  85   Friday, August 23, 2013, 10:39 Isaac EarleRepairTarget 1CoolingT1 Cooling Package Inlet Pressure (P1) Sensor The T1 cooling package inlet pressure
(P1) has been dropping since approximately
May 5, 2013 from the regular operating pressure
 T1_P1_plot_(may-aug).jpgT1_P1_plot.jpg 
  86   Monday, September 09, 2013, 16:13 Isaac EarleRepairTarget 2CoolingDrop in T2 Cooling Package Water Level On September 9th in the morning Ron
Kuramoto noticed that the T2 cooling package
expansion tank level was reading NOT OK for
  
  87   Monday, September 09, 2013, 16:22 Isaac EarleRepairTarget 1CoolingT1 P1 Transducer Replaced The BL1A tunnel was accessed today
to assess a faulty reading from the T1 cooling
package inlet pressure transducer (T1P1).
  
  88   Wednesday, September 11, 2013, 16:13 Isaac EarleRepairTarget 2CoolingT2 Cooling Package Water Leak Repair The T2 cooling package was uncovered
this morning and a leak was found coming
from the Swagelok ball valve on the 3/4"
  
  91   Tuesday, November 12, 2013, 11:49 Isaac EarleRepairTarget 1TargetMH Hot Cell Lab Manipulator Overhaul Complete overhaul of all manipulators
in the Remote Handling Hot Cell Lab in the
Meson Hall was performed by Peter Dudley
  
  92   Friday, November 22, 2013, 20:26 Grant MinorRepairTarget 2Water LeakT2 Water Leak - Target Assembly Removed and Water Sucked Out of B/LT2 target water leak was identified earlier
this morning.
Isaac Earle, Ron Kuramoto and Keith
 T2_tgt_water_leak_22Nov2013-006-before-suck.JPGT2_tgt_water_leak_22Nov2013-013-after-suck.JPGT2_tgt_water_leak_22Nov2013-016.JPGT2_tgt_water_leak_22Nov2013-017.JPG 
  93   Saturday, November 23, 2013, 18:37 Isaac EarleRepairTarget 2TargetT2-MK1 Installation- T2-MK1 target transported from the storage
area by Isaac and Grant and installed at
the T2 monolith.  All services were
  
  94   Tuesday, November 26, 2013, 10:33 Isaac EarleRepairTarget 2TargetT2-MK2 Water Flush The T2-MK2 target in the hot cell
was flushed with water and then purged with
air so that stagnant water is not left sitting
  
  95   Monday, January 06, 2014, 15:55 Isaac EarleRepairTarget 2TargetT2-MK2 Repair The leaking 10cm Be target was removed
from position 3 on the T2-MK2 target ladder
and the water ports were blanked-off with
 DSC_6622.JPGDSC_6623.JPGDSC_6626.JPGIMG_1809.JPG 
  96   Thursday, January 09, 2014, 15:21 Isaac EarleRepairTarget 2TargetT2-MK2 Electrical Check An electrical check was performed
on the T2-MK2 profile monitor by Bill Rawnsley.
 All signals produced the expected response,
  
  100   Monday, January 20, 2014, 11:51 Isaac EarleRepairTarget 2Water LeakWater Leak from Meson Hall Mezzanine Near T2 A water leak developed this morning
from a city water supply line at a hose connection
near the T2 expansion tank.  Water was
  
  104   Monday, March 03, 2014, 11:55 Isaac EarleRepairTarget 2TargetT2 Protect Monitor Moved to HC The T2 Protect Monitor was transported
from the beam line to the hot cell this morning
using the transport flask.  The move
 IMG_1934.JPGIMG_1939.JPGIMG_1973.JPG 
  105   Tuesday, March 11, 2014, 13:50 Isaac EarleRepairTarget 2TargetT2 Protect Monitor Returned to Beam LineAfter the monitor assembly was moved to
the hot cell, electrical checks were performed
by Bill Rawnsley which showed the same results
  
  109   Tuesday, April 01, 2014, 10:17 Isaac EarleRepairTarget 2TargetT2 Profile Monitor Actuation - Fault ReportThe T2 profile monitor cannot be actuated
from the control room.  When the solenoid
valve that supplies air to the air cylinders
  
  114   Friday, May 02, 2014, 15:49 Isaac EarleRepairTarget 2TargetT2 Protect Monitor Elevation CorrectionWhen beam was started in mid-April, it
was observed by Operations Group that with
the beam centered vertically within the protect
 RHB_6851.JPGRHB_6850.JPG 
  115   Monday, May 05, 2014, 15:46 Isaac EarleRepairTarget 2TargetT2 Protect Returned to B/LThe T2 protect monitor was returned to
the beam line using the shielded flask.  The
alignment pin did not align with the hole
  
  118   Wednesday, July 02, 2014, 16:56 Isaac EarleRepairTarget 1CoolingT1-P2 and T2-P1 pressure transducers replaced.The T1-P2 (outlet) pressure transducer
was replaced to address an erroneous signal.
 The XTPAGE value now reads as expected.
  
  119   Monday, August 11, 2014, 16:57 Isaac EarleRepairTarget 2OtherAir Amplifier Increased Cycle RateOn Friday August 8th Ron Kuramoto observed
that the Meson Hall air amplifier cycle speed
had increased.  Cycle time measurements
  
  120   Wednesday, August 13, 2014, 16:34 Isaac EarleRepairTarget 1OtherAmplified Air Leak Narrowed Down to T1 Area During the maintenance day today,
amplified air to the T1 area was valved off
in an attempt to pin point the location of
  
  121   Thursday, September 11, 2014, 15:36 Ron KuramotoRepairTarget 2Water Leak1A Tunnel T2 Cu-ALCW water leakOn Sep. 3rd
during the 6 hr maintenance day, Doug Preddy
 IMG_1007sm.JPGIMG_1009sm.JPG 