14, 45235-10, Ready, Ta#67 Thin Foil Target description & Notes Certificate_of_Analysis_-_Ta_0.01mm.pdf
  Ta#67 Thin foil LP-SIS target description: 
Total Ta foils = 470 loaded into 2 packs of 235 foils each.
Entry  Friday, September 20, 2024, 14:26, Aaron Schmidt, Ta#, LP-SIS, ITE, TM2, 45447-18, 45235-13, Ready, Ta# Target Description 
Spare for Ta#68 Ta# LP-SIS
target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
ELOG V2.9.2-2455