Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Target Production, Page 1 of 8  Not logged in ELOG logo
Entry  Tuesday, December 11, 2012, 15:44, Anders Mjos, SiC, HP-FEBIAD, ITW, TM4, na, na (old style fittings), Ready, Test target for the Conditioning Station 
 The target has been used for operator training previously at the ISAC Test Stand.

    9-pin connector was completed and grounded
    RH gripper arms added to the heat shield

Further documentation
on DocuShare
Entry  Friday, June 14, 2024, 14:12, Darwin Ortiz Rosales, SiC#46, HP-SIS, , , 44692-2, 45235-6, Ready, SiC#46_description SiC#46.png
 
Entry  Tuesday, September 10, 2024, 09:53, Darwin Ortiz Rosales, TiC#9, HP-SIS, , , 45447-29, 45235-19, Ready, TiC#9_Description TiC#9.png
 
Entry  Monday, October 07, 2024, 13:16, Aaron Schmidt, Ta#68, HP-SIS, ITE, TM2, 45447-26, 45235-16, Ready, Ta#68 Target Description ITE-TM2-Ta#68-HP-SIS_Target_Loading_Data.pdf
 Ta#68 HP-SIS target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.0254mm (0.0010") avg Measured. 
Entry  Friday, June 14, 2024, 14:16, Darwin Ortiz Rosales, TiC#7, HP-FEBIAD, , , 45447-5, 45235-15, Ready, TiC#7_Description TiC#7.png
Please note that this target comes in a Graphite cartridge.
Entry  Friday, September 20, 2024, 14:26, Aaron Schmidt, Ta#, LP-SIS, ITE, TM2, 45447-18, 45235-13, Ready, Ta# Target Description 
Spare for Ta#68 Ta# LP-SIS
target description: 
Total Ta foils = 470 [6x20 packs + 350 single discs]
Entry  Tuesday, August 13, 2024, 10:08, Aaron Schmidt, Ta#67 Thin Foil Target, LP-SIS, ITE, TM2, 45447-14, 45235-10, Ready, Ta#67 Thin Foil Target description & Notes Certificate_of_Analysis_-_Ta_0.01mm.pdf
  Ta#67 Thin foil LP-SIS target description: 
Total Ta foils = 470 loaded into 2 packs of 235 foils each.
Entry  Monday, August 16, 2021, 11:02, John Wong, UCx#34, LP-SIS, ITW, TM2, 44691-5, 44378-1, Ready, Target description  UCx#34_target_description.PNGUCx_34_SEM_Density_Measurements.pdf
Monday, August 16, 2021, 11:01
See attachments for the target description and SEM images

 
Entry  Thursday, November 12, 2020, 11:32, Darwin Ortiz Rosales, UCx#31, HP-SIS, ITE, TM4, 44160, 43822, Ready, UCx#31-Target_description UCx31-target_description.png
 Target full name ITE-TM4-UC#
Entry  Friday, May 31, 2019, 16:11, Aaron Schmidt, Ta#58, LP-SIS, ITE, TM2, 43044-4, 42972-7, Ready, Ta#58 Target desription Ta#58_Loading_data.pdf
 Ta#58 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Entry  Thursday, September 25, 2014, 16:01, Laura Lambert, Ta#44, HP-SIS, ITE, TM4, 38817-9, 40316-11, Ready, Ta#44 target description 
Thursday, September 25, 2014, 15:59
Ta#44 HP-SIS target description:
Total Ta foils = 400
Entry  Wednesday, July 10, 2013, 18:41, John Wong, SiC#29, HP-FEBIAD-CTL, ITE, TM4, 38481-6, 39956-4, Spent, SiC#29 - Target description SiC#29_density_measurements_final.xlsx
Wednesday, July 10, 2013, 18:32 
SiC#29 HP-FEBIAD-CTL target description: 
Total SiC foils = 510 discs 
Entry  Monday, March 31, 2014, 15:02, John Wong, TiC#4, HP-SIS, , , 38817-8, 39956-10, Spent, Target Description  TiC#4_description.JPG
 Monday, March 31, 2014, 15:00
Target consists of 360 discs of TiC + graphite foils. 
Total length = 11.7cm 
Entry  Monday, March 17, 2014, 16:15, John Wong, Ta#42, LP-SIS, ITW, TM4, 40282-1, 39956-1, Spent, Ta#42 Target description  
Monday, March 17, 2014, 16:14
Ta#42 LP-SIS target description:
Total Ta foils = 400
Entry  Thursday, May 30, 2013, 16:58, John Wong, UCx#6, LP-SIS, , TM1, 39165-6, 39230-8, Spent, UCx#6 - target description  UCx#6_specifications.PNG
 Thursday, May 30, 2013, 16:57
UCx#6 target specification, see attachment #1. 
The target is currently undergoing the final conditioning in the Evaporator#1.
Entry  Friday, August 30, 2013, 12:08, John Wong, UCx#7, LP-SIS, ITW, TM1, 38634-7, 39230-4, Spent, UCx#7 - target description UCx#7_specifications.PNG
Friday, August 30, 2013, 12:06
UCx#7 target specification, see attachment #1.
The target is assembled and going online soon.
Entry  Friday, August 30, 2013, 14:45, John Wong, NiO#2, HP-FEBIAD, , , 39530-6, 39069-4, Spent, NiO target description 
Friday, August 30, 2013, 14:38 
NiO/Ni#2                                            
Average
    Reply  Wednesday, July 04, 2012, 11:32, Anders Mjos, UO2/Nb #1, LP-FEBIAD, ITE, TM4, 38481-9, 39069-3, Spent, target assembled UO2#3_Anode_End_Cap.xlsx


    
        
            John Wong wrote:
        
        
            
             Monday, February 20, 2012, 16:25
Entry  Thursday, May 24, 2012, 11:04, John Wong, SiC#27, HP-SIS, ITE, TM4, 38817-3, 39069-2, Spent, HP-SIS SiC27 target description SiC#27_specification.png
 Thursday, May 24, 2012, 10:34
SiC#27- HPSIS target description: 
Total SiC foils = 240 discs
Entry  Thursday, October 11, 2012, 11:41, John Wong, NiO#1, HP-FEBIAD, ITE, TM4, 38481-7, 39069-1/10(lid), Spent, NiO target description  
(Should have posted this before my long vacation... Anyway, it's for documentation)
Thursday, October 11, 2012, 11:38
 
ELOG V2.9.2-2455