Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 2 of 8  Not logged in ELOG logo
ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  44   Tuesday, July 15, 2014, 11:01 Laura LambertUCx # 10LP-SISITETM439165-10 ReadyUCx#10 Target Description

Tuesday, July 15, 2014, 10:58

See attachment for target description 

Attachment 1: UCx_10_target_description.PNG
UCx_10_target_description.PNG
  45   Monday, July 28, 2014, 15:57 John WongZrC#6LP-SISITWTM140282-3 SpentZrC target description

 Monday, July 28, 2014, 15:52

See attachment#1 for ZrC target description. 

Target is currently undergoing the sintering process


 

Attachment 1: ZrC#6.JPG
ZrC#6.JPG
  46   Monday, August 18, 2014, 14:39 Laura LambertThO2 #1LP-SIS     ThO2 #1 Target Description

Monday, August 18, 2014, 14:53

See attachment for target description


 

Attachment 1: ThO2#1_target_description.JPG
ThO2#1_target_description.JPG
  48   Thursday, November 06, 2014, 13:35 Laura LambertUCx # 11LP-SISITETM440282-5 ReadyUCx#11 Target Description

 Thursday, November 06, 2014, 13:29

See attachment for target description


 

Attachment 1: UCx_11_target_description.PNG
UCx_11_target_description.PNG
  50   Friday, April 17, 2015, 16:00 Laura LambertUCx # 12LP-SISITWTM141177-2 ReadyUCx#12 Target Description

 Thursday, April 16, 2015, 14:07

See attachment for target description

Attachment 1: UCx_12_target_description.PNG
UCx_12_target_description.PNG
  52   Wednesday, June 03, 2015, 10:55 Laura LambertZrC#7LP-SISITWTM241177-1 ReadyZrC#7 target description

 Wednesday, June 03, 2015, 10:53

Total length packed = 12.3cm

See attachment for target description.


 

Attachment 1: target_production_elog_ZrC#7.JPG
target_production_elog_ZrC#7.JPG
Attachment 2: ZrC#7_final_density.xlsx
  53   Monday, July 06, 2015, 12:18 John WongZrC#7LP-SISITWTM241177-1 FailedZrC#7 target description

Laura Lambert wrote:

 Wednesday, June 03, 2015, 10:53

Total length packed = 12.3cm

See attachment for target description.


 

 Monday, July 06, 2015, 12:10

This target did not pass the test-stand and will not be used for online (unless if it gets approved).  The target container is deformed.  An increase of voltage was observed during the test; perhaps it's a sign of the container being cracked?!  See Test-stand e-log#450 for more details.  

Another target is already prepared and being tested.  (Target Oven WO# 41177-2). 


 

  54   Tuesday, July 07, 2015, 13:00 John WongZrC#7LP-SISITWTM241177-2 ReadyZrC#7 (backup1) target description

Tuesday, July 07, 2015, 12:36 

Total no. discs = 422

Total packed length = 13.2 cm (measured after the sintering process) 

Note:  The theoretical length (ZrC + graphite foils) is 10.52cm    After the sintering process, the stack of discs expanded in length.  To avoid crushing the materials while inserting the endcaps, the discs are gentally packed to 13.2cm.

(see attachments for more details)


 

Attachment 1: ZrC#7_backup.PNG
ZrC#7_backup.PNG
Attachment 2: ZrC_specification_(backup#1_WO#41177-2).xlsx
  59   Monday, October 26, 2015, 16:33 Laura LambertUCx#14LP-SIS  41077-5 ReadyUCx#14 Target Description

 Monday, October 26, 2015, 16:23

Attached please find the UCx#14 target description.

Note: This is the first UCx target using the new LP-SIS small center block design.


 

 

 

 

Attachment 1: Capture.JPG
Capture.JPG
  60   Friday, March 04, 2016, 14:57 Laura LambertUCx#15LP-SISITW 41077-1 ReadyUCx#15 Target Description

 Friday, March 04, 2016, 14:56

Attached please find the UCx#15 target description.

Note: This is the second UCx target using the new LP-SIS small center block design.


 

Attachment 1: UCx_15_description.jpg
UCx_15_description.jpg
  65   Tuesday, August 02, 2016, 15:28 Laura LambertUCx#17LP-SIS  41790-3 ReadyUCx#17 Target Description

 Tuesday, August 02, 2016, 15:27

Attached please find the UCx#17 target description.


 

Attachment 1: UCx#17_description.jpg
UCx#17_description.jpg
  69   Tuesday, October 18, 2016, 12:06 Laura LambertTa#50LP-SIS  41790-5 ReadyTa#50 target description

Tuesday, October 18, 2016, 10:12

Ta#50 LP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density = 14.03 g/cm3

Target length = 3.4cm

Total Mass = 47.6889g [Incl foils + Ta wire on 6 packs]

  70   Friday, October 21, 2016, 13:47 Laura LambertUCx#18LP-SIS  41790-6 ReadyUCx#18 Target Description

 Friday, October 21, 2016, 13:46

Attached please find the UCx#18 target description.


 

Attachment 1: UCx#18_description.jpg
UCx#18_description.jpg
  71   Tuesday, March 07, 2017, 10:00 Laura LambertUCx#19LP-SIS TM442218-12 ReadyUCx#19 Target Description

 Tuesday, March 07, 2017, 09:54

Attached please find the UCx#19 target description.


 

Attachment 1: UCx#19_description.jpg
UCx#19_description.jpg
  72   Wednesday, March 08, 2017, 15:42 Laura LambertTa#51LP-SIS TM241790-4 In progressTa#51 target description

 Wednesday, March 08, 2017, 15:40

Ta#51 LP-SIS target description:

Total Ta foils = 470 [6x20 packs + 350 single discs]

Foil Thickness = 0.025mm

Target density = 14.64 g/cm3

Target length = 3.4cm

Total Mass = 49.7916g [Incl foils + Ta wire on 6 packs]


 

  75   Wednesday, May 31, 2017, 09:53 Laura LambertTa# 52LP-SIS TM442218-14 In progressTa#52 target description

 Wednesday, May 31, 2017, 09:51

Ta#52 LP-SIS target description:

Total Ta foils = 400 [4x20 packs + 320 single discs]

Foil Thickness = 0.025mm

Target density = 14.77 g/cm3

Target length = 2.9cm

Total Mass = 42.8228g [Incl foils + Ta wire on 4 packs]


 

  77   Thursday, July 06, 2017, 15:36 Anders MjosTa#55LP-SIS  42218-11 ReadyTa#55 target description

Target loaded by Matt yesterday

320 foils = 33.7832 g
4 x 20 packs = 9.1170 g
Total Weight = 42.9002 g

Length of foils is 2.88 cm

Target conditioned at ISAC Test Stand (580 A) without Ta heat shields

  78   Monday, August 21, 2017, 11:13 Laura LambertUCx#21LP-SIS  42218-15 ReadyUCx#21 Target Description

 Monday, August 21, 2017, 11:09

Attached please find the UCx#21 target description.


 

Attachment 1: target_description.JPG
target_description.JPG
  81   Monday, April 16, 2018, 09:55 Laura LambertUCx#22LP-SIS  42218-13 ReadyUCx#22 Target Description

 Monday, April 16, 2018, 09:53

Attached please find the UCx#22 target description.


 

Attachment 1: target_description.JPG
target_description.JPG
  84   Monday, August 27, 2018, 17:11 John WongUCx#24LP-SIS    ReadyUCx#24 Target Description

Monday, August 27, 2018, 17:09

See attachment for UCx#24 target description


 

Attachment 1: Capture.JPG
Capture.JPG
ELOG V2.9.2-2455