85
|
Friday, August 23, 2013, 10:39 |
Isaac Earle | Repair | Target 1 | Cooling | T1 Cooling Package Inlet Pressure (P1) Sensor | The T1 cooling package inlet pressure
(P1) has been dropping since approximately
May 5, 2013 from the regular operating pressure |
|
|
86
|
Monday, September 09, 2013, 16:13 |
Isaac Earle | Repair | Target 2 | Cooling | Drop in T2 Cooling Package Water Level | On September 9th in the morning Ron
Kuramoto noticed that the T2 cooling package
expansion tank level was reading NOT OK for |
|
|
87
|
Monday, September 09, 2013, 16:22 |
Isaac Earle | Repair | Target 1 | Cooling | T1 P1 Transducer Replaced | The BL1A tunnel was accessed today
to assess a faulty reading from the T1 cooling
package inlet pressure transducer (T1P1). |
|
|
88
|
Wednesday, September 11, 2013, 16:13 |
Isaac Earle | Repair | Target 2 | Cooling | T2 Cooling Package Water Leak Repair | The T2 cooling package was uncovered
this morning and a leak was found coming
from the Swagelok ball valve on the 3/4" |
|
|
91
|
Tuesday, November 12, 2013, 11:49 |
Isaac Earle | Repair | Target 1 | Target | MH Hot Cell Lab Manipulator Overhaul | Complete overhaul of all manipulators
in the Remote Handling Hot Cell Lab in the
Meson Hall was performed by Peter Dudley |
|
|
92
|
Friday, November 22, 2013, 20:26 |
Grant Minor | Repair | Target 2 | Water Leak | T2 Water Leak - Target Assembly Removed and Water Sucked Out of B/L | T2 target water leak was identified earlier
this morning.
Isaac Earle, Ron Kuramoto and Keith |
|
|
93
|
Saturday, November 23, 2013, 18:37 |
Isaac Earle | Repair | Target 2 | Target | T2-MK1 Installation | - T2-MK1 target transported from the storage
area by Isaac and Grant and installed at
the T2 monolith. All services were |
|
|
94
|
Tuesday, November 26, 2013, 10:33 |
Isaac Earle | Repair | Target 2 | Target | T2-MK2 Water Flush | The T2-MK2 target in the hot cell
was flushed with water and then purged with
air so that stagnant water is not left sitting |
|
|
95
|
Monday, January 06, 2014, 15:55 |
Isaac Earle | Repair | Target 2 | Target | T2-MK2 Repair | The leaking 10cm Be target was removed
from position 3 on the T2-MK2 target ladder
and the water ports were blanked-off with |
|
|
96
|
Thursday, January 09, 2014, 15:21 |
Isaac Earle | Repair | Target 2 | Target | T2-MK2 Electrical Check | An electrical check was performed
on the T2-MK2 profile monitor by Bill Rawnsley.
All signals produced the expected response, |
|
|
100
|
Monday, January 20, 2014, 11:51 |
Isaac Earle | Repair | Target 2 | Water Leak | Water Leak from Meson Hall Mezzanine Near T2 | A water leak developed this morning
from a city water supply line at a hose connection
near the T2 expansion tank. Water was |
|
|
104
|
Monday, March 03, 2014, 11:55 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Monitor Moved to HC | The T2 Protect Monitor was transported
from the beam line to the hot cell this morning
using the transport flask. The move |
|
|
105
|
Tuesday, March 11, 2014, 13:50 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Monitor Returned to Beam Line | After the monitor assembly was moved to
the hot cell, electrical checks were performed
by Bill Rawnsley which showed the same results |
|
|
109
|
Tuesday, April 01, 2014, 10:17 |
Isaac Earle | Repair | Target 2 | Target | T2 Profile Monitor Actuation - Fault Report | The T2 profile monitor cannot be actuated
from the control room. When the solenoid
valve that supplies air to the air cylinders |
|
|
114
|
Friday, May 02, 2014, 15:49 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Monitor Elevation Correction | When beam was started in mid-April, it
was observed by Operations Group that with
the beam centered vertically within the protect |
|
|
115
|
Monday, May 05, 2014, 15:46 |
Isaac Earle | Repair | Target 2 | Target | T2 Protect Returned to B/L | The T2 protect monitor was returned to
the beam line using the shielded flask. The
alignment pin did not align with the hole |
|
|
118
|
Wednesday, July 02, 2014, 16:56 |
Isaac Earle | Repair | Target 1 | Cooling | T1-P2 and T2-P1 pressure transducers replaced. | The T1-P2 (outlet) pressure transducer
was replaced to address an erroneous signal.
The XTPAGE value now reads as expected. |
|
|
119
|
Monday, August 11, 2014, 16:57 |
Isaac Earle | Repair | Target 2 | Other | Air Amplifier Increased Cycle Rate | On Friday August 8th Ron Kuramoto observed
that the Meson Hall air amplifier cycle speed
had increased. Cycle time measurements |
|
|
120
|
Wednesday, August 13, 2014, 16:34 |
Isaac Earle | Repair | Target 1 | Other | Amplified Air Leak Narrowed Down to T1 Area | During the maintenance day today,
amplified air to the T1 area was valved off
in an attempt to pin point the location of |
|
|
121
|
Thursday, September 11, 2014, 15:36 |
Ron Kuramoto | Repair | Target 2 | Water Leak | 1A Tunnel T2 Cu-ALCW water leak | On Sep. 3rd
during the 6 hr maintenance day, Doug Preddy |
|